Shallow Soil Polychlorinated Biphenyl Site Assessment Report: General Services Administration Reclamation Yard Solid Waste Management Unit 010

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

soil assessment↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

PCBs↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Soil Interim Measures Implementation Report Q6 Radar Station – Solid Waste Management Unit 112 Locations of Concern 3 and 10 Kennedy Space Center, Florida

This report presents a summary of the soil interim measures (IM) implementation activities that occurred from January 23 through June 6, 2023, at the Q6 Radar Station (Q6RS) Solid Waste Management Unit (SWMU) 112, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at 10 Q6RS Locations of Concern (LOCs), identified during a SWMU assessment in 2013 (NASA 2013). Since the SWMU assessment, further confirmatory sampling and assessment was conducted for each LOC, and based on the data collected during these assessments, it was determined that Resource Conservation and Recovery Act Facility Investigation to further evaluate soil and groundwater was to be conducted at two LOCs: LOC 1 – Former Underground Storage Tanks (groundwater) and LOC 3 – Radar Antenna Refurbishment Area (soil). The LOC 1 groundwater assessment is ongoing, and the results will be presented under a separate cover. It was also determined that soil IM would be completed at two of the LOCs, LOC 3 and LOC 10 – Compressor Building Condensate Discharge. A Soil IM Work Plan was prepared and submitted in October 2021 (NASA 2021). The plan proposed excavation and disposal of barium and copper impacted soil in the LOC 3 and 10 areas. This report presents a summary and results of the soil IM implementation activities conducted at LOCs 3 and 10. The site contaminates of concern for this soil IM are barium and copper. The activities presented in this report includes soil IM implementation and groundwater sampling. From January 23 through March 24, 2023, AECOM Technical Services, Inc. (AECOM) field personnel conducted IM implementation activities in the LOC 3 and 10 areas. As presented in the IM Work Plan, shallow soils, impacted with metals, were excavated to a depth of 2 feet below land surface in the central area of the site around the radar antenna and associated equipment. AECOM personnel excavated 77.43 tons of soil using hand tools and, when able, heavy equipment. The soils were placed into lined roll-off containers, which were covered and transported under manifest to the Cedar Trail Landfill in Bartow, Florida. The site was restored to original condition using certified clean backfill material (sand), with filter fabric, and gravel. Areas outside of the excavation were restored with grass seed. On June 6, 2023, AECOM field personnel conducted groundwater sampling activities within the soil IM excavation area. AECOM personnel collected one groundwater sample from monitoring well Q6RS-MW0003. The sample was submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 6020B for metals (barium and copper). Barium and copper were detected at 18 micrograms per liter (µg/L) and 14 µg/L, respectively, and were below the State of Florida Groundwater Cleanup Target Levels (GCTLs) for barium at 2,000 µg/L and copper at 1,000 µg/L.

Chadwick Sloan Lee↗

General Services Administration Reclamation Yard Solid Waste Management Unit 010: 2022 Groundwater Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the groundwater monitoring activities that occurred in September and October 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consist of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume were tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. Groundwater monitoring for VOCs in the Chlorinated VOC Plume area was discontinued following the December 2021 annual monitoring event. Annual groundwater monitoring for underground injection control (UIC) parameters continues for both the PCB/VOA Plume and the Chlorinated VOC Plume areas. The activities presented in this report include one field event: September and October 2022, which includes sitewide semi-annual water level measurements of 55 monitoring wells, redevelopment of all monitoring wells listed in the sampling plan, and groundwater sampling of 28 monitoring wells. The sampling and analysis demonstrated that the PCB/VOA plume is not expanding and is significantly reduced compared to before a 2018 source removal interim measure. Recommendations are made for the 2023 groundwater monitoring program.

groundwater↗

General Services Administration Reclamation Yard, SWMU 010, 2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred in November and December 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include two field events: (1) November 2021 – PCB/VOA Plume groundwater sampling via Direct Push Technology – 70 groundwater samples were collected from 10 locations at varying intervals; and (2) December 2021 – Site-wide semi-annual water level measurements of 54 monitoring wells, redevelopment of 5 monitoring wells, and sampling of 35 monitoring wells. Results for the PCB/VOA plume demonstrated COCs have not rebounded since the 2018 source removal, with groundwater cleanup target levels (GCTLs) exceeded in the 10-30 ft. below ground surface interval only. In the Chlorinated VOC plume area, there were no detections of COCs above a GCTL for at least the second consecutive sampling event for the sampled wells. Cleanup objectives have been met, and it is recommended that VOC monitoring be discontinued. Underground injection control parameters will continue to be monitored in three wells until those analytes return to background concentrations.

GSA Reclamation Yard↗

General Services Administration Reclamation Yard (SWMU 010) 2020-2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred from October 2020 through June 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include four field events: (1) October 2020 – Chlorinated VOC Plume groundwater sampling via Direct Push Technology (DPT) – 68 groundwater samples were collected from 14 locations at varying intervals; (2) December 2020 – Site-wide semi-annual water level measurements of 52 monitoring wells and sampling of 39 monitoring wells; (3) May 2021 – Chlorinated VOC Plume monitoring well installation – two monitoring wells were installed and screened from 10 to 20 feet below land surface (bls); and (4) May/June 2021 – Site-wide semi-annual water level measurements of 53 monitoring wells and sampling of 40 monitoring wells. Results showed substantial reduction of both plumes. Conclusions and recommendations are presented.