Publications and source records attributed to Coffrin, Carleton.
Optimization and Machine Learning Toolbox-Embed trained machine learning predictors in JuMP
Abstract Electric grid faults are increasingly the source of ignition for major wildfires. To reduce the likelihood of such ignitions in high risk situations, utilities use preemptive de‐energization of power lines, commonly referred to as Public Safety Power Shutoffs (PSPS). Besides raising challenging trade‐offs between power outages and wildfire safety, PSPS removes redundancy from the network at a time when component faults are likely to happen. This may leave the network particularly vulnerable to unexpected line faults that may occur while the PSPS is in place. Previous works have not explicitly considered the impacts of these outages. To address this gap, the Security Constrained Optimal Power Shutoff problem is proposed which uses post‐contingency security constraints to model the impact of unexpected line faults when planning a PSPS. This model enables, for the first time, the exploration of a wide range of trade‐offs between both wildfire risk and pre‐ and post‐contingency load shedding when designing PSPS plans, providing useful insights for utilities and policy makers considering different approaches to PSPS. The efficacy of the model is demonstrated using the EPRI 39‐bus system as a case study. The results highlight the potential risks of not considering security constraints when planning PSPS and show that incorporating security constraints into the PSPS design process improves the resilience of current PSPS plans.
The ARPA-E Grid Optimization (GO) Competition Challenge 1, from 2018 to 2019, focused on the basic Security Constrained AC Optimal Power Flow problem (SCOPF) for a single time period. The Challenge utilized sets of unique datasets generated by the ARPA-E GRID DATA program. Each dataset consisted of a collection of power system network models of different sizes with associated operating scenarios (snapshots in time defining instantaneous power demand, renewable generation, generator and line availability, etc.). The datasets were of two types: Real-Time, which included starting-point information, and Online, which did not. Week-Ahead data is also provided for some cases but was not used in the Competition. Although most datasets were synthetic and generated by GRIDDATA, a few came from industry and were only used in the Final Event. All synthetic Input Data and Team Results for the GO Competition Challenge 1 for the Sandbox, Trial Events 1 to 3, and the Final Event along with problem, format, scoring and rules descriptions are available here. Data for industry scenarios will not be made public. Challenge 1, a minimization problem, required two computational steps. Solver 1 or Code 1 solved the base SCOPF problem under a strict wall clock time limit, as would be the case in industry, and reported the base case operating point as output, which was used to compute the Objective Function value that was used as the scenario score. The feasibility of the solution was provided by the Solver 2 or Code 2, which solves the power flow problem for all contingencies based on the results from Solver 1. This is not normally done in industry, so the time limits were relaxed. In fact, there were no time limits for Trial Event 1. This proved to be a mistake, with some codes running for more than 90 hours, and a time limit of 2 seconds per contingency was imposed for all other events. Entrants were free to use their own Solver 2 or use an open-source version provided by the Competition. Containers, such as Docker, were considered to improve the portability of codes, but none that could reliably support a multi-node parallel computing environment, e.g., MPI, could be found. For more information on the competition and challenge see the "GO Competition Challenge 1 Information" and "GO Competition Challenge 1 Additional Information" resources below.
Recent increases in gas-fired power generation have engendered increased interdependencies between natural gas and power transmission systems. These interdependencies have amplified existing vulnerabilities in gas and power grids, where disruptions can require the curtailment of load in one or both systems. Although typically operated independently, coordination of these systems during severe disruptions can allow for targeted delivery to lifeline services, including gas delivery for residential heating and power delivery for critical facilities. To address the challenge of estimating maximum joint network capacities under such disruptions, we consider the task of determining feasible steady-state operating points for severely damaged systems while ensuring the maximal delivery of gas and power loads simultaneously, represented mathematically as the nonconvex joint Maximal Load Delivery (MLD) problem. To increase its tractability, we present a mixed-integer convex relaxation of the MLD problem. Then, to demonstrate the relaxation’s effectiveness in determining bounds on network capacities, exact and relaxed MLD formulations are compared across various multi-contingency scenarios on nine joint networks ranging in size from 25 to 1191 nodes. The relaxation-based methodology is observed to accurately and efficiently estimate the impacts of severe joint network disruptions, often converging to the relaxed MLD problem’s globally optimal solution within ten seconds.
The classic pump scheduling or optimal water flow (OWF) problem for water distribution networks (WDNs) minimizes the cost of power consumption for a given WDN over a fixed time horizon. In its exact form, the OWF is a computationally challenging mixed-integer nonlinear program (MINLP). It is complicated by nonlinear equality constraints that model network physics, discrete variables that model operational controls, and intertemporal constraints that model changes to storage devices. To address the computational challenges of the OWF, this paper develops tight polyhedral relaxations of the original MINLP, derives novel valid inequalities (or cuts) using duality theory, and implements novel optimization-based bound tightening and cut generation procedures. The efficacy of each new method is rigorously evaluated by measuring empirical improvements in OWF primal and dual bounds over 45 literature instances. The evaluation suggests that our relaxation improvements, model strengthening techniques, and a thoughtfully selected polyhedral relaxation partitioning scheme can substantially improve OWF primal and dual bounds, especially when compared with similar relaxation-based techniques that do not leverage these new methods.
This software describes computational tasks for quantum computers that are derived from LANL basic science research applications such as the modeling of materials, chemicals and compounds at atomic scales. The computations focus on quantum simulation tasks, such as quantum dynamics, thermal state preparation and ground state estimation. The primary function of the software is to develop estimates of the requirements for large-scale fault-tolerant quantum computers to solve these scientific computations. The secondary focus of the software are codes for assessing the limitations of conducting quantum computations on classical computers.
This paper summarizes a grid optimization (GO) competition effort in the United States to find the best solution strategies for up to interconnect-scale power system networks with around 32,000 buses. The optimization problem is a mixedinteger, non-convex non-linear problem, (MINLP) and includes discrete variables such as unit commitment and line switching, control settings (transformer taps and phase shifters with impedance correction tables), and bus shunts. The case study includes six actual industry grids as well as 16 realistic synthetic grids created by three different dataset teams. The winners are selected and ranked based on scoring criteria, which consider the solution quality (such as objective functions) within time limits. Nine winner teams are selected from 26 competitor teams. The results achieved by different teams are described and the performance of different algorithms on synthetic grids and actual industry grids are compared and analyzed.
Not Available
The Grid Research for Good Software Tools includes a variety of software packages for working with electric power systems data. It includes: parsers for Matpower, PSS/E, and GRG data files; translators between these formats; and validation routines for network structure and component parameters.