First high power pulsed tests of a dressed 325 MHz superconducting single spoke resonator at Fermilab

In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, {beta} = 0.22 superconducting single-spoke resonator (SSR1) has been tested for the first time with its input power coupler. Previously, this cavity had been tested CW with a low power, high Q{sub ext} test coupler; first as a bare cavity in the Fermilab Vertical Test Stand and then fully dressed in the SCTF. For the tests described here, the design input coupler with Q{sub ext} {approx} 10{sup 6} was used. Pulsed power was provided by a Toshiba E3740A 2.5 MW klystron.

43 PARTICLE ACCELERATORS↗

Microphonics control for Project X

The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

43 PARTICLE ACCELERATORS↗