Search NASA⌕ Search

Engineering topics

Clifford, David J.

Publications and source records attributed to Clifford, David J..

IDC Integrated Master Plan (V.1.0)

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts.

Harris, James Mark↗

IDC System Specification Document (V.1.0)

This document contains the system specifications derived to satisfy the system requirements found in the IDC System Requirements Document for the IDC Reengineering Phase 2 project.

Harris, James Mark↗

IDC Reengineering Phase 2 Risk List

This document contains the risk list for the IDC Reengineering Phase 2 project along with some background information related to the risk process.

42 ENGINEERING↗