Considerations for Non-Endangerment and GCS Site Closure
Presented by NETL at Groundwater Protection Council UIC Meeting, NRAP workshop, 02/20
Engineering topics
Publications and source records attributed to Brown, Chris.
Presented by NETL at Groundwater Protection Council UIC Meeting, NRAP workshop, 02/20
The Atomic Energy of Canada Limited has an initiative to transform the Chalk River Laboratory (CRL) facility into an updated research facility to continue nuclear energy and other energy research which is paramount to the continued growth of the energy sector in Canada. The Near Surface Disposal Facility (NSDF) will be licensed by Canadian Nuclear Safety Commission prior to construction and receipt of waste. The NSDF has been designed to allow for disposal of waste in a manner that is protective of the environment and human health. The Engineered Containment Mound (ECM) is a major structure associated with the NSDF design to allow for long-term disposal of 1,000,000 cubic meters of LLRW. This paper describes the design of major components of the ECM: ECM geometry, perimeter berm, base liner system, and cover system. (authors)
Biofilm growth has been an ongoing issue for US and Russian water systems on the International Space Station, and is a critical issue for exploration missions in which water systems must be designed to accommodate dormant periods of up to one year. On ISS, Russian condensate plumbing has previously clogged with biomass, requiring condensate plumbing to now be regularly replaced. In the US Segment, the release of biofilm from the Water Processor waste tank has clogged a solenoid valve downstream of the tank, resulting in the costly replacement of the inlet separator and process pump. Subsequent management of the biofilm in the waste tank involves restrictions on tank cycles to limit the release of biomass and an additional filter to protect downstream components. Engineering personnel are now evaluating concepts to better manage the biomass, including the use of microbial inhibitors and UV LEDs. Though current ISS operations could likely be sustained for the duration of ISS, a more effective method must be developed for managing the growth and release of biomass in future exploration vehicles. Biofilm management for future missions is complicated by the requirement to accommodate extended periods of dormancy during which time the water system will be stagnant. The current approach under consideration is to flush the waste water with product water to reduce the organic content followed by use of microbial inhibitors or UV. However, other concepts may also be developed based on ongoing research.
The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.
Orion and Commercial Crew Program (CCP) Partners have chosen to use frangible joints for certain separation events. The joints currently available are zero failure tolerant and will be used in mission safety applications. The goal is to further develop a NASA designed redundant frangible joint that will lower flight risk and increase reliability. FY16 testing revealed a successful design in subscale straight test specimens that gained efficiency and supports Orion load requirements. Approach / Innovation A design constraint is that the redundant joint must fit within the current Orion architecture, without the need for additional vehicle modification. This limitation required a design that changed the orientation of the expanding tube assemblies (XTAs), by rotating them 90deg from the standard joint configuration. The change is not trivial and affects the fracture mechanism and structural load paths. To address these changes, the design incorporates cantilevered arms on the break plate. The shock transmission and expansion of the XTA applies force to these arms and creates a prying motion to push the plate walls outward to the point of structural failure at the notched section. The 2014 test design revealed that parts could slip during functioning wasting valuable energy needed to separate the structure with only a single XTA functioning. Dual XTA functioning fully separated the assembly showing a discrepancy can be backed up with redundancy. Work on other fully redundant systems outside NASA is limited to a few patents that have not been subjected to functionality testing Design changes to prevent unwanted slippage (with ICA funding in 2015) showed success with a single XTA. The main goal for FY 2016 was to send the new Flat H RFJ to WSTF where single XTA test failures occurred back in 2014. The plan was to gain efficiency in this design by separating the Flat H RFJ with thicker ligaments with dimensions baselined in 2014. Other modifications included geometry changes to better disperse loads paths and to minimize air gaps. The design additionally added more structural strength to enhance the structural limits in static loads testing. The design also implemented a smoother load line through the assembly. Results / Knowledge Gained The new Flat H RFJ successfully fractured at WSTF with thicker ligaments and lower cord size. Where failure to separate occurred earlier, there is now excessive energy available for structural separation. The new challenge to provide some structural support to prevent secondary fracturing of the break plate remains to be completed. This future work is being funded by the JSC Engineering Directorate in 2017 to elevate the TRL on curved Flat H RFJs that configure with the Orion Service Panel Separation. Additional funding from JSC Engineering will provide new design testing to avoid secondary fracturing.
Not Available
The National Risk Assessment Partnership (NRAP) is developing a science-based toolset for the analysis of potential impacts to groundwater chemistry from CO 2 injection (www.netldoe.gov/nrap). The toolset adopts a stochastic approach in which predictions address uncertainties in shallow underwater and leakage scenarios. It is derived from detailed physics and chemistry simulation results that are used to train more computationally efficient models,l referred to here as reduced-order models (ROMs), for each component system. In particular, these tools can be used to help regulators and operators understand the expected sizes and longevity of plumes in pH, TDS, and dissolved metals that could result from a leakage of brine and/or CO 2 from a storage reservoir into aquifers. This information can inform, for example, decisions on monitoring strategies that are both effective and efficient. We have used this approach to develop predictive reduced-order models for two common types of reservoirs, but the approach could be used to develop a model for a specific aquifer or other common types of aquifers. In this paper we describe potential impacts to groundwater quality due to CO 2 and brine leakage, discuss an approach to calculate thresholds under which "no impact" to groundwater occurs, describe the time scale for impact on groundwater, and discuss the probability of detecting a groundwater plume should leakage occur.