Search NASASearch

Engineering topics

Chen, Allen

Publications and source records attributed to Chen, Allen.

At least 19 records

Assessment of M2020 Terrain Relative Landing Accuracy: Flight Performance vs Predicts

Terrain Relative Navigation (TRN) was a critical enabling Entry, Descent, and Landing (EDL) technology that enabled Mars 2020 mission Perseverance rover to land at Jezero crater. TRN pro-vides real-time, autonomous, map-relative position determination and generates a landing target based on a priori knowledge of hazards. The required performance for TRN was to land within 60m of the selected target. The required 60m was sub-allocated to various error sources in three major categories: targeting error, knowledge error, and control error. The targeting error is the error in selecting an appropriate landing target and the knowledge of the target on the surface. It includes the Lander Vision System (LVS) position localization with respect the ground, the synchronization between the Lander Vision System measurement and the main Navigation filter, and errors associated with the LVS Reference Map and Safe Target Selec-tion (STS). The knowledge error is the contribution of knowledge growth from the synchronization with LVS to touchdown. The control error encompasses how accurately the system could stay on the desired reference trajectory. The TRN error budget uses a combination of analysis, simulation, and hardware test-ing results to bound the various error contributions obtained during the verification and validation process. This paper first presents a description the TRN system, focusing on the architecture of LVS and STS. The paper then gives detailed overview of the TRN error budget, with a description of the major error contribu-tions in each of the three categories. Next, the paper gives the results for three versions of the error budget, pre-launch, in-flight pre-landing, and post-landing. The paper compares the pre-flight analysis, the pre-landing analysis using in-flight data during cruise, to the post-landing analysis of the TRN performance. Pre-landing analysis best estimate of the landing performance was 33m, compared to the 60m require-ment. Post-landing analysis estimated a landing accuracy of 8.53m or better, much better than the 33m pre-landing estimate. The actual post-landing imagery calculated the distance of the rover to the targeted location to be 5m. The post-landing analysis closely bounds the image-based assessment of landing accu-racy, indicating the success of the error budget architecture in bounding the landing accuracy, as well as the fidelity of the simulations used to model and predict performance.

Chen, Allen

Mars 2020 Entry, Descent, and Landing system overview

Building upon the success of the Mars Science Laboratory (MSL) landing and surface mission, the Mars 2020 project is a flagship-class science mission intended to address key questions about the potential for life on Mars and collect samples for possible Earth return by a future mission. [1] Mars 2020 will also demonstrate technologies needed to enable future human expeditions to Mars. Utilizing the groundbreaking entry, descent, and landing (EDL) architecture pioneered by the MSL, [2] [3] Mars 2020 will launch in July 2020 and land on Mars in February 2021.

Lefland, Mallory

Overview of the Mars 2020 Parachute Risk Reduction Activity

In 2012, the Mars Science Laboratory (MSL) landed safely on the surface of Mars using a supersonic Disk-Gap-Band (DGB) parachute, which was structurally qualified for flight via a subsonic wind tunnel test program. Results of the Low Density Supersonic Decelerators (LDSD) program have called into question the methodology and principles that form the foundation of the MSL subsonic test program. LDSD discovered that quasi-static subsonic proof loading a parachute via ground testing may not provide canopy stresses that sufficiently bound the stresses experienced during a rapid supersonic inflation at Mars. Additionally, deeper scrutiny of the materials and structural margins present in previously successful supersonic DGBs indicated that the MSL parachute flew with lowest margins of any previous parachute. These factors have increased the perceived risk of reusing a heritage MSL DGB parachute design with a subsonic test program for Mars 2020. To reduce this risk,a series of risk reduction steps were initiated starting in 2016. First, two parachute assemblies have been pursued in parallel: a Build-to-Print (BTP) MSL parachute, designed and manufactured by Pioneer Aerospace Corporation, which maintains the heritage of the successful MSL parachute, and a strengthened parachute, designed and manufactured by Airborne Systems North America, which uses higher strength materials throughout the parachute assembly but maintains the same overall size as the MSL parachute. Second, each parachute system was tested in a subsonic wind tunnel to examine the canopies in their fully inflated state and assess the workmanship of each canopy. Finally, full-scale parachutes from each vendor will experience at least one supersonic inflation at Mars relevant Mach numbers and atmospheric densities at Earth via a supersonic sounding rocket test campaign. This paper presents high-level details regarding the risk reduction strategy, the two candidate parachute configurations, the ground test program, and the supersonic flight test program, and brief results from each of the test programs.

Chen, Allen

Leveraging Heritage on the Mars 2020 Project

NASA’s Mars 2020 mission is charged with responding to the highest priority objectives of the 2011 planetary sciences decadal survey, conducting extensive in-situ science on the surface of the Red Planet, and carrying important cross-agency human precursor technologies. The mission concept was predicated on and enabled by leveraging the Curiosity rover engineering design, successful Sky Crane landing systems, and other elements from the Mars Science Laboratory project into a new mission with new payload elements. High-heritage paradigms are unusual for flagship science missions and can be difficult to execute as the realities of spacecraft development intervene. However the project has had good success to-date from concept through formulation and into early implementation. This paper will describe the general approaches developed and used by the Mars 2020 Project team at NASA’s Jet Propulsion Laboratory (JPL).

Wallace, Matthew