Cost estimation: An expert-opinion approach

A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

Buffalano, C.↗

Nonlinear models for estimating GSFC travel requirements

A methodology is presented for estimating travel requirements for a particular period of time. Travel models were generated using nonlinear regression analysis techniques on a data base of FY-72 and FY-73 information from 79 GSFC projects. Although the subject matter relates to GSFX activities, the type of analysis used and the manner of selecting the relevant variables would be of interest to other NASA centers, government agencies, private corporations and, in general, any organization with a significant travel budget. Models were developed for each of six types of activity: flight projects (in-house and out-of-house), experiments on non-GSFC projects, international projects, ART/SRT, data analysis, advanced studies, tracking and data, and indirects.

Buffalano, C.↗

An evaluation of contractor projected and actual costs

GSFC contractors with cost-plus contracts provide cost estimates for each of the next four quarters on a quarterly basis. Actual expenditures over a two-year period were compared to the estimates, and the data were sorted in different ways to answer several questions and give quantification to observations, such as how much does the accuracy of estimates degrade as they are made further into the future? Are estimates made for small dollar amounts more accurate than for large dollar estimates? Other government agencies and private companies with cost-plus contracts may be interested in this analysis as potential methods of contract management for their organizations. It provides them with the different methods one organization is beginning to use to control costs.