Search NASA⌕ Search

Engineering topics

Brau, J.

Publications and source records attributed to Brau, J..

Lycoris - A large-area, high resolution beam telescope

We note that a high-resolution beam telescope is one of the most important and demanding infrastructure components at any test beam facility. Its main purpose is to provide reference particle tracks from the incoming test beam particles to the test beam users, which allows measurement of the performance of the device-under-test (DUT). LYCORIS, a six-plane compact beam telescope with an active area of ~ 10 x 10 cm 2 (extensible to 10 x 20 cm 2 ) was installed at the DESY II Test Beam Facility in 2019, to provide a precise momentum measurement in a 1 T solenoid magnet or to provide tracking over a large area. The overall design of Lycoris will be described as well as the performance of the chosen silicon sensor. The 25 μm pitch micro-strip sensor used for Lycoris was originally designed for the SiD detector concept for the International Linear Collider. It adopts a second metallization layer to route signals from strips to the bump-bonded KPiX ASIC and uses a wire-bonded flex cable for the connection to the DAQ and the power supply system. This arrangement eliminates the need for a dedicated hybrid PCB. Its performance was tested for the first time in this project. The system has been evaluated at the DESY II Test Beam Facility in several test-beam campaigns and has demonstrated an average single-point resolution of 7.07 μm.

47 OTHER INSTRUMENTATION↗

A silicon-tungsten electromagnetic calorimeter with integrated electronics for the International Linear Collider

We present an update of the development of an electromagnetic calorimeter for the Silicon Detector concept for a future linear electron-positron collider. Mechanical progress for a full barrel calorimeter that provides a more complete basis for simulation is discussed. Crosstalk problems in the first version of the sensor were found in a first testbeam study, and a second version of the sensor is now beginning testing.

43 PARTICLE ACCELERATORS↗

ILC Operating Scenarios: ILC Parameters Joint Working Group

The ILC Technical Design Report documents the design for the construction of a linear collider which can be operated at energies up to 500 GeV. This report summarizes the outcome of a study of possible running scenarios, including a realistic estimate of the real time accumulation of integrated luminosity based on ramp-up and upgrade processes. The evolution of the physics outcomes is emphasized, including running initially at 500 GeV, then at 350 GeV and 250 GeV. The running scenarios have been chosen to optimize the Higgs precision measurements and top physics while searching for evidence for signals beyond the standard model, including dark matter. In addition to the certain precision physics on the Higgs and top that is the main focus of this study, there are scientific motivations that indicate the possibility for discoveries of new particles in the upcoming operations of the LHC or the early operation of the ILC. Follow-up studies of such discoveries could alter the plan for the centre-of-mass collision energy of the ILC and expand the scientific impact of the ILC physics program. It is envisioned that a decision on a possible energy upgrade would be taken near the end of the twenty year period considered in this report.

43 PARTICLE ACCELERATORS↗