Atmospheric Boundary Layer Lidar PathfindEr (ABLE): Crosscutting DIAL for Humidity Profiling
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Charles Antill.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Laser Interferometer Space Antenna (LISA) is a partnership between the European Space Agency (ESA) and NASA to build a Gravitational Wave (GW) observatory. The observatory, which consists of a three-spacecraft constellation with a nominal separation of 2.5 million km between each spacecraft, provides a tool for scientists to directly detect gravitational waves generated from various astronomical phenomena in a waveband that is not accessible from Earth. NASA is developing laser transmitters as one of the potential US contributions to LISA. The NASA laser design leverages lessons learned from previous flight missions and included the latest technologies in photonics packaging and reliability engineering to ensure a laser lifetime of >16 years covering integration and test through a possible extended mission phase. As part of the laser development process, NASA’s Goddard Space Flight Center (GSFC) requested support from the NASA Engineering and Safety Center (NESC) to independently assess the Technology Readiness Level (TRL) of the LISA Laser System (LS). The independent assessment included the following tasks: (a) assess the design for weaknesses and suggest improvements to mitigate risks, (b) assess the laser reliability plan for weaknesses and suggest improvements to mitigate risks and improve effectiveness, and (c) assess the current redundancy plan on laser subsystems for weaknesses and suggest improvements to mitigate risks and improve effectiveness. The NESC team comprised of a team of subject matter experts (SMEs) and performed a 12-month review of every aspect of the laser design. We present the assessment findings and the current development progress of the LISA laser to meet the mission requirements with a delivery of a form, fit, and functional TRL6 laser to the LSIA mission by late 2023.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
As part of the laser development process, NASA’s Goddard Space Flight Center (GSFC) requested support from the NASA Engineering and Safety Center (NESC) to independently assess the Technology Readiness Level (TRL) of the LISA Laser System (LS). The independent assessment included the following tasks: (a) assess the design for weaknesses and suggest improvements to mitigate risks, (b) assess the laser reliability plan for weaknesses and suggest improvements to mitigate risks and improve effectiveness, and (c) assess the current redundancy plan on laser subsystems for weaknesses and suggest improvements to mitigate risks and improve effectiveness. The presentation will focus on the assessment findings and the current development progress of the LISA laser to meet the mission requirements with a delivery of a form, fit, and functional TRL6 laser to the LISA mission by late 2023.