The Scorpius Accelerator and the NNSS [Slides]

Scorpius is an electron accelerator designed to take x-ray images of weapon components (Flash Radiography). The final design was completed in January 2022. The accelerator start-up will begin in 2025. The Weapons Labs and NNSS are building the Scorpius Accelerator. The NNSS will commission, operate, maintain and upgrade Scorpius.

43 PARTICLE ACCELERATORS↗

Spot Size Optimization of the Scorpius Accelerator

The Scorpius Linear Induction Accelerator (LIA) is being developed by the Advanced Sources and Diagnostics (ASD) Project and will complement other U1a capabilities by providing a multi-pulse, DARHT-class, flash-radiography capability. Commissioning activities are expected to end in Spring of 2026. All of the diagnostics discussed in this chapter are relevant to LIAs that generate high-current relativistic electron beams, and some diagnostics will also be relevant to other accelerators. The Scorpius Accelerator will be the world’s most advance LIA. Although significant technological advancements have been incorporated throughout the machine, many performance aspects of Scorpius will be similar to those of FXR and DARHT Axis-I and -II. These LIAs offer the same challenges, whether it is suppressing beam instabilities, improving diagnostic accuracy, validating computer simulations and beam tunes, or reducing beam-target interaction effects. However, the ultimate figure of merit is consistent between these LIAs, which is spot size and dose.

43 PARTICLE ACCELERATORS↗

Particle-In-Cell Computer Simulations of Beam Spill in the Scorpius Injector

Computer simulations of beam transport in the Scorpius injector were performed using the particle-in-cell computer code LSP. The simulations were used to predict spot size growth due to electron stimulated emission of ions from beam spill on the anode stalk and the entrance transport region.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Brief Overview of the ASD Integrated Test Stand, Activities and Hazards

The ITS venue provides the first opportunity to fully assemble and test the performance of the injector; integrate, assemble and test four modules; measure the severity of the Beam Break-Up instability and perform the first set of beam measurements. Figure 1 shows a high level configuration of the ITS without the system of overhead cable management trays. The final configuration will integrate the injector, 4 modules (12 accelerator cells), 264 SSPP Line Replaceable Units (LRUs), global controls, data acquisition, and a subset of the downstream transport, Table 1. This was chosen because it provides the minimum accelerator cells required to measure the Beam Break-Up (BBU) instability and perform measurements required to validate the ASD beam transport computer models, which are priority measurements for commissioning.

43 PARTICLE ACCELERATORS↗

The ASD Scorpius Accelerator at the NNSS. Recruitment Slides for the University of Nevada, Reno [Slides]

The Scorpius Accelerator: Supports the maintenance of the US nuclear stockpile, helps the US not return to nuclear testing, is one of four diagnostics being installed 963 feet below ground, probes subcritical implosions of nuclear material, and supports the validation of LANL and LLNL computer codes. We are searching engineers and scientists with experienced in: Mechanical Engineering, Electrical Engineering, Pulsed Power, Plasma Physics, Controls, Diagnostics, and Fluids and pressure systems.

42 ENGINEERING↗

Summary of Results for Idaho Accelerator Center (IAC) Experiments with Compact Electron Permanent Magnet Spectrometer (CEPMS)

The Compact Electron Permanent Magnet Spectrometer (CEPMS) shown in Figure 2 consists of collimation at the electron beam entrance, a vacuum chamber for beam transport and a removable 60 degree sector magnet constructed by SABR Enterprises (Ref 2) that is used to momentum analyze the incoming electron beam. There are electron detection planes located perpendicular to straight through and the 60 degree trajectory ports. The planes are designed to accept phosphor screens for time integrated measurements. The screens can be replaced by scintillator for time resolved measurements using gated or streak cameras. The length of the spectrometer along the beamline without the collimator is about 400mm (14”). The spectrometer requires no power supply with controls for cycling or cooling for the magnet. The entire assembly, with magnet installed, weighs about 35kg (75lbs) Figure 3 depicts central and extreme trajectories through the spectrometer for various electron energies. The chamber accommodates a +/-50mm wide detection field relative to the center trajectory. Trajectories with larger momentum (energy) are bent the least. Since the permanent magnet slides off and on with reference to the upstream edge of the vacuum chamber, it can be adjusted to various positions to slightly increase or decrease the central energy thereby changing the range of available energies. Figure 4 shows the effect of changing the location of the permanent magnet on the electron trajectory. A small inward change in r produces a longer trajectory in the magnet therefore, the same energy trajectory is bent more.

43 PARTICLE ACCELERATORS↗

Scorpius and The Integrated Test Stand [Slides]

Scorpius will provide (DARHT scale) flash-radiography of dynamic nuclear material. DARHT radiographs non-nuclear (surrogate) materials at a cadence of 8 to 10 hydrodynamic shots per year. Scorpius will radiograph nuclear material at an initial cadence of about 2 to 3 subcritical shots per year in a more challenging environment. Both machines are Linear Induction Accelerators (LIAs) and generate X-rays with high-current, relativistic electron beams. Their use is termed Flash-Radiography.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗