Search NASA⌕ Search

Engineering topics

Clautice, W. E.

Publications and source records attributed to Clautice, W. E..

Automatic welding of stainless steel tubing

The use of automatic welding for making girth welds in stainless steel tubing was investigated as well as the reduction in fabrication costs resulting from the elimination of radiographic inspection. Test methodology, materials, and techniques are discussed, and data sheets for individual tests are included. Process variables studied include welding amperes, revolutions per minute, and shielding gas flow. Strip chart recordings, as a definitive method of insuring weld quality, are studied. Test results, determined by both radiographic and visual inspection, are presented and indicate that once optimum welding procedures for specific sizes of tubing are established, and the welding machine operations are certified, then the automatic tube welding process produces good quality welds repeatedly, with a high degree of reliability. Revised specifications for welding tubing using the automatic process and weld visual inspection requirements at the Kennedy Space Center are enumerated.

Clautice, W. E.↗

Automatic Welding of Stainless Steel Tubing

To determine if the use of automatic welding would allow reduction of the radiographic inspection requirement, and thereby reduce fabrication costs, a series of welding tests were performed. In these tests an automatic welder was used on stainless steel tubing of 1/2, 3/4, and 1/2 inch diameter size. The optimum parameters were investigated to determine how much variation from optimum in machine settings could be tolerate and still result in a good quality weld. The process variables studied were the welding amperes, the revolutions per minute as a function of the circumferential weld travel speed, and the shielding gas flow. The investigation showed that the close control of process variables in conjunction with a thorough visual inspection of welds can be relied upon as an acceptable quality assurance procedure, thus permitting the radiographic inspection to be reduced by a large percentage when using the automatic process.

Clautice, W. E.↗

Welding at the Kennedy Space Center

Welding plays a major role in the design, manufacture, and construction of the ground support equipment at the Kennedy Space Center. Three applications of welding are described, i.e., an example of the structural welding of a girder in a mobile launcher (presently designated mobile launcher platform), an example of the repair welding of crawler/transporter shoes, and an example of the welding of the liquid hydrogen and liquid oxygen storage spheres and vacuum jacketed piping in the propellants system. This welding technology was developed during the Apollo and earlier programs. It is now being applied to the Space Shuttle.

Clautice, W. E.↗

Welding vacuum jacketed piping at the Kennedy Space Center

The present work describes fabrication, welding, and repair procedures and specifications for the vacuum jacketed piping used for conveying cryogenic fuels at space vehicle launch sites. The weld inspection procedures are described, and some examples of modifications of the piping are presented.

Clautice, W. E.↗

Induction brazing at the Kennedy Space Center

A description of the joint design, materials, equipment, qualification testing, inspection methods, and applications involved in performing induction brazing on hyperbolic propellants tubing at Kennedy Space Center. Induction brazing is a form of brazing in which the energy is transmitted to the workpiece by electrical induction; the eddy currents generated in the metal produce heat by resistance losses. Since induction heating is fast and highly localized, undesirable heat effects are minimized and the resulting braze is of high quality.

Clautice, W. E.↗

Welding at the Kennedy Space Center.

Brief description of the nature of the mechanical equipment at a space launch complex from a welding viewpoint. including an identification of the major welding applications used in the construction of this complex. The role played by welding in the ground support equipment is noted, including the welded structures and systems required in the vehicle assembly building, the mobile launchers, transporters, mobile service structure, launch pad and launch site, the propellants system, the pneumatics system, and the environmental control system. The welding processes used at the Kennedy Space Center are reviewed, and a particularly detailed account is given of the design and fabrication of the liquid hydrogen and liquid oxygen storage spheres and piping. Finally, the various methods of testing and inspecting the storage spheres are cited.

Clautice, W. E.↗