The Design of a Multiphase CO2 Turbine Test Facility
As the energy market continues to evolve with increased renewables, such as solar and wind energy, the need to balance energy demand with its availability has become increasingly more challenging. The country’s aggressive decarbonization goals in the upcoming decades will increase renewable energy market penetration, thus exacerbating the disparity between energy demand and renewable resource availability. Long-duration energy storage technologies, such as pumped thermal energy storage (PTES), are potential solutions to this challenge with high potential round-trip efficiency (RTE), no geological or geographical constraints, and low safety risks. The charge mode of a PTES system operates a heat pump cycle, converting input power to thermal energy in hot and cold reservoirs. Fundamentally, heat pumps are commonly used in daily life, but the operating conditions required by high RTE PTES systems are outside the design experience of these systems. The low-pressure side of the cycle for a supercritical CO2 (sCO2) PTES operates just above the vapor-dome and potentially drives the turbine to expand into the dome, resulting in multiphase operation in the rear stages of the turbine. This paper presents the design of the test facility for an advanced multiphase-tolerant sCO2 turbine for the heat pump of a PTES system. Heat rejection and pressure loss estimations for the multiphase sections of the test loop presented unforeseen challenges.