FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Sustainble dropwise condensation enabled ultraefficient heat pipes

Heat pipes play a critical role in determining the operations, safety, and energy efficiency of electronics. The main focus to improve the heat pipe performance is on the evaporator design or wicking structures. However, the intrinsic limitation comes from the condenser, which is fundamentally constrained by inefficient filmwise condensation (FWC). In this study, we successfully achieved a peak effective thermal conductivity (k eff ) of ~140 kW/(m·K) on widely used groove heat pipes by implementing sustainable dropwise condensation (DWC) and integrating with enhanced evaporator. To better understand the working mechanisms of the ultraefficient heat pipe, both the evaporator and condenser of the heat pipes have been modified accordingly. Our results show that up to 296% enhancements on the k eff can be achieved under various inclination angles by only inducing DWC in the condenser section. The drawback of temperature fluctuations induced by DWC in smooth heat pipes appears to be effectively solved using the grooves-wicking structure. Furthermore, by integrating the nanostructured evaporator, the k eff of the heat pipe can be boosted up to 517% compared to conventional groove heat pipes. This study, for the first time, demonstrates the huge potential of engineering both the condenser and evaporator simultaneously in developing ultraefficient heat pipes.

42 ENGINEERING↗

Certification testing of production superconducting quarter-wave and half-wave resonators for $\mathrm{FRIB}$

We report the Facility for Rare Isotope Beams (FRIB) is designed to accelerate ion beams to 200 MeV per nucleon with 46 superconducting radio-frequency cryomodules. The FRIB driver linac uses quarter-wave resonators and half-wave resonators; with a total of 324 resonators, the linac is currently the largest heavy ion accelerator in the world. Production of jacketed resonators began in January 2014 and was completed in December 2019. Dewar certification testing of all the cavities was done before they were installed into cryomodules. The experience and lessons from more than 5 years of FRIB resonator production and certification testing are analyzed and summarized in this paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Investigation of Bone Growth in Additive-Manufactured Pedicle Screw Implant by Using Ti-6Al-4V and Bioactive Glass Powder Composite

In this study, we optimized the geometry and composition of additive-manufactured pedicle screws. Metal powders of titanium-aluminum-vanadium (Ti-6Al-4V) were mixed with reactive glass-ceramic biomaterials of bioactive glass (BG) powders. To optimize the geometry of pedicle screws, we applied a novel numerical approach to proposing the optimal shape of the healing chamber to promote biological healing. We examined the geometry and composition effects of pedicle screw implants on the interfacial autologous bone attachment and bone graft incorporation through in vivo studies. The addition of an optimal amount of BG to Ti-6Al-4V leads to a lower elastic modulus of the ceramic-metal composite material, effectively reducing the stress-shielding effects. Pedicle screw implants with optimal shape design and made of the composite material of Ti-6Al-4V doped with BG fabricated through additive manufacturing exhibit greater osseointegration and a more rapid bone volume fraction during the fracture healing process 120 days after implantation, per in vivo studies.

stress-shielding effect↗