Search NASA⌕ Search

Engineering topics

Collins, Emory D.

Publications and source records attributed to Collins, Emory D..

At least 19 records

A novel protocol to recycle zirconium from zirconium alloy cladding from used nuclear fuel rods

A potential new zirconium recycling protocol has been demonstrated using unirradiated Zircaloy-based claddings and depleted uranium oxide for the chemical removal of zirconium alloy cladding in used nuclear fuel (UNF) rods from light water reactors. This protocol is based on the application of three new scientific findings. First, a new lower temperature chlorination reaction of zirconium with sulfur monochloride is described. Second, the high solubility of zirconium chloride in thionyl chloride is used to separate it from uranium oxide fuel and fission and activation contaminants. Finally, in the third step, the zirconium chloride is purified by simple recrystallization from thionyl chloride. Utilizing sulfur chloride solvents for a lower temperature liquid-based chemical digestion and purification of zirconium alloy claddings reduces technical complications experienced by current high temperature gas phase chlorination strategies, such as contamination of product streams. This novel protocol has been demonstrated on a 3–50 g scale of unirradiated zirconium alloy, with no significant change in the time required for complete chlorination (3–4 h). This zirconium chlorination protocol has also been performed in the presence of depleted uranium oxide pellets. The depleted fuel pellets do not affect zirconium chlorination, and the chlorination protocol does not chemically or physically alter the fuel pellets. Finally, a preliminary description of an industrial protocol to recycle nuclear grade zirconium from UNF rods is presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Off-Gas Design and Testing from Advanced Chlorination Process

Chlorination of Zr alloy cladding with sulfur-chloride reagents is being considered as a means of separating the main metal from alloying elements, imbedded U, actinides, and fission and activation products to purify the Zr. This would allow the Zr to be disposed of as low-level nuclear waste or possibly be recycled. A multistage process was developed that involves several steps and waste streams. Recycling of sulfur-chloride reagents S 2 Cl 2 and SOCl 2 is planned to minimize the waste stream. The generation of off-gas and entrainment of volatiles is anticipated to be minimized. However, given the complex nature of spent nuclear fuel (SNF), some volatile components will be generated, including the solvents themselves; Cl 2 used for the regeneration of S 2 Cl 2 ; volatile fission product chlorides, such as Sb and 3 H; and chlorinated alloying components, such as Sn, Nb, Fe, and Mo. This report discusses the chemical phenomena that might give rise to volatile species and their planned capture. The volatility of the transition metals will depend on their oxidation state and the compounds that are formed, such as Zr tritide. Loading radionuclides in the process off-gas will depend on the inputs to the process. For instance, processing separated Zr to reduce waste will have a much lower loading of radionuclides than if alternative chlorination were used for decladding SNF. Much of the volatile process streams will be part of the solvent recycling, which may involve online scrubbing. Generally, a caustic scrubber should be included in the off-gas to remove acidic vapors (e.g., Cl 2 , SOCl 2 ). The decontamination procedures for removing these species could involve pretreatment (i.e., heating) options or reduction by contact with H 2 . This report discusses these options along with a framework for testing these alternatives in future experiments. Technologies for off-gas capture will leverage those developed in the Materials Recovery and Waste Forms program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plutonium-238 Production Program Results, Implications, and Projections from Irradiation and Examination of Initial NpO 2 Test Targets for Improved Production

An alternative target design with potential improvements, including a major increase in 238 Pu production rate and annual capacity; fewer targets to be fabricated, irradiated, and processed; and a significant replacement of a large volume of caustic-nitrate, aluminum-bearing radioactive liquid waste with a smaller volume of solid metal waste, has been conceived and evaluated using reactor physics and thermal-hydraulic analyses. The alternative target design uses pressed pellets of 237 NpO 2 , sintered to 92% to 93% of theoretical density, and stacked inside a Zircaloy-4 cladding tube. Additionally, four test targets were fabricated, irradiated, and examined. No melting or other potential problems were indicated. Projections from measured constituents indicated annual production could be increased by a factor of ~2, and the number of targets required to be fabricated, irradiated, and processed could be reduced by a factor of ~5.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demonstration of Integrated PostIrradiation Process Steps forMultikilogram Amounts of Low- and High-Burnup Used Nuclear Fuels

sponsored research and development (R&D) on the advanced, closed nuclear fuel cycle, including post-irradiation processing of used fuels, recovery of separated components, and preparation of recycle nuclear fuels. During the period 2007–2010, kilogram-scale demonstrations of the integrated processing steps were performed for actual light water reactor (LWR) used nuclear fuels (UNF). These integrated processing demonstrations were called “the Coupled-End-to-End” (CETE) campaigns and were associated with the Global Nuclear Energy Partnership program, which ran concurrently. The demonstrations were carried out in the shielded hot cells and associated gloveboxes located in the Irradiated Fuels Examination Laboratory (IFEL) and the Radiochemical Engineering Development Center (REDC) at the Oak Ridge National Laboratory (ORNL). Limited circulation program reports and a few technical papers were issued. The subject document provides a comprehensive summary of results, technical comparisons, and conclusions obtained from the demonstration campaigns and subsequent associated R&D.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Production of Cf-252 and other transplutonium isotopes at Oak Ridge National Laboratory

In 1957 Glenn T. Seaborg conceived and advocated for the construction of the High Flux Isotope Reactor (HFIR) and the Transuranium Processing Plant (since then renamed the Radiochemical Engineering Development Center, or REDC) at Oak Ridge National Laboratory. There, heavily shielded hot cells, glove boxes, and laboratories allow recovery of transuranium elements produced in substantial quantities. Seaborg’s vision of HFIR and REDC producing milligram quantities of berkelium, californium, and einsteinium has been fulfilled beginning in 1966 through May 2019 with 78 production campaigns yielding a cumulative totals of 1.2 g of 249 Bk, 10.2 g of 252 Cf, 39 mg of 253 Es, and 15 pg of 257 Fm. Notably, 252 Cf is a neutron source used in many industrial applications including oil exploration; process control systems for the cement industry, coal analysis, and power production; sources to start nuclear reactors and perform nondestructive materials analyses; homeland security and national defense detection devices; and medical research. Isotopes made available through transplutonium production at HFIR/REDC have enabled scientists to study the nuclear properties and reactions, chemical properties, optical properties, and solid-state properties of transplutonium elements. Long-lived isotopes have served as targets in heavy ion accelerators to produce heavier elements leading to the discovery of 104 Rf, 105 Db, 106 Sg, 113 Nh, 114 Fl, 115 Mc, 116 Lv, 117 Ts, and 118 Og. This paper reviews the evolution of the processing flowsheets to produce, separate, and purify transplutonium isotopes, which have evolved over 50 years of operation at HFIR and REDC, and summarizes directions of future work to improve the efficiency of the production operations.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Safeguards Challenges and Safeguards Technology Needs Assessment for Leading Thorium Fuel Cycles

Several thorium fuel cycle variants are currently being actively pursued by the global nuclear energy community. These variants have short-, medium-, and long-term deployment pathways in a variety of reactor types, including thorium-fueled molten salt reactors. Those pathways in turn give rise to a variety of fuel designs, fuel cycle facilities, and nuclear material processing requirements. These emerging fuel cycles will impact the technical implementation of safeguards, and they already raise questions about the applicability of current verification technologies. To address this issue, research is being performed to produce a detailed safeguards technology road map. It will include a needs assessment of the detection research and development (R&D;) necessary to transition the current safeguards technology toolkit to meet the verification needs of thorium fuel cycles, and to formulate the scientific basis for building new instrumentation to fill any potential capability gaps. The purpose of this technology road map is to define and inform on the safeguards technology needs for thorium fuel cycles, reflecting only the leading candidate thorium fuel cycles prioritized based on implementation timescales and the current direction of international programs. This work provides a guide to the priorities for future directed R&D; needed to bring the technology readiness levels (TRLs) of safeguards detection solutions in line with the higher TRLs of the most promising thorium fuel cycles. Herein, a summary is presented of thorium fuel cycle options and activities currently under way worldwide, which provides the technical basis for the needs evaluation. The key synergies and differences between these fuel cycles and current conventional uranium- and plutonium-based fuel cycles will be discussed from a nuclear material accountancy and detection standpoint. Reactor inventory calculations, fuel cycle simulations, and conclusions from the safeguards technology needs assessment will be presented, together with plans for experimental validation.

Worrall, Louise G.↗

Completion of a Chlorination Test Using 250 grams of High-Burnup Used Fuel Cladding from a North Anna Pressurized Water Reactor

A second large -scale chlorination test was completed in February 2017 by chlorinating 250 g of used nuclear fuel (UNF) cladding from a North Anna pressurized water reactor (PWR). Analytical results and a Zr mass balance from this test are described and compared with previous results obtained by the Zirconium Recovery and Recycle Project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Zr Recycle Installation of Out-of-Cell Accessory Facilities

Design, fabrication, and installation of the out-of-cell accessory equipment for the Zr Recycle Project tests with actual used nuclear fuel (UNF) cladding was completed on September 9, 2016, shortly before installation of the hot cell equipment. As indicated in Figures 1 and 2, the out -of- cell equipment includes (1) a gas cabinet for a chlorine cylinder, (2) piping and valves, (3) flow control valves, and (4) two shielded plugs in the hot cell walls, one for gas flow piping from the Charging Area and one for electric power and thermocouple instrumentation from the Operating Area. In addition, wiring for flow control signals and piping for Argon gas transfer were run through the existing pass-through tube underneath the hot cell to enable operation of flow controller signals in the Operating Area to the control valves and piping located in the Charging Area. The shielded plug from the Charging Area into the hot cell contains spare lines that can be used in the future for transferring off-gas from the test equipment to tritium traps located in the Charging Area, and then back into the hot cell for caustic scrubbing and venting.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Status Summary of Chemical Processing Development in Plutonium-238 Supply Program

This document summarizes the status of development of chemical processing in the Plutonium-238 Supply Program (PSP) near the end of Demonstration 1. The objective of the PSP is “to develop, demonstrate, and document a production process that meets program objectives and to prepare for its operation” (Frazier et al. 2016).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗