The importance of capturing power system operational details in resource adequacy assessments

Traditional methods for assessing the resource adequacy (RA) of a power system are becoming obsolete due to emerging trends such as the increasing deployment of variable renewable energy and storage. Consequently, analysts are recommending that RA be assessed using a Monte Carlo simulation approach that models chronological power system operations over many instances of possible operating conditions. However, this approach is necessarily more complex and computationally demanding, which is an obstacle to real-world implementation. Here, in this study, we investigate which operational details of power systems are important to capture in order to accurately evaluate a system's RA, versus details that add complexity but do not meaningfully affect RA results. To do so, we develop a probabilistic RA assessment framework by adapting an existing production cost model and apply it to a case study based on the IEEE Reliability Test System. Our results indicate that multi-year data, storage dispatch, and transmission limits are key details to incorporate. Accurate RA results can be obtained using non-economic dispatch strategies as long as they are coordinated with detailed operational strategies. We also demonstrate how popular expectation-based RA metrics can mask important differences in the characteristics of loss of load events.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implications of a regional resource adequacy program on utility integrated resource planning: Study for the Western United States

LBNL collaborated with the Western Interstate Energy Board and the University of Texas, Austin to investigate the implications of a regional resource adequacy (RA) program on utility integrated resource planning. This report is focused on an active policy discussion to develop a novel voluntary program to share capacity resource and improve RA in the Western Interconnection. This report identifies two RA components of IRP that will be highly impacted by a regional RA program: resource capacity accreditation and RA targets. There are at least four resources that will require specific attention for their capacity credit calculation: (1) variable renewable resources, (2) demand-side resources, (3) hydropower, and (4) contracts. It will then be necessary to decide on a RA target reliability metric (e.g., a planning reserve margin) that is at least the minimum requirement in IRPs to ensure consistency in RA requirement calculations. The report finds that load forecasting and transmission expansion analyses will be moderately impacted, but that most of IRP components will not be significantly impacted. The report includes (i) a review of traditional resource adequacy practices in IRP; (ii) a case study of an existing regional RA program that interacts with IRP (Southwest Power Pool) and (iii) an overview of the NWPP regional resource adequacy proposal that is the object of this work. This paper does not (1) advocate for or against a regional RA program for the NWPP, (2) make detailed design recommendations for this program, or (3) assess its benefits and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Event/Time/Availability/Reliability-Analysis Program

ETARA is interactive, menu-driven program that performs simulations for analysis of reliability, availability, and maintainability. Written to evaluate performance of electrical power system of Space Station Freedom, but methodology and software applied to any system represented by block diagram. Program written in IBM APL.

Viterna, L. A.↗