Search NASASearch

Engineering topics

Cianciola, Chris

Publications and source records attributed to Cianciola, Chris.

NASA’s Space Launch System Progress Report

NASA’s Space Launch System (SLS) continues to achieve assembly and testing milestones on its way to the launch of the first human-rated spacecraft to the Moon since the Apollo Program. Major flight hardware for Artemis I (see Fig. 1), formerly known as Exploration Mission 1 (EM-1), is complete, including the liquid and solid main propulsion systems. The Artemis I core stage is fully assembled and engine integration and checkout is underway. Structural testing on the core stage engine and payload sections and intertank are complete. Liquid hydrogen tank structural testing is under way, and liquid oxygen tank structural testing will begin in fall 2019. Major structural components for the second and third flights are also in production; hardware has been fabricated for each element of the Artemis II vehicle. SLS and the Orion crew vehicle along with the Exploration Ground Systems (EGS) launch facilities at Kennedy Space Center are critical to the nation’s plans to return to the Moon to stay in a measured, sustainable fashion. Lunar exploration will expand our understanding of Earth’s formation, serve as a proving ground for technologies for pushing deeper into the solar system, and inspire a new generation. This paper will discuss details of 2018-2019 progress and the work ahead to ready SLS for launch.

Honeycutt, John

NASA’s Space Launch System: Exploration Mission-1 Hardware Nears Completion

The Space Launch System (SLS) Program completed several significant production milestones in 2018 for the launch vehicle’s first mission (Fig. 1) and is poised for greater accomplishments in 2019. With manufacturing and hardware installation finished, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The upper stage, the Interim Cryogenic Propulsion Stage (ICPS), and the Orion Stage Adapter (OSA), where 13 6U CubeSats will ride to deep space on EM-1, were completed and delivered to Exploration Ground Systems at KSC in 2017 and 2018, respectively. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John

NASA’s Space Launch System: First Mission Hardware Nears Completion

The Space Launch System (SLS) Program (Fig. 1) completed several significant production milestones in 2018 for its first mission and is poised for greater accomplishments in 2019. With manufacturing and hardware installation complete, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success and scientific discovery. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John

NASA's Space Launch System: Progress Toward Unmatched Exploration Capability

The Space Launch System (SLS) Program delivered the first element of the exploration-class rocket and completed manufacturing of all major structural elements in 2017. The Program continues component integration and testing in 2018 in preparation for the inaugural launch of NASA's new deep space exploration system in fiscal year 2020. SLS represents a new strategic national capability designed for the most challenging human and robotic exploration and is engineered for overall mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2018 and 2019.

Honeycutt, John

Integrating Safety and Mission Assurance in Design

This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safety and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

Cianciola, Chris

Ares Project Overview - Quality in Design

This presentation introduces the audience to the overall goals of the Ares Project, which include providing human access to low-Earth orbit, the Moon, and beyond. The presentation also provides an overview of with the vehicles that will execute those goals and progress made on the vehicles to date. The briefing will provide an introduction to Lean, Six Sigma, and Kaizen practices Ares will use to improve the overall effectiveness and quality of its efforts. Finally, the briefing includes a summary of Safety and Mission Assurance practices being implemented within[Ares to ensure safety and quality early in the design process. Integrating Safety and Mission Assurance in Design: This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safer T and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

Cianciola, Chris