Search NASASearch

Engineering topics

Collart, R. E.

Publications and source records attributed to Collart, R. E..

Control system testing

A three stage process of ground testing of the Space Telescope Pointing Control System is used for verification prior to on-orbit operation. First, development tests are conducted in a laboratory environment using flight/engineering model control sensor and actuators configured with an engineering model of the flight computer and data management system breadboards. These development tests validate the results of computer simulations predicting control system performance. Integration tests bring together flight system elements and software interfaced to a software simulation of vehicle dynamics to confirm closed loop performance. The final ground test phase, flight systems testing, is conducted on the fully assembled Space Telescope, verifies interfaces with the Fine Guidance Sensors and includes a thermal vacuum testing period. During the final test phase, the Point Control System is exercised with the dynamics simulator running in real time.

Whittler, W. H.

Large Space Telescope external interfaces

Key interfaces are described for all LST mission phases: ground test and integration, prelaunch and launch operations, ascent, deployment, operations, on-orbit maintenance, retrieval, deorbit and landing, and refurbishment. These interfaces can be categorized as test and integration, launch operations, Shuttle, data, and mission operations. The interface with the Shuttle and the Shuttle crew is emphasized here because the Shuttle allows a new capability: on-orbit maintenance and ground return. The LST will communicate with the ground elements of the LST system through a space link by means of the Tracking Data Relay Satellite System or directly to the stations of the Space Tracking and Data Network.

Collart, R. E.