Search NASASearch

Engineering topics

Clappier, R. R.

Publications and source records attributed to Clappier, R. R..

A microprocessor-based position control system for a telescope secondary mirror

The pointing requirements for the Shuttle IR Telescope Facility (SIRTF), which consists of an 0.85-m cryogenically cooled IR telescope, call for an image stability of 0.25 arcsec. Attention is presently given to a microprocessor-based position control system developed for the control of the SIRTF secondary mirror, employing a special control law (to minimize energy dissipation), a precision capacitive position sensor, and a specially designed power amplifier/actuator combination. The microprocessor generates the command angular position and rate waveforms in order to maintain a 90 percent dwell time/10 percent transition time ratio independently of chop frequency or amplitude. Performance and test results of a prototype system designed for use with a demonstration model of the SIRTF focal plane fine guidance sensor are presented.

Lorell, K. R.

Development of a London moment readout for a superconducting gyroscope

A gyroscope for verifying certain predictions of General Relativity is under development at Stanford. A method of measuring the gyroscope orientation based on the use of the London moment and a SQUID magnetometer is described. It is estimated that the required sensitivity of 1 milliarc-sec can be achieved in a bandwidth of 2.5 times 10 to the -6th Hz.

Anderson, J. T.

Perform a gyro test of general relativity in a satellite and develop associated control technology

The progress accomplished in the Stanford Gyro Relativity program during the period November 1974 to October 1975 was described. Gyro developments were continued in the main laboratory dewar, concentrating on the operation of a three axis gyro readout and on improvements to the methods of canceling trapped fields in the rotor; these efforts culminated in the first successful observation of the London moment in the spinning gyro rotor in March 1975. Following a review meeting at that time, a new goal was formulated for the next 12 to 18 months, namely to operate a gyroscope in the new ultra-low field facility with readout resolution approaching 1 arc-second. The following other tasks were also completed: (1) sputtering work, (2) magnetometry, (3) construction and installation of the North Star simulator, (4) analysis of torques on the gyro, especially in inclined orbits, (5) equivalence principle accelerometer, and (6) analysis of a twin-satellite test of relativity.

Fairbank, W. M.