Search NASASearch

Engineering topics

Calvert, Derek

Publications and source records attributed to Calvert, Derek.

Systems Engineering Lessons Learned for Class D Missions

One of NASA's goals within human exploration is to determine how to get humans to Mars safely and to live and work on the Martian surface. To accomplish this goal, several smaller missions act as stepping-stones to the larger end goal. NASA uses these smaller missions to develop new technologies and learn about how to survive outside of Low Earth Orbit for long periods. Additionally, keeping a cadence of these missions allows the team to maintain proficiency in the complex art of bringing spacecraft to fruition. Many of these smaller missions are robotic in nature and have smaller timescales, whereas there are others that involve crew and have longer mission timelines. Given the timelines associated with these various missions, different levels of risk and rigor need to be implemented to be more in line with what is appropriate for the mission. Thus, NASA has four different classifications that range from Class A to Class D based on the mission details. One of these projects is the Resource Prospector (RP) Mission, which is a multi-center and multi-institution collaborative project to search for volatiles in the polar regions of the Moon. The RP mission is classified as a Class D mission and as such, has the opportunity to more tightly manage, and therefore accept, greater levels of risk. The requirements for Class D missions were at the forefront of the design and thus presented unique challenges in vehicle development and systems engineering processes. This paper will discuss the systems engineering process at NASA and how that process is tailored for Class D missions, specifically the RP mission.

Rojdev, Kristina

The Iodine Satellite (iSat) Project Development Towards Critical Design Review

Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

Dankanich, John W.

The Iodine Satellite (iSAT) Hall Thruster Demonstration Mission Concept and Development

The use of iodine propellant for Hall thrusters has been studied and proposed by multiple organizations due to the potential mission benefits over xenon. In 2013, NASA Marshall Space Flight Center competitively selected a project for the maturation of an iodine flight operational feed system through the Technology Investment Program. Multiple partnerships and collaborations have allowed the team to expand the scope to include additional mission concept development and risk reduction to support a flight system demonstration, the iodine Satellite (iSAT). The iSAT project was initiated and is progressing towards a technology demonstration mission preliminary design review. The current status of the mission concept development and risk reduction efforts in support of this project is presented.

Dankanich, John W.

Resource Prospector Lander: Architecture and Trade Studies

NASA's Resource Prospector (RP) is a multi-center and multi-institution collaborative project to investigate the polar regions of the Moon in search of volatiles. The mission is rated Class D and is approximately 10 days. The RP vehicle comprises three elements: the Lander, the Rover, and the Payload. The Payload is housed on the Rover and the Rover is on top of the Lander. The focus of this paper is on the Lander element for the RP vehicle. The design of the Lander was requirements driven and focused on a low-cost approach. To arrive at the final configuration, several trade studies were conducted. Of those trade studies, there were six primary trade studies that were instrumental in determining the final design. This paper will discuss each of these trades in further detail and show how these trades led to the final architecture of the RP Lander.

Moore, Josh