Search NASA⌕ Search

Engineering topics

Carlsten, Bruce

Publications and source records attributed to Carlsten, Bruce.

International Workshop on Next Generation Gamma-Ray Source

A workshop on The Next Generation Gamma-Ray Sources , sponsored by the Office of Nuclear Physics at the Department of Energy, was held November 17--19, 2016 in Bethesda, Maryland. The goals of the workshop were to identify basic and applied research opportunities at the frontiers of nuclear physics that would be made possible by the beam capabilities of an advanced laser Compton beam facility. To anchor the scientific vision to realistically achievable beam specifications using proven technologies, the workshop brought together experts in the fields of electron accelerators, lasers, and optics to examine the technical options for achieving the beam specifications required by the most compelling parts of the proposed research programs. An international assembly of participants included current and prospective $\gamma$-ray beam users, accelerator and light-source physicists, and federal agency program managers. Sessions were organized to foster interactions between the beam users and facility developers, allowing for information sharing and mutual feedback between the two groups. The workshop findings and recommendations are summarized in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Higher-Order-Mode Effects in Tesla-Type Superconducting RF Cavities on Electron Beam Quality

We report the direct observations of the correlation of higher order modes (HOMs) generated by off-axis electron beam steering in TESLA-type SCRF cavities and sub-macropulse beam centroid shifts (with the concomitant effect on averaged beam size and emittance). The experiments were performed at the Fermilab Accelerator Science and Technology (FAST) facility using its unique configuration of a PC rf gun injecting beam into two separated 9-cell cavities in series with corrector magnets and beam position monitors (BPMs) located before, between, and after them. The ~100-kHz oscillations with up to 300-μm amplitudes at downstream locations were observed in a 3-MHz micropulse repetition rate beam with charges of 500 and 1000 pC/b, although the effects were much reduced at 100 pC/b. The studies were based on HOM detector circuitry targeting the first and second dipole passbands, rf BPM bunch-by-bunch data, and imaging cameras viewing multi-slit images for emittance assessments at 33 MeV. Initial calculations reproduced a key feature of the phenomena. In principle, these results may be scaled to cryomodule configurations of major accelerator facilities.

43 PARTICLE ACCELERATORS↗

Beam-Dynamics Analysis of Long-Range Wakefield Effects on the SCRF Cavities at the Fast Facility

Long-range wakefields in superconducting RF (SCRF) cavities create complicated effects on beam dynamics in SCRF-based FEL beamlines. The driving bunch excites effectively an infinite number of structure modes (including HOMs) which oscillate within the SCRF cavity. Couplers with loads are used to damp the HOMs. However, these HOMs can persist for long periods of time in superconducting structures, which leads to long-range wakefields. Clear understanding of the long-range wakefield effects is a critical element for risk mitigation of future SCRF accelerators such as XFEL at DESY, LCLS-II XFEL, and MaRIE XFEL. We are currently developing numerical tools for simulating long-range wakefields in SCRF accelerators and plan to experimentally verify the tools by measuring these wakefields at the Fermilab Accelerator Science and Technology (FAST) facility. This paper previews the experimental conditions at the FAST 50 MeV beamline based on the simulation results.

43 PARTICLE ACCELERATORS↗

Final Report 200 MW L-Band Annular Beam Klystron for Accelerators

This program developed a 200 MW, 1.3 GHz, Annular Beam Klystron (ABK) for accelerator systems. An ABK provides lower impedance than a conventional klystron, making it possible to produce higher RF powers with lower voltages. With a higher power per unit, fewer klystrons would be required for a large accelerator. Lower voltage also simplifies and reduces the cost of the power supply system. Both features will significantly lower the cost of an RF system. This device operates at 475 kV. The klystron uses a magnetron injection gun producing 1100 A in one microsecond pulses. Power is extracted into fundamental rectangular waveguide through two output windows. The predicted gain is approximately 45 dB with estimated efficiency of 45%. The klystron was assembled, but no facility was available for testing. Consequently, no high power performance measurements are available. Because the assembled klystron is approximately 15 feet long, it was disassembled for storage. It can be reassembled should a use materialize.

43 PARTICLE ACCELERATORS↗