Search NASA⌕ Search

Engineering topics

Burns, Carolyn A. M.

Publications and source records attributed to Burns, Carolyn A. M..

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation (Rev.1)

The Hanford Tank Waste Treatment and Immobilization Plant Low Activity Waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of discovering that sampling locations do not meet the qualification criteria on the full-scale stacks. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. For this analysis, the range of qualified flow rates listed is conservatively based on the average DV through 6 DV for LV-S1, LV-S2, and LV-C2, and 1/3 DV to 3 DV for LV-S3. Table S1 lists the operating flow rates along with the conservative lower and upper qualified stack flow rates for each of the LAW facility stacks. For each stack, the operating flow is below the upper qualified stack.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Characterization and Evaluation on FFF Manufactured 316H and ODS Steels

The Advanced Materials and Manufacturing Technology (AMMT) program develops cross-cutting technologies in support of a broad range of nuclear reactor technologies and maintains U.S. leadership in materials and manufacturing technologies for nuclear energy applications. The overarching vision of AMMT is to accelerate the development, qualification, demonstration, and deployment of advanced materials and manufacturing technologies to enable reliable and economical nuclear energy. Solid-state advanced manufacturing techniques can overcome some of the challenges in liquid-based additive manufacturing (AM) processes and should therefore be considered in material design and manufacturing as well. The work presented in this report forms part of a study on solid-state AM techniques of 316 stainless steels (SS) and oxide dispersion strengthened (ODS) steel components and supports the vision and goals of the AMMT program relevant to accelerate the development and deployment of advanced manufacturing processes. Achieving this can provide a safety improvement through larger safety margins, economic benefit for higher efficiency during operation, and a cost reduction through more effective manufacturing processes and less waste. This study provides preliminary information on development of the fused-filament fabrication (FFF) process using different powder types to demonstrate the sensitivity, and therefore the characterization of these sample components. The full solid-state manufacturing feasibility study will be completed and reported in a final feasibility evaluation during 2025. The study investigation used two 14YWT ODS powder batches, which provided information and the effect of different powder morphologies on manufacturability. The two 316SS powders demonstrated the effect of powder size on the manufacturability using FFF. Two product forms, namely a honeycomb structure and flat samples, were manufactured to demonstrate the flexibility of product form.

36 MATERIALS SCIENCE↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gravitational vortex disruption in mesofluidic separators

Typically, bump array devices separate submicrometer particles where gravitational effects remain small. However, as particle size increases from a few micrometers to hundreds of micrometers, gravitational effects become important and settling may induce vortex formation. Here, this article shows under laminar flow that these vortices suffice to disrupt flow fields, frustrating particle separation. The limiting diameter, above which vortices do form, is determined, and the dependence of the limiting diameter on viscosity, particle properties, and separator orientation is quantified.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Physical and Flow Properties of Glass Forming Chemicals (V2O5, SnO, SnO2, Cr2O3, FeCr2O4, and ZrSiO4) and Mixtures

For a sustainable nuclear waste vitrification process at the Hanford Tank Waste Treatment and Immobilization Plant (WTP), proper selection and consistent supply of glass-forming chemicals (GFCs) are crucial. Establishing rigorous acceptance criteria for the characterization of GFCs will be required to operate the vitrification facility and to mitigate any processing issues or failures. Low-activity wastes (LAW) are blended with GFCs to form slurry melter feeds and vitrified in a melter. To enhance properties of waste glasses, new chemicals are being introduced to the current GFC mixture (Vienna et al. 2016; Muller et al. 2017, 2019). In this study, three new GFCs were evaluated for enhanced LAW glass formulations: chromium oxide (Cr 2 O 3 ), vanadium oxide (V 2 O 5 ), and stannic oxide (SnO 2 ). These three oxide components are included in enhanced waste glass (EWG) formulations and GFCs with the appropriate physical and flow properties are needed. As a starting point, single metal oxide GFCs: Cr 2 O 3 , V 2 O 5 , and SnO 2 were sourced and tested. To characterize these new individual GFCs and mixtures of GFCs, the industrial bulk characterization consultant, Jenike and Johanson, was employed to measure physical and flow properties of individual GFCs and their mixtures. Pacific Northwest National Laboratory (PNNL) also measured several selected physical properties for data evaluation as a quality assurance step. In addition, PNNL measured physical and rheological properties of slurry melter feeds containing those GFCs. Subsequent data analyses and verification were conducted. The purpose of this report is to assess the applicability of these GFCs for LAW vitrification based on their properties. This report will help understand measured data and evaluate new GFCs for use. Moreover, this report may give useful insights to help troubleshoot any GFC and melter feed transport and mixing issues that arise during processing, leading to a successful cleanup mission at WTP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industrial scale mesofluidic particle separation

Here we explore the potential of a mesofluidic separator that fits within industrial piping and is designed to remove large aspherical particles out of an abrasive slurry at fast flow rates. Mesofluidic separators have recently demonstrated separation of spherical particles at flow rates of ~1 gallon/min (gpm) (6.3.10 -5 m 3 /s). Yet, the performance of these separators at flow rates achievable within industrial piping have not been explored. Here we evaluate the permeate flowrate fraction, large particle mass fraction, and pressure drop from approximately 35-100 gpm (2.2.10-3-6.3.10-3 m 3 /s) in a three inch tube using an abrasive and modestly non-spherical slurry. Faster flow rates may be achieved with larger pumps and larger diameters. We find the permeate fraction and pressure drop both increase with flow rate, though the pressure drop remains modest. Only two feet of inserts removed 97.6±2.1% of large particles for conditions tested. Separation was demonstrated in both vertical and horizontal orientations with the horizontal orientation benefiting marginally from gravitational settling.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Dissolution of Fluoride Salts in Hanford Tank Waste

The Direct Feed High-Level Waste (DFHLW) strategy seeks to bypass the Hanford Waste Treatment and Immobilization Plant Pretreatment Facility while retaining some processing functions to maximize waste feed loading and minimize high-level waste (HLW) waste volume. The DFHLW flowsheet needs leaching, washing, and solids concentration operations either in new or existing tanks. The effectiveness and efficiency of sludge washing has a substantial impact on DST space, mission duration, and the evaporation and low-activity waste (LAW) treatment operations required by these large wash-water additions. One target species requiring washing is fluoride. The HLW glass composition limits for fluorine drive operations to dissolve fluoride-bearing salts into the LAW fraction and thereby maximize waste loading in HLW glass. The fluoride in many high-level wastes at Hanford is predominantly in the form of fluoride-salt precipitates: villiaumite (NaF), kogarkoite (Na 3 FSO 4 ), and natrophosphate (Na 7 F(PO 4 ) 2 ·19H 2 O). Fluoride produces melter off-gas that creates corrosion risk in the off-gas system piping, while the sulfate and phosphate in the fluoride double salts kogarkoite and natrophosphate can be detrimental to glass waste loading. Fluoride salts are sparingly soluble, with solubilities ranging from approximately 40 to 130 kg per kL of pure water, and the dissolution kinetics of the three fluoride salts are not well known. Unexpected delays in a tank dissolution process could be encountered as a result of the lack of information about dissolution rates. In addition, if the double salts show transient non-stoichiometric dissolution of fluoride versus phosphate or sulfate, unexpectedly high concentrations of one of these other constituents could be produced. Washington River Protection Solutions authorized Pacific Northwest National Laboratory to collect the available data for fluoride salt dissolution rate, provide a scoping estimate of dissolution time if possible, and identify gaps in the understanding and predictive capability for estimating dissolution time. Open literature and Hanford reports were reviewed to document, understand, and (where possible) evaluate limitations on fluoride salt equilibria and dissolution kinetics, including both mass transport and surface reaction rate. Scoping estimates of dissolution time were made for mass-transfer-controlled dissolution of spherical particles of fluoride salts suspended in liquid. This is not the only potential governing mechanism; dissolution could be substantially slower if the surface reaction rate (the rate of release of ions from the surface) is the controlling mechanism. When the minimum amount of water for complete dissolution is used and the slip velocity between the liquid and suspended particles is less than or equal to the terminal settling velocity, the estimated mass-transfer rates allow 0.1 mm particles of fluoride salt to dissolve in minutes at 25 °C in water containing no other dissolved salts. Much larger solids, such as the 6-mm chunks that have been seen in heels, could take a few hours to more than a week to dissolve. The actual dissolution times will depend strongly on the actual slip velocity, the extent of particle suspension, constraint by surface reaction rates, the ratio of solvent to solid, and the presence of common ions that shift the solubility equilibria to restrict dissolution of fluoride salts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗