Search NASA⌕ Search

Engineering topics

Colette Lepage

Publications and source records attributed to Colette Lepage.

Evaluating the Performance of Portable Air Filter Walls for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Transforming any Facility for Meeting Strict Cleanliness Requirements

Over the life of the James Webb Space Telescope (JWST), Integration & Test (I&T) has taken place in areas that needed considerable work to make the facility itself and/or the protocols used while working in the rooms suitable to meet JWST percent area coverage (PAC) and molecular accumulation requirements. In addition to normal particulate matter, JWST had a uniquely significant challenge: fibers! Fibers not only cause much higher PAC levels, but they also risk damaging the angstrom sized Near Infrared Spectrometer (NIRSpec) microshutter array (MSA), which is critical to NIRSpec instrument performance. The primary emphasis of this paper is to address particulate and fiber contamination. The success of the JWST mission required effective cleanrooms, protocols, and mitigations in non-cleanroom areas that were pressed into service to house contamination-sensitive optics and scientific instruments. Some presented profound challenges. These included: NASA’s 60-year-old Johnson Space Center (JSC) Chamber A, which had never been used for anything contamination-sensitive, and the European tropical launch facilities, which were designed to meet International Standard Organization (ISO) Class 8 processing for communication satellites. The final challenge for JWST, as if to stare us in the face and say, “I dare you to try and make me clean enough,” was preparing the 4 areas in the Centre Spatial Guyanais (CSG) Final Assembly Building (BAF) located in French Guiana, a building in which one entire side opens for Ariane 5 rocket ingress and egress. This paper will describe our initial evaluation processes and the actual work undertaken to transform even the most challenging areas into first class cleanrooms that met JWST particulate and fiber requirements.

James Webb Space Telescope↗

Establishing Cleaning Methods For Cleanroom And Safety Suits At Remote Sites With Available Resources

The James Webb Space Telescope (JWST) spent considerable time in multiple clean facilities during its launch campaign at the Centre Spatial Guyanais (CSG) in French Guiana. Throughout this time, it was imperative that personnel wear approved cleanroom or safety suits when working in proximity to the JWST observatory. This proved to be challenging for two reasons: 1) A large quantity of NASA cleanroom suits needed to be shipped to CSG to account for the heavy volume of NASA and ESA personnel requiring access to the clean facilities. It became evident that shipping clean suits from the US to CSG in a timely fashion during the launch campaign would be challenging. Consequently, a backup plan needed to be established to avoid running out. 2) For safety purposes, Self-Contained Atmospheric Protection Ensemble (SCAPE) and Splash suits were required for hazardous operations. Neither type of suit was cleanroom compatible; therefore, a viable cleaning process needed to be developed to ensure both types of suits met JWST’s approved cleanliness standards. The NASA Contamination Control (CC) team partnered with CSG’s S5E cleanroom and suit processing team. The teams were able to make modifications to the S5E facility to create a NASA approved makeshift clean environment where NASA cleanroom suits and CSG Splash suits were inspected, folded, and bagged for cleanroom use once they were washed and dried. Since SCAPE suits could not be cleaned using conventional methods, a procedure was developed to clean and inspect the suits by the CC team in a temporary clean environment prior to fueling.

James Webb Space Telescope↗