Search NASA⌕ Search

Engineering topics

Butler, Evelyn

Publications and source records attributed to Butler, Evelyn.

Defining Safe and Efficient Interconnection Policies for Energy Storage and Solar + Storage to Improve Integration and Reduce Costs

Energy storage has a unique and pivotal role to play in the transition to a low-carbon economy because it can help the electric grid accommodate more renewable energy. However, a number of barriers currently impede the process of connecting energy storage systems to the distribution grid. The Toolkit and Guidance for the Interconnection of Energy Storage and Solar-Plus-Storage (the “BATRIES Toolkit”), which is the publication subject to this Final Technical / Scientific Report, provides vetted solutions to eight regulatory and technical barriers to the interconnection of standalone storage and solar-plus-storage systems (referred to as “energy storage”) to the distribution grid. These recommendations are based on over a year of research and analysis by utility and industry experts. The BATRIES Toolkit also includes model language that utilities and utility regulators can use to update state interconnection rules to reduce the costs and time to safely interconnect energy storage and solar-plus-storage systems. The solutions are nationally applicable and can be applied in diverse states and markets across the U.S.

14 SOLAR ENERGY↗

Solar Automated Permit Processing Software for Distributed PV (Cooperative Research and Development Final Report, CRADA Number CRD-19-00825)

NREL and its project partners built and commercialized the novel Solar Automated Permitting Processing Plus (SolarAPP+) software platform that delivers instant residential rooftop solar permits. The tool provides installers with a standard portal for entering permit information for residential solar systems across all Authorities Having Jurisdiction (AHJs) using SolarAPP+, thereby providing a streamlined plan review form, transparency into permitting timelines, and required specifications. The project has proven to reduce permitting timelines from as many as 20 business days to zero, delivering solar projects faster in the four participating AHJs using the platform. Streamlining permitting timelines, all else equal, results in consumers installing their systems and reducing their electricity bills faster. The continued expansion of SolarAPP+ features and adoption nationwide will expand the benefits of the SolarAPP+ beyond the current user base.

14 SOLAR ENERGY↗