Search NASASearch

Engineering topics

Collins, Adam

Publications and source records attributed to Collins, Adam.

LiDAR Point Cloud Data from the 2018 NGEE Arctic UAS Campaign at the Kougarok 64 Field Site, Seward Peninsula, Alaska

Airborne remote sensing data collected from Los Alamos National Laboratory's (LANL) heavy-lift unoccupied aerial system (UAS) hexacopter platform operated by NGEE Arctic scientists from the EES-14 group at Los Alamos National Laboratory. These data were collected in July 2018 at a field site near mile marker 64 along the Kougarok road (Nome-Taylor Highway) between Nome, Alaska and Taylor, Alaska. A DJI Matrice 600 Pro Airframe and Routescene UAV LiDARSystem was used to collect LiDAR data. The LiDAR data has undergone basic post-processing using Routescene LidarViewer Pro software to create point cloud data (.laz files). This data package contains point clouds (.laz), processing metadata files (json.lvp), and post-processed kinematic files (.csv). Ancillary aircraft data, flight mission parameters, weather conditions, raw LiDAR data, and RGB imagery can be found in NGA298.The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES

Progress on LISA Colloid Microthruster Technology Development

Colloid microthrusters have been operated successfully in flight, providing drag-free and precision control for spacecraft that can be used for future applications such as gravity wave and exoplanet observatories. The Space Technology 7 Disturbance Reduction System (ST7- DRS) technology demonstration payload included eight Busek Colloid Micro-Newton Thrusters (CMNTs) as part of the Laser Interferometer Space Antenna (LISA) Pathfinder mission that launched in December of 2015. The CMNTs provided full attitude and precision drag-free control of the spacecraft with <10 nm/√Hz stability along the most sensitive axis during commissioning, nominal, and extended mission phases through April of 2017. Performance requirements (≤0.1 μN/√Hz) were met and models were validated based on on- orbit measurements of test mass motion and actuation during the 60-day nominal and 30-day extended missions. In 2018, the European Space Agency (ESA) selected LISA to be the agency’s next “large-class” mission, currently in Phase A, with a launch scheduled for 2034 and a 12.5-year duration, including the transfer (1.5 years), commissioning (1 year), nominal (4 or 6 years), and extended (6 or 4 years) phases of the mission, which sets the lifetime and consumables requirement. NASA is considering a significant contribution of hardware to the ESA-led mission, potentially including colloid microthrusters. In preparation, NASA is developing five technologies to TRL 5 and 6, including the colloid microthrusters, to be ready for infusion into LISA by the mission adoption review (MAR), currently scheduled for 2024. While ST7-DRS effectively brought the CMNTs to TRL 7, additional lower-TRL flow control components must be developed for full redundancy, reducing the system-level TRL back to 4. Key to the future of the colloid microthruster technology will be to use lessons learned and keep as much of the heritage from the ST7 design as possible while updating the system to support redundancy and lifetime requirements of a flagship-class mission. This paper describes the technology plan and progress to reach TRL 6 by the MAR, focusing on near- term plans to reach TRL 5 by the end of March 2022 for the LISA Colloid Microthrusters (CMTs). Work includes requirements development and sizing studies, breadboard and brassboard hardware developments at Busek, including relevant lifetime and environment testing, and lifetime modeling, verification and validation efforts at JPL, UCLA, and UCI.

Gamero-Castaño, Manuel