Search NASASearch

Engineering topics

Cheryl Gramling

Publications and source records attributed to Cheryl Gramling.

At least 19 records

The Design of a Flexible, Interoperable Navigation Signal for Future Lunar Missions

The LunaNet Interoperability Specification (LNIS) is a set of standards currently under development by NASA, ESA, and JAXA, which define a common, interoperable set of services and interfaces for lunar communication and navigation. The LNIS includes specifications for the GNSS-like Augmented Forward Signal (AFS). The LANS (Lunar Augmented Navigation Service) will be comprised of Multiple LunaNet Service Provider (LNSP) nodes broadcasting the AFS, such as NASA’s LCRNS (Lunar Communications Relay and Navigation Systems), ESA’s Moonlight LCNS (Lunar Communication and Navigation Services) and the Japan LNSS (Lunar Navigation Satellite System). The LANS will provide a GNSS-like capability enabling orbiting and surface users in lunar space (such as Artemis) to estimate their position, velocity and time as described in Giordano et al., (2023). Initial capabilities will focus on providing service to the lunar South pole region. The specification of AFS defines two orthogonal signal components on a single carrier, with the in-phase component (AFS-I) being a lower-chip-rate data channel tailored for applications where low SWaP is critical (e.g., IoT devices or search and rescue), and the quadrature component (AFS-Q) being a high-chip-rate data-less pilot signal for high-precision, robust lunar navigation and positioning applications. An initial description of AFS was provided in the LNIS, (2023), and initial analysis results were shown in Dafesh, et al., (2024). In this work, we provide rationale for updates to the LNIS that define key aspects of the signal including the primary spreading code designs for the data and pilot channels, and a three-tiered overlay code approach for the pilot channel that provides flexible signal acquisition alternatives, rapid time dissemination and robust frame Sync. The paper also describes a robust data sync word that is designed to enable frame Sync. for low-SWaP receivers that only use the I channel, as well as a low-density parity check code (LDPC) data message encoding design and interleaving definition. The work further describes the impact of the updated AFS design in terms of improved acquisition performance, interference resistance, navigation message capabilities and rapid absolute time dissemination for users able to access clock and ephemeris data over an external network. The cross-correlation and synchronization performance of the AFS design is also compared to potential alternatives, further providing rationale for the final signal design configuration.

LunaNet

LunaNet Position, Navigation, and Timing Services and Signal, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. September 2022 introduced the National Aeronautics and Space Administration’s (NASA) Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever commercial mission, launched by a commercial launch service provider, aiming to land on the lunar surface. The NASA Artemis programme plans initial crewed landings and traverses in 2025, supported by the Lunar Gateway, followed by regular launches to build the lunar systems (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with Commercial Lunar Payload Services (CLPS, (NASA, n.d.)) to deliver science and technology to the Moon, with launches starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) programme plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target the Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, and surface crew and rovers). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This includes a description of the high-level LANS concept and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet

NASA’s Goddard Space Flight Center’s Distributed Systems Missions Architecture

Space and Earth Science are being transformed by applying a distributed approach to missions, where the fusion of data from components, systems, instruments, models, and observation locations works in concert with timely responses and feedback mechanisms to multiply the knowledge obtained. Additionally, a disaggregated approach allows for a distributed cost and schedule that can be shared across multiple organizations to enable the greater mission. With the advances in reduced size, weight, and power for space-worthy components leading to the revolution in smaller spacecraft, the cost and timeliness proposition for launching multiple space assets has also greatly improved. Thus, the aerospace industry is undergoing a paradigm shift toward a proliferation of small satellites as a networked approach to meet mission objectives. This paper will describe the impetus, goal, and path to provide an openly available framework as a unifying catalyst for broad-ranging Distributed Systems Missions (DSMs) contributors.

Distributed Systems

Interoperable Services to Mitigate Lunar Position, Navigation, and Timing Challenges

Across the Earth, both civilian and government endeavors enjoy a built-in reliance on a position, navigation, and timing (PNT) infrastructure to which they are largely blind. Whether walking, driving, flying, or orbiting, Earth-centric PNT systems that have evolved over decades provide a core functionality to which we have grown accustomed for these pursuits. As NASA joins with other government space agencies and commercial partners to return humans to the Moon in a sustained manner within the current decade, expectations for PNT knowledge and timeliness at the Moon rival those on Earth. The need exists to develop a viable lunar-centric PNT infrastructure to support the planned human and robotic exploits. Navigating within the influence of the Moon presents its own set of challenges. Identification, understanding, and use of a unified reference frame and time system on which navigation is based becomes a fundamental need at the Moon. In addition to the unified foundational elements, measurement liability, dynamic conditions that require Earth-independent autonomous operations, and standards for PNT signals and message-based data exchange each represent distinct challenges to navigation in a burgeoning operational lunar environment. The PNT services planned as part of the lunar communications and navigation relay architecture known as LunaNet aid in surmounting the challenges. LunaNet interoperability specifications stipulate standards for signal parameters, messages, and lunar reference systems for PNT services. Within LunaNet’s defined interoperability resides the concept of a Reference Signal to provide communication signals specifically structured to enable measurement of pseudorange, Doppler, and time transfer by the recipient. One such signal type, the Augmented Forward Signal (AFS), functions as the mainstay for LunaNet PNT, while also serving the data needs for ubiquitous broadcast of network access and rapid unscheduled dissemination of alerts and messages. The presence of a geometrically distributed network of orbiting nodes transmitting the AFS forms the basis for the Lunar Augmented Navigation System (LANS), that delivers both radio navigation and data to multiple users in the lunar environment simultaneously. After reviewing the challenges associated with lunar navigation, this paper will describe the concepts and rationale behind the LunaNet PNT services. By borrowing techniques from Earth-centric Global Navigation Satellite Services (GNSS), the Tracking and Data Relay Satellite System, and the Consultative Committee for Space Data Standards, PNT from LunaNet aids to overcome challenges faced for accurate lunar navigation.

LunaNet

NASA’s Goddard Space Flight Center’s Distributed Systems Missions Architecture

Space and Earth Science are being transformed by applying a distributed approach to missions, where the fusion of data from components, systems, instruments, models, and observation locations works in concert with timely responses and feedback mechanisms to multiply the knowledge obtained. Additionally, a disaggregated approach allows for a distributed cost and schedule that can be shared across multiple organizations to enable the greater mission. With the advances in reduced size, weight, and power for space-worthy components leading to the revolution in smaller spacecraft, the cost and timeliness proposition for launching multiple space assets has also greatly improved. Thus, the aerospace industry is undergoing a paradigm shift toward a proliferation of small satellites as a networked approach to meet mission objectives. This paper will describe the impetus, goal, and path to provide an openly available framework as a unifying catalyst for broad-ranging Distributed Systems Missions (DSMs) contributors.

Distributed Systems

Interoperable Services to Mitigate Lunar Position, Navigation, and Timing Challenges

Across the Earth, both civilian and government endeavors enjoy a built-in reliance on a position, navigation, and timing (PNT) infrastructure to which they are largely blind. Whether walking, driving, flying, or orbiting, Earth-centric PNT systems that have evolved over decades provide a core functionality to which we have grown accustomed for these pursuits. As NASA joins with other government space agencies and commercial partners to return humans to the Moon in a sustained manner within the current decade, expectations for PNT knowledge and timeliness at the Moon rival those on Earth. The need exists to develop a viable lunar-centric PNT infrastructure to support the planned human and robotic exploits. Navigating within the influence of the Moon presents its own set of challenges. Identification, understanding, and use of a unified reference frame and time system on which navigation is based becomes a fundamental need at the Moon. In addition to the unified foundational elements, measurement liability, dynamic conditions that require Earth-independent autonomous operations, and standards for PNT signals and message-based data exchange each represent distinct challenges to navigation in a burgeoning operational lunar environment. The PNT services planned as part of the lunar communications and navigation relay architecture known as LunaNet aid in surmounting the challenges. LunaNet interoperability specifications stipulate standards for signal parameters, messages, and lunar reference systems for PNT services. Within LunaNet’s defined interoperability resides the concept of a Reference Signal to provide communication signals specifically structured to enable measurement of pseudorange, Doppler, and time transfer by the recipient. One such signal type, the Augmented Forward Signal (AFS), functions as the mainstay for LunaNet PNT, while also serving the data needs for ubiquitous broadcast of network access and rapid unscheduled dissemination of alerts and messages. The presence of a geometrically distributed network of orbiting nodes transmitting the AFS forms the basis for the Lunar Augmented Navigation System (LANS), that delivers both radio navigation and data to multiple users in the lunar environment simultaneously. After reviewing the challenges associated with lunar navigation, this paper will describe the concepts and rationale behind the LunaNet PNT services. By borrowing techniques from Earth-centric Global Navigation Satellite Services (GNSS), the Tracking and Data Relay Satellite System, and the Consultative Committee for Space Data Standards, PNT from LunaNet aids to overcome challenges faced for accurate lunar navigation.

Navigation

Using Coordinated, Multi-Agent Platforms for Dynamic Ocean Worlds Science

Planetary science missions have the opportunity to enhance science return through deployment of autonomous capabilities designed to dynamically respond to new information. Future outer solar system missions to ocean worlds in particular would benefit from this technology - intelligent science payloads (ISP) - because it would allow for a coordinated, near real-time response to ephemeral ‘events’ such as plumes, tectonism, surface implantation, volatile releases, thermal and magnetic anomalies, or radiation, as well as increasing the cadence and coverage of data collection. Prioritization and decision-making frameworks from ISP could be deployed at various scales - from analysis onboard a spacecraft with multiple instruments – to coordinated analyses among separate spacecraft in an e.g., distributed systems mission (DSM) composed of multiple SmallSats. Goddard’s Intelligent Science Payload team is developing an agile autonomous architecture for an icy ocean worlds DSM concept. Our goals are to coordinate data collection and onboard data analysis, and to make autonomous decisions for new data collection and analysis based on science priorities between multiple spacecraft with variable instrumentation and orbits. We use a range of data analysis tools to coordinate the DSM response, spanning from observations of data over a specified threshold to more computationally intensive machine learning algorithms (ML). ML algorithms here currently focus on determining the composition of an ocean world using mass spectrometry, and specifically methods for understanding ‘novelties’ and potential biosignatures. These algorithms could be used to quickly process and analyze onboard data that would be significantly delayed in downlink due to long communication delays for outer solar system missions in order to make dynamic science observations. Our ocean worlds case study ISP architecture is intended as an ‘agile’ and modular framework that could be used as a whole or as particular modules based on mission needs.

Distributed Systems

Artemis Navigation Architecture: Early Capabilities and Long Term Evolvability and Evolution

With the awarding of multiple contracts within the Artemis program and building on the success of Artemis I, NASA is investing in and demonstrating the vehicle capabilities necessary for a return to human crewed Lunar Missions. To support activities on the lunar surface, NASA is also assessing architecture options and approaches to enable high precision in-situ navigation within the lunar sphere of influence. These capabilities build on decades of research and advancements within the field, building and evolving the techniques used during Apollo. To support inter-operability and broad application within its elements, NASA conducted a trade on Orbital and Surface Lunar Architecture for PNT. Time-defined mission requirements were captured across elements to inform a phased approach and deployment of needed capability. The architecture must also address unique aspects of the South Pole lunar environments, specifically in terms of harsh lighting and hazardous terrain. To inform the study, documentation of primary users, operational concepts of operations, driving scenarios, and mission needs were used to define performance constraints and phasing. Multiple technologies were assessed in terms of maturity, applicability, and performance to meet the primary user needs forecast. The results of this study support the utilization of in-situ orbital infrastructure to provide a back-bone for navigation and emphasize the need for a common Lunar Reference System and Lunar Time Reference. This deployment can ensure compatibility and enable a high-accuracy in-situ capability. This provides further justification for the capabilities being invested in and deployed by NASA and other international agencies. In addition to including advancements in terrestrial surface navigation, NASA is also applying lessons learned and innovation in the contractual approach to the individual elements by means of a services-based contract mechanism. This impacts the navigation architecture heavily in terms of government and provider roles, in terms of levels of implementation, interoperability, and verification. These distinctions in roles provide constraints to the architecture approach in terms of implementation and integration and will be discussed. The development, use, and mandate of interoperability standards are being deployed to support cross-element compatibility. This paper will provide a summary of the NASA Lunar Navigation needs across its various elements and the proposed deployment of an integrated navigation architecture to support early mission needs with inherent extensibility towards the future.

Evan Anzalone

Defining a Global Lunar Position, Navigation, and Timing System

As NASA seeks to fulfill its mission of extending humanity’s reach through exploration as delineated in the Moon to Mars Strategy and Objectives Development and the Moon to Mars Architecture Definition Document, accurate and timely position, navigation, and timing (PNT) services are critical in the architecture, identifying a need to expand a PNT capability to the full lunar proximity service volume. This is echoed in the White House Office of Science, Technology, and Policy Cislunar Science and Technology Strategy, which pinpoints the fundamental need for PNT infrastructure to enable and sustain a vibrant cislunar ecosystem. While the Human Lunar Return segment seeks commercial services to provide a PNT service over a South Pole service volume for a limited period per Earth day, meeting the Sustained Lunar Evolution segment requires a Lunar Navigation System (LNS) focused on delivery of precise and resilient PNT services across the lunar globe and near-Moon space. This presentation describes the pre-Phase A system concept for an orbital constellation, the requisite lunar surface-based in-situ monitor and control segment, and an Earth control segment to provide lunar PNT services out to 200km altitude above the surface. The LNS leverages the foundational efforts on lunar reference system components such as the Lunar Geodetic System, Lunar Time System, and lunar ephemeris and orientation critical to safe, accurate, and seamless navigation.

navigation

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone

Laser Communications Relay Demonstration Optimetrics Experiment

Within this paper, we report on an Optimetrics experiment conducted on the National Aeronautics and Space Administration (NASA) Laser Communication Relay Demonstration (LCRD). The high precision two-way ranging is conducted on the optical communications link between the LCRD space terminal in a geosynchronous orbit and the Optical Ground Station 1 (OGS1) at Table Mountain, California, and is referred to as optimetrics ranging. The receiver to transmitter clock loopback is implemented in the LCRD space modem. A digital dual mixer time difference phase meter (DDMTD) is implemented in the OGS1 ground modem. The round-trip time is measured with the DDMTD by counting the frame and data clock ticks between transmitter and receiver frame synchronization markers for coarse range, and the relative phase of the transmit and receive clock for high precision range. This approach provides coverage for all potential ranges with no ranging ambiguity. The flight modem FPGA code was modified for frame and data clock loopback and the OGS1 FPGA code was modified for the DDMTD phase meter implementation. The experiment team conducted a 36-hour continuous ranging measurement. Preliminary two-way optimetrics ranging data show a noise floor of 3cm (rms). Based on our theoretical noise analysis and ground tests with spare flight modems, we expected one order of magnitude improvement on ranging precision. We are conducting detailed post data processing to identify the differences to further reduce the noise level and formulating an improved implementation approach for future missions. For reference and comparison, traditional Radio Frequency (RF) ranging between LCRD and OGS1 was conducted at the same time and indicates a ranging noise floor of 30cm(rms). Other telemetry and relevant environmental parameters such as weather and atmosphere temperature were also collected for offline data processing. The high precision ranging and range rate measurements from the laser communications data link clock and clock phase are performed simultaneously with continuous optical communication. No extra hardware added to existing system. This high precision optimetrics measurement implementation provides alternative ranging and range rate measurements for orbit determination (OD) and flight dynamics calculations with higher precision. We see significant improvement on OD for navigation upon implementation in future optical communication systems.

Rafael Garcia

Ultra-Low Noise Laser and Optical Frequency Comb-Based Timing System for the Event Horizon Explorer (EHE) Mission

Very Long Baseline Interferometry (VLBI) requires a highly stable time reference and synchronization system to maintain coherence between observations recorded independently at multiple stations – for example, the array of ground-based radio telescopes that comprise the Event Horizon Telescope (EHT). Instability in the time reference or inaccuracy in the synchronization impacts phase conference and reduces the performance of the VLBI system. For space-based telescopes like the Event Horizon Explorer (EHE) mission, the precision timing system must meet the size, weight, and power (SWaP) constraints of the spacecraft platform and be capable of operating in the space environment. The EHE mission is a proposed extension to the EHT that can improve the angular and time resolution of observations by enabling longer interferometric baselines than are possible on the Earth and sampling a wide range of Fourier spatial frequencies throughout the orbital motion. In this effort, we demonstrate the performance of one option for the EHE mission: the use of a space-qualified, ultra-low noise laser developed as part of the Laser Interferometer Space Antenna (LISA) mission as the timing reference, and an optical frequency comb to transfer the stability of this laser to the microwave regime for instrumentation use. We describe the implementation of the microwave down-conversion, in which the LISA cavity-stabilized laser is locked to a self-referenced optical frequency comb to divide the optical frequency down to 100 MHz. The phase noise of the 100 MHz signal is measured and validated using a phase noise analyzer that is referenced to a separate laboratory ultra-stable laser system. We present the results of this experiment, which demonstrates that the performance of this system meets the EHE requirement: a relative frequency error of 1e-14 from 1 to 30 seconds.

Hannah Tomio

Assessing Utility of Different Orbits for a Lunar PNT Constellation

"As the Artemis program establishes a long-term presence on the lunar surface, lunar surface users will need an accurate source of Position, Navigation, and Timing (PNT). Under the LunaNet framework, NASA has proposed the Lunar Navigation System (LNS), a constellation of satellites in lunar orbit which will broadcast LunaNet’s Augmented Forward Signal (AFS) [1] to the lunar surface. LNS will have the objective of providing user position accuracies of 10 m and timing accuracies of 10 microseconds on the lunar surface and up to 200 km above the surface. Several classes of orbits are possibilities for the LNS constellation, including circular orbits, eccentric orbits, and various families of 3-body orbits. Each of these orbit classes have both advantages and disadvantages in their utility as PNT constellations. In this study we examine a wide variety of potential LNS constellations and evaluate their performance against several metrics, including: a. Dilution of Precision (DOP) performance over the lunar service volume and the South Pole region, during both the constellation buildup and after the constellation is completed. b. Number of satellites required to achieve required DOP performance. c. Relative dynamics of LNS satellites with respect to surface users. d. Signal in space error (SISE) performance, assuming orbit determination that includes the Global Positioning System (GPS), crosslinks, and monitor sites on the surface of the moon. e. Constellation insertion, station keeping, and disposal costs. f. Specific Concept of Operations (CONOPS) and engineering challenges associated with establishing and operating the constellations. (E.g., frequent station keeping, variable signal strength, divergent CONOPS for different planes of the constellation.) The system’s performance is considered both independently and in combination with other proposed systems, such as NASA’s Lunar Communication Relay and Navigation System (LCRNS) and ESA’s Moonlight constellation. The study concludes that a 3-plane Walker constellation at 6 lunar radii (slightly higher than GPS’s 4.2 earth radii from a geometry perspective, but significantly closer in an absolute sense) is a good candidate for the LNS constellation, providing the user with good SISE and DOP performance, while not requiring excessive station keeping or complex CONOPS. However, other viable concepts exist and could be chosen if early South Pole coverage is a driving factor in the system design."

navigation