Search NASA⌕ Search

Engineering topics

Carter, Donald Layne

Publications and source records attributed to Carter, Donald Layne.

Challenges with Operating a Water Recovery System (WRS) in the Microgravity Environment of the International Space Station (ISS)

The ISS WRS produces potable water from crew urine, crew latent, and Sabatier product water. This system has been operational on ISS since November 2008, producing over 30,000 L of water during that time. The WRS includes a Urine Processor Assembly (UPA) to produce a distillate from the crew urine. This distillate is combined with the crew latent and Sabatier product water and further processed by the Water Processor Assembly (WPA) to the potable water. The UPA and WPA use technologies commonly used on ISS for water purification, including filtration, distillation, adsorption, ion exchange, and catalytic oxidation. The primary challenge with the design and operation of the WRS has been with implementing these technologies in microgravity. The absence of gravity has created unique issues that impact the constituency of the waste streams, alter two-phase fluid dynamics, and increases the impact of particulates on system performance. NASA personnel continue to pursue upgrades to the existing design to improve reliability while also addressing their viability for missions beyond ISS.

Carter, Donald Layne↗

Impact of Biofilms on the Design and Operation of ISS Life Support Systems

Biofilm growth has been an ongoing issue for US and Russian water systems on the International Space Station, and is a critical issue for exploration missions in which water systems must be designed to accommodate dormant periods of up to one year. On ISS, Russian condensate plumbing has previously clogged with biomass, requiring condensate plumbing to now be regularly replaced. In the US Segment, the release of biofilm from the Water Processor waste tank has clogged a solenoid valve downstream of the tank, resulting in the costly replacement of the inlet separator and process pump. Subsequent management of the biofilm in the waste tank involves restrictions on tank cycles to limit the release of biomass and an additional filter to protect downstream components. Engineering personnel are now evaluating concepts to better manage the biomass, including the use of microbial inhibitors and UV LEDs. Though current ISS operations could likely be sustained for the duration of ISS, a more effective method must be developed for managing the growth and release of biomass in future exploration vehicles. Biofilm management for future missions is complicated by the requirement to accommodate extended periods of dormancy during which time the water system will be stagnant. The current approach under consideration is to flush the waste water with product water to reduce the organic content followed by use of microbial inhibitors or UV. However, other concepts may also be developed based on ongoing research.

Carter, Donald Layne↗

Status of the Regenerative ECLS Water Recovery System

The regenerative Water Recovery System (WRS) has completed its first full year of operation on the International Space Station (ISS). The major assemblies included in this system are the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2010, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Donald Layne↗

Development of an Advanced Recycle Filter Tank Assembly for the ISS Urine Processor Assembly

Recovering water from urine is a process that is critical to supporting larger crews for extended missions aboard the International Space Station. Urine is collected, preserved, and stored for processing into water and a concentrated brine solution that is highly toxic and must be contained to avoid exposure to the crew. The brine solution is collected in an accumulator tank, called a Recycle Filter Tank Assembly (RFTA) that must be replaced monthly and disposed in order to continue urine processing operations. In order to reduce resupply requirements, a new accumulator tank is being developed that can be emptied on orbit into existing ISS waste tanks. The new tank, called the Advanced Recycle Filter Tank Assembly (ARFTA) is a metal bellows tank that is designed to collect concentrated brine solution and empty by applying pressure to the bellows. This paper discusses the requirements and design of the ARFTA as well as integration into the urine processor assembly.

Link, Dwight E., Jr.↗

Status of the Regenerative ECLSS Water Recovery System

NASA has completed the delivery of the regenerative Water Recovery System (WRS) for the International Space Station (ISS). The major assemblies included in this system are the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the final effort to deliver the hardware to the Kennedy Space Center for launch on STS-126, the on-orbit status as of April 2009, and describes some of the technical challenges encountered and lessons learned over the past year.

Carter, Donald Layne↗

Periodically Discharging, Gas-Coalescing Filter

A proposed device would remove bubbles of gas from a stream of liquid (typically water), accumulate the gas, and periodically release the gas, in bulk, back into the stream. The device is intended for use in a flow system (1) in which there is a requirement to supply bubble-free water to a downstream subsystem and (2) that includes a sensor and valves, just upstream of the subsystem, for sensing bubbles and diverting the flow from the subsystem until the water stream is again free of bubbles. By coalescing the gas bubbles and then periodically releasing the accumulated gas, the proposed device would not contribute to net removal of gas from the liquid stream; nevertheless, it would afford an advantage by reducing the frequency with which the diverter valves would have to be activated. The device (see figure) would include an upper and a lower porous membrane made of a hydrophilic material. Both membranes would cover openings in a tube leading to an outlet. These membranes would allow water, but not gas bubbles, to pass through to the interior of the tube. Inside the tube, between the two membranes, there would be a flow restrictor that would play a role described below. Below both membranes there would be a relief valve. Water, possibly containing bubbles, would enter from the top and would pass through either the lower membrane or both membranes, depending how much gas had been accumulated thus far. When the volume of accumulated gas was sufficient to push the top surface of the liquid below the lower porous membrane, water could no longer flow through either membrane toward the outlet. This blockage would cause an increase in back pressure that would cause the relief valve to open. The opening of the relief valve would allow both the water and the bulk-accumulated gas to pass through to the outlet. Once the gas had been pushed out, water would once again flow through both membranes at a much lower pressure drop. The flow restrictor would maintain enough pressure drop to keep the relief valve open until gas had been cleared from both hydrophilic membranes.

Carter, Donald Layne↗

Phase 3 integrated water recovery testing at MSFC: Single loop test results and lessons learned

A series of tests has been conducted at the NASA Marshall Space Flight Center (MSFC) to evaluate the performance of the Space Station Freedom (SSF) water recovery system. Potable and urine reclamation processors were integrated with waste water generation equipment and sucessfully operated for a total of 144 days. This testing marked the first occasion in which the waste feed sources for the previous potable and hygiene loops were combined into a single loop and processed to potable water quality. Reclaimed potable water from the combined waste waters routinely met the SSF water quality specifications.In the last stage of testing, data was obtained that indicated that the water processor (WP) presterilizer may not be required to meet the potable water quality specification. The removal of the presterilizer from the Water Processor design would provide a significant power savings, though an increase in the residence time of the catalytic oxidation reactor may be required to meet the potable microbial and total Organic Carbon specifications. This paper summarizes the test objectives, system design, test activities/protocols, significant results/anomalies and major lessons learned.

Carter, Donald Layne↗