Search NASA⌕ Search

Engineering topics

Bruce, Robert

Publications and source records attributed to Bruce, Robert.

Decommissioning, Decontamination, and Disposal of LLW-LL, and ILW-LL at a Former Rare Earths Processing Facility in Malaysia - 19087

Geosyntec Consultants, Inc. (Geosyntec) was the design-build Contractor for a project involving the remediation and disposal of low level (LLW-LL and ILW-LL) NORM and TENORM wastes at a former rare earth processing facility in Malaysia. These sites were associated with a plant that extracted rare earth elements from local tin ores. Because of the naturally occurring radioactivity contained in the raw materials, these productions resulted in by-products and residues containing LLW-LL and ILW-LL thorium hydroxide and uranium hydroxide. The total mass of uranium (∼120 tons) and thorium (∼1,200 tons) managed in a single repository required the project design incorporate requirements related to inventory, security and safeguards around nuclear precursor materials. The requirement to consider a performance over a period of more than 10,000 years led to significant challenges in design and modeling of the disposal facility as this disposal facility was purposely designed and permitted as a final disposal for the LLW-LL and ILW-LL. The first phase of the project was the decommissioning, decontamination, and demolition of the 14- acre former rare earth processing plant and excavation of contaminated soils, construction of an engineered cell at the repository for waste disposal, and transportation and disposal of the waste materials into the cell. Final status surveys were carried out to allow the site to be successfully released by the Malaysian regulatory authorities as a clean site for re-development as common industrial use. Over 11,000 loads of material, including approximately 75,000 cubic meters of excavated soils and plant debris, were transported in specially designed steel transport boxes on public roads for disposal in the engineered cell. The second phase of the project included the design and construction of a second engineered cell, enhanced with protective barrier systems and a final cover system constructed of natural materials. Ancillary facilities such as substations, offices, processing buildings, and wastewater treatment plants were constructed to support retrieval and processing of the materials from more than 87,000 individual drums using a semi-automated process. The drums, waste packages, and other materials in the storage facility were systematically extracted, sorted, inventoried, solidified using Portland cement, transported, and disposed in the cell. All temporary facilities were decontaminated, demolished, and disposed in the cell. Radiological inventory and radiation safety programs were implemented to quantify the waste activity and to control exposure to workers and the public during the project. The total mass of radioactive contaminated waste disposed in the two projects is nearly 200,000 tons. The projects were carried out under a high level of scrutiny from Malaysian and international regulatory bodies. Between 2014 and 2017, performance monitoring and modeling activities were carried out to demonstrate that the disposal facility was performing in accordance with design requirements established by regulatory agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Propulsion Ground Testing: Planning for the Future

Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre-exiting test facilities. The key words in the previous sentence are 'substantial investment.' In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based on both life cycle cost decisions in an environment in which the more immediate challenge of front-end capital investment oftentimes is the linchpin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.

Bruce, Robert↗

Propulsion Ground Testing with High Test Peroxide: Lessons Learned

Propulsion Ground Testing with High Test Peroxide (85 to 98% concentration) began at the NASA John C. Stennis Space Center in calendar year 1998, when the E3 Test Facility was modified to accomodate hydrogen peroxide (H2O2) in order to suport the research and development testing of the USAF Upper Stage Flight Experiment rocket engine. Since that time, efforts have continued to provide actual and planned test services to various customers, both U.S. Government and Commercial, in the ground test of many test articles, ranging from gas generators, to catalyst beds, to turbomachinery, to main injectors, to combustion chambers, to integrated rocket engines, to integrated stages. Along this path, and over the past 4 years, there has been both the rediscovery of previously learned lessons, through literature search, archive review, and personal interviews, as well as the learning of many new lessons as new areas are explored and new endeavors are tried. This paper will summarize those lessons learned in an effort to broaden the knowledge base as High Test Peroxide is considered more widely for use in rocket propulsion applications.

Bruce, Robert↗

Test Facilities Capability Handbook

The John C. Stennis Space Center (SSC) is located in Southern Mississippi near the Mississippi-Louisiana state line. SSC is chartered as the National Aeronautics and Space Administration (NASA) Center of Excellence for large space transportation propulsion system testing. This charter has led to many unique test facilities, capabilities and advanced technologies provided through the supporting infrastructure. SSC has conducted projects in support of such diverse activities as liquid, and hybrid rocket testing and development; material development; non-intrusive plume diagnostics; plume tracking; commercial remote sensing; test technology and more. On May 30, 1996 NASA designated SSC the lead Center for rocket propulsion testing, giving the Center total responsibility for conducting and/or managing all NASA rocket engine testing. Test services are now available not only for NASA but also for the DoD, other government agencies, academia, and industry. This handbook was developed to provide a summary of the capabilities that exist within SSC. It is intended as a primary resource document, which will provide the reader with the top-level capabilities and characteristics of the numerous test facilities, test support facilities, laboratories, and services. Due to the nature of continually evolving programs and test technologies, descriptions of the Center's current capabilities are provided. Periodic updates and revisions of this document will be made to maintain is completeness and accuracy.

Taliancich, Paula↗

Pluton emplacement and magmatic arc construction: A model from the Patagonian batholith

A model of batholithic construction in Andean arcs and its applicability to possibly similar environments in the past is described. Age and compositional data from the Patagonian batholith of southern Chile show a long history of magmatism in any given area (total age range is 15 to 157 Ma), but different regions appear to have different magmatic starting ages. Furthermore, mafic rocks seem to be the oldest components of any given region. An assembly line model involving semicontinuous magmatism and uplift was outlined, which has implications for other terranes: uplift rates will be proportional to observed ranges in age, and total uplift will be proportional to the age of the oldest pluton in any given area. It is suggested that misleading results would be obtained if only small areas of similar terranes in the Archean were available for study.

Bruce, Robert↗