Search NASA⌕ Search

Engineering topics

Choi, A. S.

Publications and source records attributed to Choi, A. S..

Baseline Fuel Fabrication Facility

PRO-RR is the research reactor focused program element of the broader Proliferation Resistance Optimization program (PRO-X) under the National Nuclear Safety Administration (NNSA) in the U.S. Department of Energy (DOE). PRO-X provides a framework for integrating proliferation resistance in nuclear system designs to minimize weapons usable nuclear materials (WUNM) production and diversion pathways while optimizing systems performance for peaceful use missions. PRO-RR applies the PRO-X mission objectives to research reactor system design. This document serves as one of the foundational documents for the PRO-RR-Fuel System Design technical team by documenting a baseline fuel fabrication facility to be used for further optimization studies. The PRO-RR-Fuel System Design technical team consists of subject matter experts from Argonne National Laboratory (Argonne) and Savannah River National Laboratory (SRNL). In order to develop specific strategies for fuel fabrication facilities to optimize proliferation resistance, performance, and safety, a baseline fuel fabrication facility design basis was developed. Having a baseline design basis allows for the qualitative and quantitative comparison of design choices in the optimization process. This report describes the baseline fuel fabrication facility and general optimization strategy. Chapter 2 describes the fuel system selected for examination, the fabrication process used as the baseline, a description of the model developed to track uranium utilization, and a generic floorplan of the fabrication facility. Chapter 3 describes the overarching optimization strategy that could be implemented for a fabrication facility.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preliminary Analysis of Species Partitioning in the DWPF Melter - Sludge Batch 7b

The goal of the work described in this report is to provide additional off-gas carryover data from the Defense Waste Processing Facility (DWPF) melter to support the estimation of off-gas carryover rates from the Low Activity Waste (LAW) melter at the Hanford Site. Of particular interest is to determine the volatility of technetium-99 (Tc-99), which is a key isotope of concern for disposal and is a significant challenge to retain in glass in the Hanford waste treatment flowsheet. Since the DWPF melter is not equipped with routine offgas monitoring and/or sampling capabilities, the off-gas carryover data had to be extracted using component mass balance of the measured feed and pour stream (PS) glass compositions under time-averaged melter operating conditions over the duration of one canister-filling cycle, typically 20-25 hours. The method was first tested using the Sludge Batch 6 (SB6) PS sample data taken while Canister #3472 was being filled on 12/20/2010, approximately three months after the (argon) glass bubblers were installed. The method was tested again using the SB7a PS sample data taken while Canister #3619 was being filled on 8/5/2011 with the glass bubblers in operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DWPF Melter Off-Gas Chemistry Model for the Nitric-Glycolic Acid Flowsheet

The Defense Waste Processing Facility (DWPF) melter off-gas flammability model for the current nitricformic acid (NFA) flowsheet was revised in Revision 0 to reflect the upcoming reductant change from formic to glycolic acid. The necessary data for the model revision was obtained during Phase 2 of the Coldcap Evaluation Furnace (CEF) test, which was completed on March 21, 2014 after 24 days of round-theclock feeding and pouring, including a total downtime of ~20 hours due to equipment failures. Specifically, the CEF was run to generate steady state melter off-gas data during the first 10 days using two nitricglycolic acid (NGA) flowsheet feeds prepared at 100% and 125% acid stoichiometry from the same Sludge Batch 6 (SB6) simulant used during the Phase 1 CEF test in 2013. Each feed was fed under both bubbled and non-bubbled conditions, while maintaining the CEF vapor space temperature constant for at least two hours approximately at 700, 600, 500, 400, 350, and <300 °C for a total of 26 steady state runs. During the next 8 days, the CEF was run at the nominal vapor space temperature of 700 °C to generate the off-gas surge data using the 100% acid-stoichiometry feed under bubbled and non-bubbled conditions. The remaining days were spent on producing additional data using the 100% acid-stoichiometry feed spiked with excess antifoam as well as re-running some of the earlier steady state runs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DWPF Melter Off-Gas Chemistry Model for the Nitric-Glycolic Acid Flowsheet

The Defense Waste Processing Facility (DWPF) melter off-gas flammability model for the current nitric- formic acid (NFA) flowsheet was revised in Revision 0 to reflect the upcoming reductant change from formic to glycolic acid. The necessary data for the model revision was obtained during Phase 2 of the Cold-cap Evaluation Furnace (CEF) test, which was completed on March 21, 2014 after 24 days of round-the-clock feeding and pouring, including a total downtime of ~20 hours due to equipment failures.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Preliminary analysis of species partitioning in the DWPF melter. Sludge batch 7A

The work described in this report is preliminary in nature since its goal was to demonstrate the feasibility of estimating the off-gas carryover from the Defense Waste Processing Facility (DWPF) melter based on a simple mass balance using measured feed and glass pour stream (PS) compositions and time-averaged melter operating data over the duration of one canister-filling cycle. The DWPF has been in radioactive operation for over 20 years processing a wide range of high-level waste (HLW) feed compositions under varying conditions such as bubbled vs. non-bubbled and feeding vs. idling. So it is desirable to find out how the varying feed compositions and operating parameters would have impacted the off-gas entrainment. However, the DWPF melter is not equipped with off-gas sampling or monitoring capabilities, so it is not feasible to measure off-gas entrainment rates directly. The proposed method provides an indirect way of doing so.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DWPF Melter Off-Gas Flammability Assessment for Sludge Batch 9

The slurry feed to the Defense Waste Processing Facility (DWPF) melter contains several organic carbon species that decompose in the cold cap and produce flammable gases that could accumulate in the off-gas system and create potential flammability hazard. To mitigate such a hazard, DWPF has implemented a strategy to impose the Technical Safety Requirement (TSR) limits on all key operating variables affecting off-gas flammability and operate the melter within those limits using both hardwired/software interlocks and administrative controls. The operating variables that are currently being controlled include; (1) total organic carbon (TOC), (2) air purges for combustion and dilution, (3) melter vapor space temperature, and (4) feed rate. The safety basis limits for these operating variables are determined using two computer models, 4-stage cold cap and Melter Off-Gas (MOG) dynamics models, under the baseline upset scenario - a surge in off-gas flow due to the inherent cold cap instabilities in the slurry-fed melter.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DWPF Melter Off-Gas Flammability Model for the Nitric-Glycolic Acid Flowsheet

The existing DWPF melter off-gas flammability model for the nitric-formic acid flowsheet feeds has been revised to reflect the upcoming reductant change from formic to glycolic acid. The necessary data for the model revision was obtained during Phase 2 of the Cold cap Evaluation Furnace (CEF) test, which was completed on March 21, 2014 after 24 days of round-the-clock feeding and pouring, including a total downtime of ~20 hours due to equipment failures. Specifically, the CEF was run to generate steady state melter off-gas data during the first 10 days using two nitric-glycolic acid flowsheet feeds prepared from a Sludge Batch 6 (SB6) simulant at 100% and 125% acid stoichiometry. Each feed was run under both bubbled and non-bubbled conditions, while maintaining the CEF vapor space temperature constant for at least two hours each targeting at 700, 600, 500, 400, 350, and <300 °C for a total of 24 steady state runs. During the next 8 days, the CEF was run at nominal vapor space temperature of 700 °C to generate off-gas surge data using the 100% acid stoichiometry feed under both bubbled and non-bubbled conditions. The remaining days were spent on producing additional steady state data using the 100% acid stoichiometry feed spiked with excess antifoam as well as re-running some of the earlier steady state runs.

CEF Phase 2↗

Data Analysis and Model Validation (2013 CEF Run - Phase 1)

Phase 1 of the 2013 Cold cap Evaluation Furnace (CEF) test was completed on June 3, 2013 after a 5-day round-the-clock feeding and pouring operation. The main goal of the test was to characterize the CEF offgas produced from a nitric-formic acid flowsheet feed and confirm whether the CEF platform is capable of producing scalable off-gas data necessary for the revision of the DWPF melter off-gas flammability model; the revised model will be used to define new safety controls on the key operating parameters for the nitric-glycolic acid flowsheet feeds including total organic carbon (TOC). Whether the CEF off-gas data were scalable for the purpose of predicting the potential flammability of the DWPF melter exhaust was determined by comparing the predicted H 2 and CO concentrations using the current DWPF melter off-gas flammability model to those measured during Phase 1; data were deemed scalable if the calculated fractional conversions of TOC-to-H 2 and TOC-to-CO at varying melter vapor space temperatures were found to trend and further bound the respective measured data with some margin of safety. Being scalable thus means that for a given feed chemistry the instantaneous flow rates of H 2 and CO in the DWPF melter exhaust can be estimated with some degree of conservatism by multiplying those of the respective gases from a pilot-scale melter by the feed rate ratio. This report documents the results of the Phase 1 data analysis and the necessary calculations performed to determine the scalability of the CEF off-gas data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact Of Melter Internal Design On Off-Gas Flammability

The purpose of this study was to: (1) identify the more dominant design parameters that can serve as the quantitative measure of how prototypic a given melter is, (2) run the existing DWPF models to simulate the data collected using both DWPF and non-DWPF melter configurations, (3) confirm the validity of the selected design parameters by determining if the agreement between the model predictions and data is reasonably good in light of the design and operating conditions employed in each data set, and (4) run Computational Fluid Dynamics (CFD) simulations to gain new insights into how fluid mixing is affected by the configuration of melter internals and to further apply the new insights to explaining, for example, why the agreement is not good.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗