Search NASA⌕ Search

Engineering topics

CW, CONNELL

Publications and source records attributed to CW, CONNELL.

AUTOMATING GROUNDWATER SAMPLING AT HANFORD THE NEXT STEP

Historically, the groundwater monitoring activities at the Department of Energy's Hanford Site in southeastern Washington State have been very "people intensive." Approximately 1500 wells are sampled each year by field personnel or "samplers." These individuals have been issued pre-printed forms showing information about the well(s) for a particular sampling evolution. This information is taken from 2 official electronic databases: the Hanford Well information System (HWIS) and the Hanford Environmental Information System (HEIS). The samplers used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and other personnel posted the collected information onto a spreadsheet that was then printed and included in a log book. The log book was then used to make manual entries of the new information into the software application(s) for the HEIS and HWIS databases. A pilot project for automating this extremely tedious process was lauched in 2008. Initially, the automation was focused on water-level measurements. Now, the effort is being extended to automate the meta-data associated with collecting groundwater samples. The project allowed electronic forms produced in the field by samplers to be used in a work flow process where the data is transferred to the database and electronic form is filed in managed records - thus eliminating manually completed forms. Elimating the manual forms and streamlining the data entry not only improved the accuracy of the information recorded, but also enhanced the efficiency and sampling capacity of field office personnel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AUTOMATING GROUNDWATER SAMPLING AT HANFORD

Until this past October, Fluor Hanford managed Hanford's integrated groundwater program for the U.S. Department of Energy (DOE). With the new contract awards at the Site, however, the CH2M HILL Plateau Remediation Company (CHPRC) has assumed responsibility for the groundwater-monitoring programs at the 586-square-mile reservation in southeastern Washington State. These programs are regulated by the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. More than 1,200 wells are sampled each year. Historically, field personnel or 'samplers' have been issued pre-printed forms that have information about the well(s) for a particular sampling evolution. This information is taken from the Hanford Well Information System (HWIS) and the Hanford Environmental Information System (HEIS)--official electronic databases. The samplers used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and the collected information was posted onto a spreadsheet that was then printed and included in a log book. The log book was then used to make manual entries of the new information into the software application(s) for the HEIS and HWIS databases. This is a pilot project for automating this tedious process by providing an electronic tool for automating water-level measurements and groundwater field-sampling activities. The automation will eliminate the manual forms and associated data entry, improve the accuracy of the information recorded, and enhance the efficiency and sampling capacity of field personnel. The goal of the effort is to eliminate 100 percent of the manual input to the database(s) and replace the management of paperwork by the field and clerical personnel with an almost entirely electronic process. These activities will include the following: scheduling the activities of the field teams, electronically recording water-level measurements, electronically logging and filing Groundwater Sampling Reports (GSR), and transferring field forms into the site-wide Integrated Document Management System (IDMS).

54 ENVIRONMENTAL SCIENCES↗

ENVIRONMENTAL SAMPLING AND ANALYSIS - GETTING IT RIGHT

The Department of Energy's Hanford Site in southeastern Washington State was established in the 1940s as part of the Manhattan Project. Hanford's role was to produce weapons-grade nuclear material for defense, and by 1989, when the Site's mission changed from operations to cleanup, Hanford had produced more than 60 percent of the nation's plutonium. The legacy of Hanford's production years is enormous in terms of nuclear and hazardous waste, especially the 270 billion gallons of contaminated groundwater and the 5 million cubic yards of contaminated soil. Managing the contaminated soil and groundwater are particularly important because the Columbia River, the lifeblood of the northwest and the nation's eighth largest river, bounds the Site. Fluor Hanford's Soil & Groundwater Remediation Project (S&GRP) integrates all of the activities that deal with remediating and monitoring the groundwater across the Site. The S&GRP uses a detailed series of steps to record, track, and verify information. The Sample and Data Management (SDM) Process consists of 10 integrated steps that start with the data quality objectives process that establishes the mechanism for collecting the right information with the right people. The process ends with data quality assessment, which is used to ensure that all quantitative data (e.g., field screening, fixed laboratory) are the right type, and of adequate quality to support the decision-making process. Steps 3 through 10 of the process are production steps and are integrated electronically. The detailed plans, procedures, and systems used day-to-day by the SDM process require a high degree of accuracy and reliability. Tools must be incorporated into the processes that minimize errors. This paper discusses all of the elements of the SDM process in detail.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗