Search NASA⌕ Search

Engineering topics

Coleman, Trevor J.

Publications and source records attributed to Coleman, Trevor J..

MRPP UO x Product Recover System Upgrade

The Material Recovery Pilot Plant (MRPP) produces U 3 O 8 /OU 3 product in powder form. This product must be collected, and cyclonic separators are an efficient method for collecting particles from an air stream. However, the M10 SafeVac currently installed at MRPP has design flaws and is failing. A new, semi-custom cyclonic separator from Hanningfield has been designed and ordered to replace the SafeVac. The Hanningfield model will be more efficient and better designed to suit the recovery at MRPP, increasing the quality of research produced at the plant. Unit cost is $118,000 with a 24 week lead time. It is expected to be operational by January 2025.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demonstration of In Situ Down Blending During ZIRCEX Process

The Material Recovery Pilot Plant has successfully demonstrated in situ down-blending of HEU fuel to support INL’s commitment to HALEU production technologies. Depleted uranium pellets, along with an HEU fuel piece were placed in the hydrochlorinator and subsequently declad and oxidized. UOx product was recovered, analyzed, and demonstrated to have reduced enrichment within the targeted range of 20 – 30 % U-235. This first attempt at in situ down-blending will be followed by continued process refinement over the remaining fuel operations at MRPP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗