PIP-II cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2 K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated reliability analysis of the PIPII cryoplant. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to mitigate LINAC thermal cycling risks during planned and unplanned subsystem outages.

43 PARTICLE ACCELERATORS↗

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗

Using in-situ strain measurements to evaluate the accuracy of stress estimation procedures from fracture injection/shut-in tests

Fracture injection/shut-in tests are commonly used to measure the state of stress. Injection creates a hydraulic fracture (or in some cases, opens a preexisting fracture), and then the pressure after shut-in is monitored to identify fracture closure. Different interpretation procedures have been proposed for estimating closure, and the procedures sometimes yield significantly different results. In this study, direct, in-situ strain measurements are used to observe fracture reopening and closure. The tests were performed as part of the EGS Collab project, a mesoscale project performed at 1.25 and 1.5 km depth at the Sanford Underground Research Facility. The tests were instrumented with the SIMFIP tool, a double-packer probe with a high-resolution three-dimensional borehole displacement sensor. The measurements provide a direct observation of the fracture closure signature, enabling a high-fidelity estimate of the fracture closure stress (ie, the normal stress on the fracture). In two of the four tests, injection created an opening mode fracture, and so the closure stress can be interpreted as the minimum principal stress. In the other two tests, injection probably opened preexisting natural fractures, and so the closure stress can be interpreted as the normal stress on the fractures. The strain measurements are compared against different proposed methods for estimating closure stress from pressure transients. The shut-in transients are analyzed with two techniques that are widely used in the field of petroleum engineering – the ‘tangent’ method and the ‘compliance’ method. In three of the four tests, the tangent method significantly underestimates the closure stress. The compliance method is reasonably accurate in all four tests. Closure stress is also interpreted using two other commonly-used methods – ‘first deviation from linearity’ and the method of Hayashi and Haimson. In comparison with the SIMFIP data, these methods tend to overestimate the closure stress, evidently because they identify closure from early-time transient effects, such as near-wellbore tortuosity. In two of the tests, microseismic imaging provides an independent estimate of the size of the fracture created by injection. When combined with a simple mass balance calculation, the SIMFIP stress measurements yield predictions of fracture size that are reasonably consistent with the estimates from microseismic. In conclusion, the calculations imply an apparent fracture toughness 2-3x higher than typical laboratory-derived values.

58 GEOSCIENCES↗

Status of the PIP-II Cryoplant

The Proton Improvement Plan-II (PIP-II) is an essential upgrade to the Fermilab accelerator complex featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac). The Linac contains 23 SRF cryomodules with the SRF cavities operating at 2 K, a high temperature thermal shield at 40 K and low temperature intercepts at 4.5 K. The PIP-II cryoplant will provide the necessary cooling for the cryomodules and the cryogenic distribution system interconnecting cryoplant and cryomodules. This paper describes the evolution of the PIP-II cryoplant conceptual design and specifications, including the expected heat loads, required cooling features and the integrated design. The cryoplant capacity margin analysis and fast cool-down mode will also be discussed.

43 PARTICLE ACCELERATORS↗

Constraining maximum event magnitude during injection-triggered seismicity

Abstract Understanding mechanisms controlling fluid injection-triggered seismicity is key in defining strategies to ameliorate it. Recent triggered events (e.g. Pohang, Mw 5.5) have exceeded predictions of average energy release by a factor of >1000x, necessitating robust methodologies to both define critical antecedent conditions and to thereby constrain anticipated event size. We define maximum event magnitudes resulting from triggering as a function of pre-existing critical stresses and fluid injection volume. Fluid injection experiments on prestressed laboratory faults confirm these estimates of triggered moment magnitudes for varied boundary conditions and injection rates. In addition, observed ratios of shear slip to dilation rates on individual faults signal triggering and may serve as a measurable proxy for impending rupture. This new framework provides a robust method of constraining maximum event size for preloaded faults and unifies prior laboratory and field observations that span sixteen decades in injection volume and four decades in length scale.

58 GEOSCIENCES↗

The PIP-II Conceptual Design Report

The Proton Improvement Plan-II (PIP-II) encompasses a set of upgrades and improvements to the Fermilab accelerator complex aimed at supporting a world-leading neutrino program over the next several decades. PIP-II is an integral part of the strategic plan for U.S. High Energy Physics as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 and formalized through the Mission Need Statement approved in November 2015. As an immediate goal, PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing proton beam power in excess of 1 MW on target at the initiation of the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) program, currently anticipated for the mid- 2020s. PIP-II is a part of a longer-term goal of establishing a high-intensity proton facility that is unique within the world, ultimately leading to multi-MW capabilities at Fermilab....

43 PARTICLE ACCELERATORS↗

Large magneto-optic enhancement in ultra-thin liquid-phase-epitaxy iron garnet films

Significant departures from bulk-like magneto-optic behavior are found in ultra-thin bismuth-substituted iron-garnet films grown by liquid-phase-epitaxy. These changes are due, at least in part, to geometrical factors and not to departures from bulk-composition in the transient layer at the film-substrate interface. A monotonic increase in specific Faraday rotation with reduced thickness is the signature feature of the observed phenomena. These are traced to size-dependent modifications in the diamagnetic transition processes responsible for the Faraday rotation. These processes correspond to the electronic transitions from singlet {sup 6}S ground states to spin-orbit split excited states of the Fe{sup 3+} ions in the garnet. A measurable reduction in the corresponding ferrimagnetic resonance linewidths is found, thus pointing to an increase in electronic relaxation times and longer lived excitations at reduced thicknesses. These changes together with a shift in vibrational frequency of the Bi-O bonds in the garnet at reduced thicknesses result in greatly enhanced magneto-optical performance. These studies were conducted on epitaxial monocrystalline Bi{sub 0.8}Gd{sub 0.2}Lu{sub 2}Fe{sub 5}O{sub 12} films.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Fly-by-light flight control system technology development plan

The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

Chakravarty, A.↗