Search NASA⌕ Search

Engineering topics

Carter, Jane

Publications and source records attributed to Carter, Jane.

Evaluation of H-Canyon Ventilation Exhaust Tunnel Inspection at the Savannah River Site - 20052

The Department of Energy (DOE) H-Canyon Facility at the Savannah River Site (SRS) is operated by Savannah River Nuclear Solutions (SRNS). The Facility Structural Integrity Program [1] provides a process to inspect, evaluate, and document the conditions of passive safety related structural systems and components, their degradation mechanisms and their impact on the safety envelope. The Structural Integrity Program performs periodic visual inspections to confirm the systems and components can perform their safety function and recommend corrective actions before the function is compromised. The H-Canyon Exhaust Tunnel is part of the H-Canyon Ventilation System and is periodically inspected under the Structural Integrity Program. The Tunnel performs a Safety Class passive design feature function that is available 100% of the time. The underground reinforced concrete Tunnel directs Canyon process air from the Canyon to the Sand Filter System. The radiological and chemical airborne activity coupled with the physical configuration of the tunnel precludes a manned entry into the tunnel to perform the inspection. Unlike active systems that can be subjected to physical testing to confirm capability, qualification calculations, including modeling, is performed to assess passive design feature capabilities relative to operational, accident and natural phenomena hazards events. Input for these calculations come from knowledge of field conditions, design drawings and conservative assumptions. The knowledge of field conditions comes from concrete and soil testing activities as well as inspection data. The use of cameras on crawlers to obtain inspection data and how that data is used in qualification calculations is the focus of this discussion. Remote Tunnel inspections have been performed using cameras on a stick, referred to as pole cameras, prior to Calendar Year 2003 (CY2003). Since CY2003, six camera equipped crawlers have been used. Crawlers have evolved and improved by incorporating lessons learned from the previous inspections. The latest 2019 crawler successfully traveled the entire length of the tunnel between the Canyon and Sand Filter System and captured images that were previously unseen, thus providing key visual data for the Structural Integrity Program report [2]. The inspection data serves as 1) input to qualification calculations, 2) validates current conditions remain bounded by qualification calculations, and 3) documents a record of change over time. This data is vital for the effective evaluation of the tunnel structure and aids with predicting the life cycle service life safety envelope to protect the public, environment, and facility worker. The goal of the 2019 deployment was to use a more robust vehicle to ensure travel over obstacles, perform the inspection with higher resolution cameras, and have the ability to elevate the cameras to view surfaces previously obscured by abandon-in-place ducts in the tunnel. The inspection information will serve to strengthen the input basis for qualification calculations, versus using excessive conservative calculation assumptions. This 2019 inspection was compared with previous crawler visual evidence to identify change over time to project remaining service life and confirm field conditions remain bounded by qualification calculations. The results of the 2019 Exhaust Tunnel inspection continue to improve and provide a firm basis to make sound engineering judgements regarding tunnel capability and approaches in projecting remaining service life with an aging system and component. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Advancing Technologies for Remote Inspections - 20345

In 2017, the DOE Environmental Management Office of Technology Development (DOE-EM TD) sponsored the H-Canyon Advanced Technology Demonstration (ATD) to demonstrate to DOE facilities the value of using new commercial-off-the-shelf (COTS) and near-ready technologies to solve difficult problems and enhance worker safety. The DOE Savannah River Site (SRS) H-Canyon Air Exhaust Tunnel (HCAEX) inspection task was identified as representative of the hazardous, human denied environments which could benefit from advanced technologies. The HCAEX underground concrete tunnel is visually inspected biannually using a camera mounted on a remotely operated vehicle (ROV) designed and built by SRNL. While tunnel images have provided valuable visual information, it is desirable to have a higher order of understanding of the environment to support a more thorough structural integrity (SI) analysis and for long term planning purposes. As part of the ATD, the Concrete Integrated Product Team (CIPT) was formed to identify and evaluate available sensors and methods mature enough to remotely obtain tunnel concrete characterization data of high value and with a high probability of success. The team included SMEs and H-Canyon stakeholders in the field of concrete, nondestructive examination (NDE), structural integrity, sensors and remote systems from SRNL, SRNS, LANL, DOE-SR and the Army Corps of Engineering. The CIPT completed an in-depth identification of customer concrete inspection needs and potential technology solutions. Sensors and methods were evaluated on performance, data usefulness, cost and the feasibility of a successful deployment given the unique tunnel access challenges and environment. Two technologies were identified as promising by the CIPT for near term demonstration and evaluation: Lidar (Light Detection and Ranging) 3-dimensional (3D) mapping and remote robotic deployment of NDE instrumentation. Laser spectroscopy to characterize tunnel surface chemical changes was also of interest, but presently cost prohibitive. This paper will include a discussion of the two efforts underway to evaluate and implement the CIPT recommendations. First, the status of the November 2019 deployment of Lidar at a single location into the tunnel is presented. This initial deployment provided the team a learning curve and lessons learned on the challenges of tunnel deployment to include remote operation and data collection, stabilization of the sensor in high air flow (∼30 mph), ability to achieve a tolerance accuracy of 0.25-inches, and the probability to identify change in tunnel dimensions over time. Secondly, a discussion on the development of the Robotic Arm Concrete Inspection Test Bed capable of deploying NDE instruments to examine custom concrete forms will be presented. Concrete forms simulating the rough concrete surfaces, strength, composition and potential structural defects that can be found at our DOE EM facilities have been designed and built for the test bed. Two state-of-the art concrete NDE instruments have been identified as having potential to work on rough concrete walls, they are being tested and characterized as to their ability to provide desired structural integrity data to include wall thickness and defect identification on the developed test beams. Lastly, lessons learned, and the path forward will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗