Search NASA⌕ Search

Engineering topics

Chase, B.

Publications and source records attributed to Chase, B..

LLRF System for the Fermilab PIP-II Superconducting LINAC

PIP-II is an 800 MEV superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an ion source, RFQ and buncher cavities along with 25 superconducting cryo-modules comprised of five different acceleration \(\beta\). The LLRF system for the LINAC has to provide field and resonance control for a total of 125 RF cavities.The LLRF system design is in the final design review phase and will enter the production phase next year. The PIP-II project is an international collaboration with various partner labs contributing subsystems. The LLRF system design for the PIP-II Linac is presented and the specification requirements and system performance in various stages of testing are described in this paper.

43 PARTICLE ACCELERATORS↗

Closed Loop Testing of Microphonics Algorithms Using a Cavity Emulator

An analog crystal filter based cavity emulator is modified with reverse biased varactor diodes to provide a tuning range of around 160 Hz. The piezo drive voltage of the resonance controller is used to detune the cavity through the bias voltage. A signal conditioning and summing circuit allows the introduction of microphonics disturbance from a signal source or using real microphonics data from cavity testing. This setup is used in closed loop with a cavity controller and resonance controller to study the effectiveness of resonance control algorithms suitable for superconducting cavities.

43 PARTICLE ACCELERATORS↗

High efficiency, low cost, RF sources for accelerators and colliders

Accelerators for High Energy Physics (HEP) are large users of energy, much of it in the form of radiofrequency (RF) power to accelerate particles to very high energies. Proposed HEP projects will require even larger amounts of RF energy. Increasing concerns of the cost and availability of energy will require the HEP community to use energy as efficiently as possible. Successful transfer of HEP technology to the public and private sectors will be most effective if it is highly efficient. Historically, the HEP community has utilized available RF power sources, mainly in the form of vacuum tube technology, much of which was developed during the cold war or is otherwised used in the private sector. The private sector is moving to solid-state RF sources which do not exhibit the electrical efficiency that is needed for future HEP projects. Here we summarize the state of the development of a number of RF sources that promise efficiencies of 80% and above. We also outline future efforts that are needed to fully realize the potential of these sources.

43 PARTICLE ACCELERATORS↗

FERMILAB PIP-II BOOSTER LLRF UPGRADE

A proposed upgrade to the Fermilab Booster synchrotron is presented. A new LLRF system is required for interfac-ing to the PIP-II Linac that is currently under construction. The present feedback system has legacy analog hardware interleaved with updated digital components for control. A prototype of a new digital system using an FPGA controller is presented along with the RF hardware to handle up and down conversion of RF signals. A prototype FPGA con-troller is implemented using an Altera Cyclone V System on Chip, with 14-bit ADC’s and DAC’s running at 66 MHz. The controller theory and implementation are described in this paper, along with a description of the RF signal processing scheme.

43 PARTICLE ACCELERATORS↗

LLRF System for the Fermilab Muon g-2 and Mu2e Projects

The Mu2e experiment measures the conversion rate of muons into electrons and the Muon g-2 experiment measures the muon magnetic moment. Both experiments require 53 MHz batches of 8 GeV protons to be re-bunched into 150 ns, 2.5 MHz pulses for extraction to the g-2 target for Muon g-2 and to a delivery ring with a single RF cavity running at 2.36 MHz for Mu2e. The LLRF system for both experiments is implemented in a SOC FPGA board integrated into the existing 53 MHz LLRF system in a VXI crate. The tight timing requirements, the large frequency difference and the non-harmonic relationship between the two RF systems provide unique challenges to the LLRF system design to achieve the required phase alignment specifications for beam formation, transfers and beam extinction between pulses. The new LLRF system design for both projects is described and the results of the initial beam commissioning tests for the Muon g-2 experiment are presented.

43 PARTICLE ACCELERATORS↗

The PIP-II Conceptual Design Report

The Proton Improvement Plan-II (PIP-II) encompasses a set of upgrades and improvements to the Fermilab accelerator complex aimed at supporting a world-leading neutrino program over the next several decades. PIP-II is an integral part of the strategic plan for U.S. High Energy Physics as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 and formalized through the Mission Need Statement approved in November 2015. As an immediate goal, PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing proton beam power in excess of 1 MW on target at the initiation of the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) program, currently anticipated for the mid- 2020s. PIP-II is a part of a longer-term goal of establishing a high-intensity proton facility that is unique within the world, ultimately leading to multi-MW capabilities at Fermilab....

43 PARTICLE ACCELERATORS↗

The LCLS-II LLRF System

The SLAC National Accelerator Laboratory is planning an upgrade (LCLS-II) to the Linear Coherent Light Source with a 4 GeV CW superconducting (SCRF) linac. The SCRF linac consists of 35 ILC style cryomodules (eight cavities each) for a total of 280 cavities. Expected cavity gradients are 16 MV/m with a loaded Q L of ~ 4x10 7 . The RF system will have 3.8 kW solid state amplifiers driving single cavities. To ensure optimum field stability a single-source single-cavity control system has been chosen. It consists of a precision four-channel cavity receiver and RF stations (Forward, Reflected and Drive signals). In order to regulate the resonant frequency variations of the cavities due to He pressure, the tuning of each cavity is controlled by a Piezo actuator and a slow stepper motor. In addition the system (LLRF-amplifier-cavity) is being modeled and cavity microphonic testing has started. This paper describes the LLRF system under consideration, including recent modeling and cavity tests.

43 PARTICLE ACCELERATORS↗

FPGA-based Klystron linearization implementations in scope of ILC

We report the development and implementation of four FPGA-based predistortion-type klystron linearization algorithms. Klystron linearization is essential for the realization of ILC, since it is required to operate the klystrons 7% in power below their saturation. The work presented was performed in international collaborations at the Fermi National Accelerator Laboratory (FNAL), USA and the Deutsches Elektronen Synchrotron (DESY), Germany. With the newly developed algorithms, the generation of correction factors on the FPGA was improved compared to past algorithms, avoiding quantization and decreasing memory requirements. At FNAL, three algorithms were tested at the Advanced Superconducting Test Accelerator (ASTA), demonstrating a successful implementation for one algorithm and a proof of principle for two algorithms. Furthermore, the functionality of the algorithm implemented at DESY was demonstrated successfully in a simulation.

43 PARTICLE ACCELERATORS↗

Atom chip apparatus for experiments with ultracold rubidium and potassium gases

We present a dual chamber atom chip apparatus for generating ultracold {sup 87}Rb and {sup 39}K atomic gases. The apparatus produces quasi-pure Bose-Einstein condensates of 10{sup 4} {sup 87}Rb atoms in an atom chip trap that features a dimple and good optical access. We have also demonstrated production of ultracold {sup 39}K and subsequent loading into the chip trap. We describe the details of the dual chamber vacuum system, the cooling lasers, the magnetic trap, the multicoil magnetic transport system, the atom chip, and two optical dipole traps. Due in part to the use of light-induced atom desorption, the laser cooling chamber features a sufficiently good vacuum to also support optical dipole trap-based experiments. The apparatus is well suited for studies of atom-surface forces, quantum pumping and transport experiments, atom interferometry, novel chip-based traps, and studies of one-dimensional many-body systems.

74 ATOMIC AND MOLECULAR PHYSICS↗

Status Report on Efforts to Enhance Instrumentation to Support Advanced Test Reactor Irradiations

The Department of Energy (DOE) designated the Advanced Test Reactor (ATR) as a National Scientific User Facility (NSUF) in April 2007 to support the growth of nuclear science and technology in the United States (US). By attracting new research users - universities, laboratories, and industry - the ATR NSUF facilitates basic and applied nuclear research and development, further advancing the nation's energy security needs. A key component of the ATR NSUF effort at the Idaho National Laboratory (INL) is to design, develop, and deploy new in-pile instrumentation techniques that are capable of providing real-time measurements of key parameters during irradiation. To address this need, an assessment of instrumentation available and under-development at other test reactors was completed. Based on this initial review, recommendations were made with respect to what instrumentation is needed at the ATR, and a strategy was developed for obtaining these sensors. In 2009, a report was issued documenting this program’s strategy and initial progress toward accomplishing program objectives. Since 2009, annual reports have been issued to provide updates on the program strategy and the progress made on implementing the strategy. This report provides an update reflecting progress as of January 2014.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

2012 Status Report on Efforts to Enhance Instrume

The Department of Energy (DOE) designated the Advanced Test Reactor (ATR) as a National Scientific User Facility (NSUF) in April 2007 to support U.S. leadership in nuclear science and technology. By attracting new research users - universities, laboratories, and industry - the ATR NSUF facilitates basic and applied nuclear research and development, further advancing the nation's energy security needs. A key component of the ATR NSUF effort at the Idaho National Laboratory (INL) is to design, develop, and deploy new in-pile instrumentation techniques that are capable of providing real-time measurements of key parameters during irradiation. To address this need, an assessment of instrumentation available and under-development at other test reactors was completed. Based on this initial review, recommendations were made with respect to what instrumentation is needed at the ATR, and a strategy was developed for obtaining these sensors. In 2009, a report was issued documenting this program’s strategy and initial progress toward accomplishing program objectives. Since 2009, annual reports have been issued to provide updates on the program strategy and the progress made on implementing the strategy. This report provides the 2012 update.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Status and Plans for a SRF Accelerator Test Faciliy at Fermilab

A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration secti on consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of gene rating a 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. In addition to testing accelerator components, this facilit y will be used to test RF power equipment, instrumentation, LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

43 PARTICLE ACCELERATORS↗

Modeling the LLRF Control of a Multi-Cavity RF Station for Project-X

Fermilab’s High Intensity Neutrino Source (HINS), the 325 MHz low energy section of Project X consists of an RFQ, 18 copper cavities and a section of superconducting spoke resonator cavities, all driven by a single 2.5 MW klystron. Each cavity has a high power ferrite vector modulator which provides individual RF power control. This paper proposes a scheme that optimizes RF drive and vector modulator control. The different gradients, acceleration phase angles, unloaded Q’s and beam loading are taken into account to optimize the cavities detuning angles, forward power, and loaded Q’s. This scheme makes an efficient use of the klystron’s high bandwidth ability to modulate the forward power, hence minimizing the burden on the high power vector modulator during the RF pulse. The proposed method is explained in details, a parameter sensitivity analysis is performed and the impact on the total power consumption for the RF station is calculated.

Branlard, J.↗