Search NASA⌕ Search

Engineering topics

Cantonwine, P.

Publications and source records attributed to Cantonwine, P..

GNF fuel technology update

In 2015, Global Nuclear Fuel (GNF) launched the GNF3 fuel design by inserting lead-use assemblies into two boiling water reactors (BWRs) in the U.S. A lead use assembly is a nuclear fuel assembly which is inserted in a reactor core to confirm its performance. A third set of GNF3 lead-use assemblies are scheduled to be inserted into another reactor in the spring of 2017. GNF3 is a robust next-generation 10*10 fuel design that will improve both fuel cycle and fuel reliability. In addition, GNF3 will be delivered in a fully assembled condition - forgoing the need to insert fuel channels over the bundles at the site. The process of shipping BWR fuel in a channeled configuration is complex and requires an understanding of the potential high-cycle and low-cycle fatigue conditions that can occur during shipping, as characterized by accelerometer data from ship tests. The key component in evaluating channeled fuel shipping is the spacer, and the GNF3 spacer fatigue performance was found to be approximately twice that of GNF2. While fuel reliability has traditionally been related to the avoidance of fuel leakers, for the past 15 years channel - control blade interference has been a close second for concern. To eliminate this problem, GNF3 will come standard with NSF (a zirconium alloy) channels that are effectively resistant to fluence gradient-induced bow and shadow corrosion-induced bow. In addition to the development of GNF3, GNF is evaluating the use of advancing 3D metal printing or additive manufacturing for manufacturing fuel bundle components. Additive manufacture offers the hope of more flexibility in design and shorter manufacturing development cycles. However, since there is little experience with this technology in the nuclear industry, GNF has been evaluating the use of additive manufacture to fabricate small scale components that are easily retrieved from the reactor for testing. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

GNF fuel and channel performance: 2016 update

GNF2 is an advanced 10*10 BWR fuel design that was initially introduced in reload quantities in 2008. It has now replaced GE14 as the fuel design with the largest number of bundles in the operating fleet. Utilities are reaping the benefits of improved nuclear and thermal performance as well as high reliability. Transition to GNF2 fuel in the fleet is nearly complete with only three plants continuing to receive GE14 fuel in 2016. GNF2 reload bundles are now being discharged, and inspections have been completed on GNF2 bundles operated to over 61 GWd/MT and over 7.5 years. For both GE14 and GNF2, 2015 was a challenging year in terms of fuel reliability, with an increase in debris-related failures. The failures are concentrated in pumped-forward drain plants (that have long showed increased susceptibility to debris issues), plants with histories of recurrent debris failures, and in some cases in plants that had component failures or unusual or extensive maintenance or modifications. There have been no failures from causes other than debris. In GNF2, there are no failures due to manufacturing, PCI-type, dryout, or any form related to crud or corrosion. Operating experience in 2015 (and over the past decade) is discussed in terms of Failed Fuel Management, or operation with fuel failures in the core, and channel - control blade interference. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗