Evaluation of a Fish Passage Site in the Walla Walla River Basin, 2009 Annual Report : September 2008 - August 2009.

In 2009, Pacific Northwest National Laboratory (PNNL) evaluated the Touchet Consolidated Facility to determine if it is designed, constructed, operated, and maintained to effectively provide juvenile salmonids with safe passage past the diversion and back to the Touchet River. Completed in 2008, the Touchet Consolidated Facility combined two irrigation diversions with an existing intake for the Touchet Acclimation Facility. The consolidated facility includes a separate fish screen and intake for each user, a pool and chute fishway, and an adult fish trap. The fish screens portions of the facility were evaluated on April 20, 2009, using underwater videography, acoustic Doppler velocimeter measurements, and visual observations while water was diverted to the acclimation facility alone and again as water was diverted to the irrigation system and pond together. The facility is in good condition and is well maintained, although water velocities within the site do not meet the criteria set by the National Marine Fisheries Service (NMFS). Approach velocities above 0.4 ft/s at the upstream end of the facility and decreases in sweep velocity toward the bypass are likely caused by the proximity of the upstream screen to the spill over stoplogs that control flow at the upstream end of the forebay. We recommend working with Touchet Acclimation Facility staff to try different configurations and heights of forebay stoplogs while PNNL staff measure water velocities, allowing real-time monitoring of changes in approach and sweep velocities resulting from the configuration changes. It may be possible to bring approach and sweep velocities more in line with the NMFS criteria for juvenile fish screens. We also recommend evaluating the facility later in the year when river levels are low and the irrigation district is the only water user. During the site visit, it was noted that the upstream end of the fishway has relatively closely spaced louvers that point downstream. During higher river levels such as on April 20, the orientation of the louvers causes a headloss of up to 1 ft or more. Fish must maneuver through this hydraulic jump and between the louvers. The Washington Department of Fish and Wildlife is considering alternatives to this configuration; if needed, we would be available to offer technical assistance.

13 HYDRO ENERGY↗

Evaluation of Fish Passage Sites in the Walla Walla River Basin, 2008

In 2008, Pacific Northwest National Laboratory evaluated the Hofer Dam fish screen and provided technical assistance at two other fish passage sites as requested by the Bonneville Power Administration, the Walla Walla Watershed Council, or the Confederated Tribes of the Umatilla Indian Reservation. Evaluation of new sites such as Hofer Dam focuses on their design, construction, operation, and maintenance to determine if they effectively provide juvenile salmonids with safe passage through irrigation diversions. There were two requests for technical assistance in 2008. In the first, the Confederated Tribes of the Umatilla Indian Reservation requested an evaluation of the Nursery Bridge fish screens associated with the fish ladder on the east side of the Walla Walla River. One set of brushes that clean the screens was broken for an extended period. Underwater videography and water velocity measurements were used to determine there were no potential adverse effects on juvenile salmonids when the west set of screens was clean enough to pass water normally. A second request, received from the National Marine Fisheries Service and the Walla Walla Watershed Council, asked for evaluation of water velocities through relatively new head gates above and adjacent to the Eastside Ditch fish screens on the Walla Walla River. Water moving through the head gates and not taken for irrigation is diverted to provide water for the Nursery Bridge fish ladder on the east side of the river. Elevations used in the design of the head gates were incorrect, causing excessive flow through the head gates that closely approached or exceeded the maximum swimming burst speed of juvenile salmonids. Hofer Dam was evaluated in June 2008. PNNL researchers found that conditions at Hofer Dam will not cause impingement or entrainment of juvenile salmonids but may provide habitat for predators and lack strong sweeping flows to encourage juvenile salmonid passage downstream. Further evaluation of velocities at the Eastside Ditch and wasteway gates should occur as changes are made to compensate for the design problems. These evaluations will help determine whether further changes are required. Hofer Dam also should be evaluated again under more normal operating conditions when the river levels are typical of those when fish are emigrating and the metal plate is not affecting flows.

13 HYDRO ENERGY↗

Appendix E: Geology

This appendix provides a detailed description of geology under the Central Plateau of the Hanford Site, emphasizing the areas around tank farms. It is to be published by client CH2M HILL Hanford Group, Inc., as part of a larger, multi-contractor technical report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Geology Data Package for the Single-Shell Tank Waste Management Areas at the Hanford Site

This data package discusses the geology of the single-shell tank (SST) farms and the geologic history of the area. The purpose of this report is to provide the most recent geologic information available for the SST farms. This report builds upon previous reports on the tank farm geology and Integrated Disposal Facility geology with information available after those reports were published.

Reidel, Stephen P↗

A summary of 22 Years of Fish Screen Evaluation in the Yakima River Basin, Summary Report 1985-2007.

Sixty fish screen facilities were constructed in the Yakima River basin between 1985 and 2006 as part of the Northwest Power and Conservation Council plan to mitigate the effects of federal hydroelectric projects on fish and wildlife populations. This report summarizes evaluations of some of those and other fish screen facilities conducted by Pacific Northwest National Laboratory (PNNL) from 1985 through 2006. The objective of these studies was to determine if the newly designed and constructed fish screens were effective at providing juvenile salmonids safe passage past irrigation diversions. To answer that question, PNNL conducted release-and-catch studies at eight Phase I sites in the Yakima River basin. Increasing concerns about the impacts of hatchery fish releases on the wild fish population, as well as the cost and time necessary to perform these kinds of biological studies at more than 60 planned Phase II sites, required development of techniques to evaluate the effectiveness of the sites without releasing fish. The new techniques involved collecting information on screen design, operation, and effectiveness at guiding fish safely through the fish screen facility. Performance measures including water velocities and passage conditions provide a good alternative to biological studies at significantly lower cost and time. Physical techniques were used at all 10 Phase I and 28 Phase II sites evaluated by PNNL over the following 19 years. Results of these studies indicate the Phase I and II fish screen facilities are designed and capable of providing safe passage for juvenile salmonids so long as construction, maintenance, and operations meet the criteria used in the design of each site and the National Marine Fisheries Service criteria for juvenile fish screen design.

13 HYDRO ENERGY↗