Search NASA⌕ Search

Engineering topics

Cease, H.

Publications and source records attributed to Cease, H..

νSTORM - Neutrinos from STORed Muons: Letter of Intent to the Fermilab Physics Advisory Committee

The idea of using a muon storage ring to produce a high-energy (≃ 50 GeV) neutrino beam for experiments was first discussed by Koshkarev in 1974. A detailed description of a muon storage ring for neutrino oscillation experiments was first produced by Neuffer in 1980. In his paper, Neuffer studied muon decay rings with E μ of 8, 4.5 and 1.5 GeV. With his 4.5 GeV ring design, he achieved a figure of merit of ≃ 6 x 10 9 useful neutrinos per 3 x 10 13 protons on target. The facility we describe here (νSTORM) is essentially the same facility proposed in 1980 and would utilize a 3-4 GeV/c muon storage ring to study eV-scale oscillation physics and, in addition, could add significantly to our understanding of ν e and ν μ cross sections. In particular the facility can: (1) address the large Δm 2 oscillation regime and make a major contribution to the study of sterile neutrinos, (2) make precision ν e and $\bar{ν}$ e cross-section measurements, (3) provide a technology (μ decay ring) test demonstration and μ beam diagnostics test bed, and (4) provide a precisely understood ν beam for detector studies. The facility is the simplest implementation of the Neutrino Factory concept. In our case, 60 GeV/c protons are used to produce pions off a conventional solid target. The pions are collected with a focusing device (horn or lithium lens) and are then transported to, and injected into, a storage ring. The pions that decay in the first straight of the ring can yield a muon that is captured in the ring. The circulating muons then subsequently decay into electrons and neutrinos. We are starting with a storage ring design that is optimized for 3.8 GeV/c muon momentum. This momentum was selected to maximize the physics reach for both oscillation and the cross section physics. See Fig. 1 for a schematic of the facility.

43 PARTICLE ACCELERATORS↗

A concept for canceling the leakage field inside the stored beam chamber of a septum magnet

Here, the Advanced Photon Source is in the process of upgrading its storage ring from a double-bend to a multi-bend lattice as part of the APS Upgrade Project (APS-U). A swap-out injection scheme is planned for the APS-U to keep a constant beam current and to enable a small dynamic aperture. A novel concept that cancels out the effect of leakage field inside the stored beam chamber was introduced in the design of the septum magnet. As a result, the horizontal deflecting angle of the stored beam was reduced to below 1 µrad with a 2 mm septum thickness and 1.06 T normal injection field. The concept helped to minimize the integrated skew quadrupole field and normal sextupole fields inside stored beam chamber as well.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SEPTUM MAGNET DESIGN FOR THE APS-U

The Advanced Photon Source is in the process of upgrading its storage ring from a double-bend to a multi-bend lattice as part of the APS Upgrade Project (APS-U). A swap-out injection scheme is planned for the APS-U to keep a constant beam current and to enable a small dynamic aperture. A septum magnet with a minimum thickness of 2 mm and an injection field of 1.06 T has been designed, delivering the required total deflecting angle is 89 mrad with a ring energy of 6 GeV. The stored beam chamber has an 8 mm x 6 mm super-ellipsoidal aperture. The magnet is straight; however, it is tilted in yaw, roll, and pitch from the stored beam chamber to meet the on axis swap out injection requirements for the APS-U lattice. In order to minimize the leakage field inside the stored beam chamber, four different techniques were utilized in the design. As a result, the horizontal deflecting angle of the stored beam was held to only 5 µrad, and the integrated skew quadrupole inside the stored beam chamber was held to 0.09 T. The detailed techniques that were applied to the design, field multipoles, and resulting trajectories of the injected and stored beams are reported.

Abliz, M.↗

Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project

Extensive prototyping of storage ring magnets is ongoing at the Advanced Photon Source (APS) in support of the APS Multi-Bend Achromat (MBA) upgrade project (APS-U) [1]. As part of the R&D activities four quadrupole magnets with slightly different geometries and pole tip materials, and one sextupole magnet with vanadium permendur (VP) pole tips were designed, built and tested. Magnets were measured individually using a rotating coil and a Hall probe for detailed mapping of the magnetic field. Magnets were then assembled and aligned relative to each other on a steel support plate and concrete plinth using precision machined surfaces to gain experience with the alignment method chosen for the APS-U storage ring magnets. The required alignment of magnets on a common support structure is 30 μm rms. Measurements of magnetic field quality, strength and magnet alignment after subjecting the magnets and assemblies to different tests are presented.

Doose, C.↗

Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities and some of what has been learned to date will be shared.

APS-U, APS UPGRADE PROJECT, STORAGE RING VACUUM SY↗

THE DARK ENERGY CAMERA

The Dark Energy Camera is a new imager with a 2.°2 diameter field of view mounted at the prime focus of the Victor M. Blanco 4 m telescope on Cerro Tololo near La Serena, Chile. The camera was designed and constructed by the Dark Energy Survey Collaboration and meets or exceeds the stringent requirements designed for the wide-field and supernova surveys for which the collaboration uses it. The camera consists of a five-element optical corrector, seven filters, a shutter with a 60 cm aperture, and a charge-coupled device (CCD) focal plane of 250 μm thick fully depleted CCDs cooled inside a vacuum Dewar. The 570 megapixel focal plane comprises 62 2k × 4k CCDs for imaging and 12 2k × 2k CCDs for guiding and focus. The CCDs have 15 μm × 15 μm pixels with a plate scale of 0.″263 pixel{sup −1}. A hexapod system provides state-of-the-art focus and alignment capability. The camera is read out in 20 s with 6–9 electron readout noise. This paper provides a technical description of the camera's engineering, construction, installation, and current status.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Scalability study of solid xenon

We report a demonstration of the scalability of optically transparent xenon in the solid phase for use as a particle detector above a kilogram scale. We employed a cryostat cooled by liquid nitrogen combined with a xenon purification and chiller system. A modified {\it Bridgeman's technique} reproduces a large scale optically transparent solid xenon.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Scalability, Scintillation Readout and Charge Drift in a Kilogram Scale Solid Xenon Particle Detector

We report a demonstration of the scalability of optically transparent xenon in the solid phase for use as a particle detector above a kilogram scale. We employ a liquid nitrogen cooled cryostat combined with a xenon purification and chiller system to measure the scintillation light output and electron drift speed from both the solid and liquid phases of xenon. Scintillation light output from sealed radioactive sources is measured by a set of high quantum efficiency photomultiplier tubes suitable for cryogenic applications. We observed a reduced amount of photons in solid phase compared to that in liquid phase. We used a conventional time projection chamber system to measure the electron drift time in a kilogram of solid xenon and observed faster electron drift speed in the solid phase xenon compared to that in the liquid phase.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Light sterile neutrino sensitivity at the nuSTORM facility

A facility that can deliver beams of electron and muon neutrinos from the decay of a stored muon beam has the potential to unambiguously resolve the issue of the evidence for light sterile neutrinos that arises in short-baseline neutrino oscillation experiments and from estimates of the effective number of neutrino flavors from fits to cosmological data. In this paper, we show that the nuSTORM facility, with stored muons of 3.8 GeV/c ± 10%, will be able to carry out a conclusive muon neutrino appearance search for sterile neutrinos and test the LSND and MiniBooNE experimental signals with 10σ sensitivity, even assuming conservative estimates for the systematic uncertainties. This experiment would add greatly to our knowledge of the contribution of light sterile neutrinos to the number of effective neutrino flavors from the abundance of primordial helium production and from constraints on neutrino energy density from the cosmic microwave background. Here, the appearance search is complemented by a simultaneous muon neutrino disappearance analysis that will facilitate tests of various sterile neutrino models.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The development of a cryogenic over-pressure pump

A cryogenic over-pressure pump (OPP) was tested in the prototype telescope liquid nitrogen (LN2) cooling system for the Dark Energy Survey (DES) Project. This OPP consists of a process cylinder (PC), gas generator, and solenoid operated valves (SOVs). It is a positive displacement pump that provided intermittent liquid nitrogen (LN2) flow to an array of charge couple devices (CCDs) for the prototype Dark Energy Camera (DECam). In theory, a heater submerged in liquid would generate the drive gas in a closed loop cooling system. The drive gas would be injected into the PC to displace that liquid volume. However, due to limitations of the prototype closed loop nitrogen system (CCD cooling system) for DECam, a quasiclosed-loop nitrogen system was created. During the test of the OPP, the CCD array was cooled to its designed set point temperature of 173K. It was maintained at that temperature via electrical heaters. The performance of the OPP was captured in pressure, temperature, and flow rate in the CCD LN2 cooling system at Fermi National Accelerator Laboratory (FNAL)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

nuSTORM - Neutrinos from STORed Muons: Proposal to the Fermilab PAC

The nuSTORM facility has been designed to deliver beams of electron neutrinos and muon neutrinos (and their anti-particles) from the decay of a stored muon beam with a central momentum of 3.8 GeV/c and a momentum acceptance of 10%. The facility is unique in that it will: 1. Allow searches for sterile neutrinos of exquisite sensitivity to be carried out; 2. Serve future long- and short-baseline neutrino-oscillation programs by providing definitive measurements of electron neutrino and muon neutrino scattering cross sections off nuclei with percent-level precision; and 3. Constitutes the crucial first step in the development of muon accelerators as a powerful new technique for particle physics. The document describes the facility in detail and demonstrates its physics capabilities. This document was submitted to the Fermilab Physics Advisory Committee in consideration for Stage I approval.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Neutrinos from Stored Muons nuSTORM: Expression of Interest

The nuSTORM facility has been designed to deliver beams of electron and muon neutrinos from the decay of a stored muon beam with a central momentum of 3.8 GeV/c and a momentum spread of 10%. The facility is unique in that it will: serve the future long- and short-baseline neutrino-oscillation programmes by providing definitive measurements of electron-neutrino- and muon-neutrino-nucleus cross sections with percent-level precision; allow searches for sterile neutrinos of exquisite sensitivity to be carried out; and constitute the essential first step in the incremental development of muon accelerators as a powerful new technique for particle physics. Of the world's proton-accelerator laboratories, only CERN and FNAL have the infrastructure required to mount nuSTORM. Since no siting decision has yet been taken, the purpose of this Expression of Interest (EoI) is to request the resources required to: investigate in detail how nuSTORM could be implemented at CERN; and develop options for decisive European contributions to the nuSTORM facility and experimental programme wherever the facility is sited. The EoI defines a two-year programme culminating in the delivery of a Technical Design Report.

43 PARTICLE ACCELERATORS↗