Search NASA⌕ Search

Engineering topics

Cichy, Benjamin D.

Publications and source records attributed to Cichy, Benjamin D..

Key Challenges in Capturing a Boulder for the Asteroid Redirect Robotic Mission

NASA's proposed Asteroid Redirect Mission planned to demonstrate the capability to collect a large boulder from the surface of a Near Earth Asteroid, use that mass of the boulder to demonstrated enhanced asteroid deflection, and return the boulder for future exploration as part of the Asteroid Redirect Crewed Mission. In June of 2017 NASA decided not to continue the Asteroid Redirect Mission. Prior to this decision, the team had made tremendous progress on detailed designs for precision landing, active touchdown, boulder collection, and formation-flying planetary defense

Redirect↗

Asteroid Redirect Mission Proximity Operations for Reference Target Asteroid 2008 EV5

NASA's Asteroid Redirect Mission (ARM) is composed of two segments, the Asteroid Redirect Robotic Mission (ARRM), and the Asteroid Redirect Crewed Mission (ARCM). In March of 2015, NASA selected the Robotic Boulder Capture Option1 as the baseline for the ARRM. This option will capture a multi-ton boulder, (typically 2-4 meters in size) from the surface of a large (greater than approx.100 m diameter) Near-Earth Asteroid (NEA) and return it to cis-lunar space for subsequent human exploration during the ARCM. Further human and robotic missions to the asteroidal material would also be facilitated by its return to cis-lunar space. In addition, prior to departing the asteroid, the Asteroid Redirect Vehicle (ARV) will perform a demonstration of the Enhanced Gravity Tractor (EGT) planetary defense technique2. This paper will discuss the proximity operations which have been broken into three phases: Approach and Characterization, Boulder Capture, and Planetary Defense Demonstration. Each of these phases has been analyzed for the ARRM reference target, 2008 EV5, and a detailed baseline operations concept has been developed.

Reeves, David M.↗

Overview of the Phoenix Entry, Descent and Landing System Architecture

NASA s Phoenix Mars Lander began its journey to Mars from Cape Canaveral, Florida in August 2007, but its journey to the launch pad began many years earlier in 1997 as NASA s Mars Surveyor Program 2001 Lander. In the intervening years, the entry, descent and landing (EDL) system architecture went through a series of changes, resulting in the system flown to the surface of Mars on May 25th, 2008. Some changes, such as entry velocity and landing site elevation, were the result of differences in mission design. Other changes, including the removal of hypersonic guidance, the reformulation of the parachute deployment algorithm, and the addition of the backshell avoidance maneuver, were driven by constant efforts to augment system robustness. An overview of the Phoenix EDL system architecture is presented along with rationales driving these architectural changes.

Grover, Myron R., III↗