Search NASA⌕ Search

Engineering topics

Cejka, Justin T.

Publications and source records attributed to Cejka, Justin T..

Process for retrofitting an industrial gas turbine engine for increased power and efficiency

A process for retrofitting an industrial gas turbine engine of a power plant where an old industrial engine with a high spool has a new low spool with a low pressure turbine that drives a low pressure compressor using exhaust gas from the high pressure turbine, and where the new low pressure compressor delivers compressed air through a new compressed air line to the high pressure compressor through a new inlet added to the high pressure compressor. The old electric generator is replaced with a new generator having around twice the electrical power production. One or more stages of vanes and blades are removed from the high pressure compressor to optimally match a pressure ratio split. Closed loop cooling of one or more new stages of vanes and blades in the high pressure turbine is added and the spent cooling air is discharged into the combustor.

Jones, Russell B.↗

Apparatus and process of retrofitting a combined cycle power plant

A process for retrofitting an electric power plant that uses two 60 Hertz large frame heavy duty industrial gas turbine engines to drive electric generators and produce electricity, where each of the two industrial engines can produce up to 350 MW of output power. The process replaces the two 350 MW industrial engines with one twin spool industrial gas turbine engine that is capable of producing at least 700 MW of output power. Thus, two prior art industrial engines can be replaced with one industrial engine that can produce power equal to the two prior art industrial engines.

20 FOSSIL-FUELED POWER PLANTS↗