Search NASA⌕ Search

Engineering topics

Breidenbach, Martin

Publications and source records attributed to Breidenbach, Martin.

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

The SiD Digital ECal Based on Monolithic Active Pixel Sensors

The SiD detector concept capitalizes on high granularity in its tracker and calorimeter to achieve the momentum resolution and particle flow calorimetry physics goals in a compact design. The collaboration has had a long interest in the potential for improved granularity in both the tracker and ECal with an application of monolithic active pixel sensors (MAPS) and a study of MAPS in the SiD ECal was described in the ILC TDR. Work is progressing on the MAPS application in an upgraded SiD design with a prototyping design effort for a common SiD tracker/ECal design based on stitched reticules to achieve 10 × 10 cm2 sensors with 25 × 100 micron2 pixels. Application of large area MAPS in these systems would limit delicate and expensive bump-bonding, provide possibilities for better timing, and should be significantly cheaper than the TDR concept due to being a more conventional CMOS foundry process. The small pixels significantly improve shower separation. Recent simulation studies confirm previous performance projections, indicating electromagnetic energy resolution based on digital hit cluster counting provides better performance than the SiD TDR analog design based on 13 mm2 pixels. Furthermore, the two shower separation is excellent down to the millimeter scale. Geant4 simulation results demonstrate these expectations.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Development of a large active area beam telescope based on the SiD microstrip sensor

A beam telescope as one of the most important and often requested test beam equipment provides particle tracking to test beam users. At the DESY II test beam facility, a new beam telescope called Lycorisbased on a microstrip sensor has been designed to address the user demands for momentum measurement in a 1 T solenoid magnet or large area tracking with limited space (3.5 cm between the potential user device and the magnet inner wall). Lycorisis designed to provide a high-precision resolution of at least ~10 µm along the bending direction, and a large active area of 10x10 cm 2 to cover at least 90% of the beam particles at energies of 1-6 GeV. The microstrip sensor was originally designed for the Silicon Detector (SiD) at the International Linear Collider (ILC), which adopted a hybrid-less design, i.e. a second metallization layer is used to route signals from strips to the bump-bonded ASIC, and from the ASIC to a wire-bond pad to the outside. This hybrid-less arrangement eliminates the need for a complex hybrid design, and its functioning is first-time tested in this project. The performance of the sensor modules was firstly tested in the lab then at the DESY II test beam facility in August/September 2018, and the results will be presented here. In addition, a summary will be given at the end with an overview of the ongoing test beam campaign of the Lycorisprototype in February 2019.

47 OTHER INSTRUMENTATION↗

A Silicon-Tungsten ECal with Integrated Electronics

We summarize recent R&D progress for a silicon-tungsten electromagnetic calorimeter (ECal) with integrated electronics, designed to meet the ILC physics requirements. A basic physics requirement for ILC detectors is that they provide excellent reconstruction of hadronic final states. This allows access to new physics which is complementary to the LHC. One statement for a requirement on jet reconstruction is that intermediate particles which decay into jets, such as W, Z, or top, can be identified and isolated. This places unprecedented requirements on 2-jet or 3-jet mass resolution, typically at the level of 3-5% using the PFA technique, which makes challenging demands on the calorimeters. The electromagnetic energy resolution is not expected to limit jet resolution using a PFA. However, particle separation - photon-photon and charged hadron-photon - is crucial. In addition, if one provides this kind of imaging calorimeter to meet the PFA needs, these same features will also be put to good use for reconstruction of specific tau decay modes (to enable final-state polarization measurement), to 'track' photons (even if originating from a vertex displaced from the interaction point), to track MIPS, and so forth. Figure 1 and Table 1 provide some context for our ECal design within the SiD detector concept, along with some main design parameters. More detail is included in the presentation.

43 PARTICLE ACCELERATORS↗