Search NASA⌕ Search

Engineering topics

Cabra, Ivonne Pena

Publications and source records attributed to Cabra, Ivonne Pena.

Energy Assets Transformation Web Mapping Application

This submission contains the link and geospatial materials used in the Energy Assets Transformation Web Mapping Application. The zip file contains 19 geospatial layers in a file geodatabase called EAT.gdb to be grouped in the following categories. 1. Industrial Assets: Coal Generation Units Retirements 2012-2040 (EIA); Examples of Repurposing Projects (32 projects in total); Abandoned Coal Mines (CORD, SkyTruth); Abandoned or Orphaned Wells (for ten states only). 2. Energy Transition Communities: 48C (e) Tax Credits - Designated Energy Communities (IRA); Index of Deep Disadvantage; Local Energy Action Program (LEAP); EJ Index for Proximity to Hazardous Waste (EPA). 3. Regional Landscape: State-Level Funding Programs (relevant to repurposing projects, for 2022 and 2023 only); Coal Flows from Mine to Plant 2021 (EIA), Variable Renewable Energy Shares (Wind and Solar, 2021, EIA). 4. Supporting Infrastructure: Railroads (HIFLD), Electric Power Transmission Lines (HIFLD), Major Highways (NHPN, DOT), Major Ports (National Atlas of the U.S.); Independent System Operators (HIFLD), NERC Regions and Subregions (HIFLD).

abandoned coal mines↗

Market analysis for the integration of new power technologies: A case study of the deployment of hybrid fossil-based generator plus energy storage (ES-FE)

This study examines the national landscape of hybridized fossil energy (FE) power plants with energy storage (ES) technologies (“ES-FE”) and presents the compilation of an ES-FE dataset, which includes over 65 ES-FE projects and concepts in the United States, comprising approximately 500 MWh of co-located ES capacity with FE power plants. This study also estimates the economic feasibility of adding ES to existing FE power plants by characterizing the potential revenues that can be generated by the ES component through flexibility and capacity value. The analysis focuses on ES technologies with 2- to 10-h. durations located in four U.S. independent system operators (ISOs): Midcontinent ISO (MISO), Electric Reliability Council of Texas (ERCOT), PJM Interconnection (PJM), and California ISO (CAISO), which have +70,000 MW of combined FE power capacity that could add ES. Annual revenues are estimated for the ES component using a what-if-analysis approach, for capacity value, price arbitrage, or ancillary services provision. The results show that annual revenues depend on the end-use storage service, wholesale electricity and capacity market prices, and ES technology operation parameters such as discharging duration and cycling frequency. When performing a sensitivity analysis, ES accrues $7–178/kW-yr. via price arbitrage and ancillary services provision in the four ISOs, and $13–92/kW-yr. when providing capacity value only in MISO and PJM. A cash flow analysis is performed to estimate the net present value (NPV) of the ES addition using a range of ES costs. The study finds that for most ES technologies considered, these revenues alone are insufficient to achieve economic feasibility. In conclusion, of the 1645 total runs analyzed, 115 had positive NPVs (7%). Therefore, other revenue streams or monetizable benefits are necessary to achieve the break-even point.

20 FOSSIL-FUELED POWER PLANTS↗