Pitka's Point/St. Mary's Wind Energy Construction Project. Final report
This is the final report for the St. Mary’s/Pitka’s Point Wind Construction Project. Under the project Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Pitka’s Point about 4 miles from the diesel-fired prime power plant in St. Mary’s. The main objective of this project is to generate electric power from a renewable resource in an effort to reduce the local dependency on fuel oil as the sole source of electric power generation. The wind generator’s output augments the prime source generation provided by the diesel-powered generators.