Teleoperator human factors study
The progress made on the Teleoperator Human Factors Study program during the period of September 7, 1985 to October 6, 1985 is discussed. Technical and programmatic problems that were encountered are discussed along with activity planned for the following month. The main portion of the report has been separated into four sections: Work Performed, Future Work, Problems Encountered, and Cost Information.