Search NASA⌕ Search

Engineering topics

Brown, David L

Publications and source records attributed to Brown, David L.

New controller for high voltage converter modulator at spallation neutron source

The Spallation Neutron Source (SNS) has developed a new control system for the High Voltage Convertor Modulator (HVCM) at the SNS to replace the original control system which is approaching obsolescence. The original system was based on controllers for similar high voltage systems that were already in use [1]. The new controller, based on National Instruments PXI/FlexRIO Field Programmable Gate Array (FPGA) platform, offers enhancements such as modular construction, flexibility and non-proprietary software. The new controller also provides new capabilities like various methods for modulator pulse flattening, waveform capture, and first fault detection. This paper will discuss the design of the system, including the human machine interface, based on lessons learned at the SNS and other projects. It will also discuss performance and other issues related to its operation in an accelerator facility which requires high availability. To date, 73% of the operational HVCMs have been upgraded to with the new controller, and the remainder are scheduled for completion by mid-2017.

Wezensky, Mark W↗

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES

Satisfying operational procedures and limits for the beam target interface is a critical concern for high power operation at spallation neutron sources. At the Oak Ridge Spallation Neutron Source (SNS) a number of protective measures are instituted to ensure that the beam position, beam size and peak intensity are within acceptable limits at the target and high power Ring Injection Dump (RID). The high power beam dump typically handles up to 50 100 kW of beam power and its setup is complicated by the fact that there are two separate beam components simultaneously directed to the dump. The beam on target is typically in the 800-1000 kW average power level, delivered in sub- s 60 Hz pulses. Setup techniques using beam measurements to quantify the beam parameters at the target and dump will be described. However, not all the instrumentation used for the setup and initial qualification is available during high power operation. Additional techniques are used to monitor the beam during high power operation to ensure the setup conditions are maintained, and these are also described.

Blokland, Willem↗