Search NASA⌕ Search

Engineering topics

Colocho, W

Publications and source records attributed to Colocho, W.

First Beam to FACET

The SLAC 3km linear electron accelerator has been reconfigured to provide a beam of electrons to the new Facility for Advanced Accelerator Experimental Tests (FACET) while simultaneously providing an electron beam to the Linac Coherent Light Source (LCLS). On June 23, 2011, the first electron beam was transported through this new facility. Commissioning of FACET is in progress. On June 23, 2011, an electron beam was successfully transported through the new FACET system to a dump in Sector 20 in the linac tunnel. This was achieved while the last third of the linac, operating from the same control room, but with a separate injector system, was providing an electron beam to the Linac Coherent Light Source (LCLS), demonstrating that concurrent operation of the two facilities is practical. With the initial checkout of the new transport line essentially complete, attention is now turning toward compressing the electron bunches longitudinally and focusing them transversely to support a variety of accelerator science experiments.

43 PARTICLE ACCELERATORS↗

Reliability of Operation at SLAC in the LCLS Era

LCLS hardware availability has been above 90% for the first two commissioning runs of the accelerator. In this paper we compare the reliability data for LCLS (availability, MTBF and MTTR) to those of PEP-II, the e{sup +}e{sup -} collider operating previously at SLAC. It may be seen that the linac availability is not significantly different now than it was before, while the availability of the whole LCLS facility is significantly higher than that of the PEP-II facility as a whole (which was about 87%). Most of the improvement is in the MTTR. Ways to improve availability towards the goal of 95% are discussed.

43 PARTICLE ACCELERATORS↗

High-Current Effects in The PEP-II Storage Rings

High beam currents in PEP-II have been a challenge for vacuum system and ring components. For the {approx} 1 cm long bunches peak currents exceed 100 A and modest impedance can give rise to voltage spikes and discharges. During the last two runs, difficulties arose from rf seals at the 'flex flanges' in the HER. High temperatures were seen and the seals turned out to be severely damaged by discharges. In the LER, the horizontal stripline kickers of the bunch-by-bunch feedback system experiences breakdown at high bunch current-Macor pins installed for mechanical stability turned out to be a weak spot causing discharges. Finally, in the HER an experiment to shorten the ion-clearing gap in the beam revealed signs of ion-induced instability indicating that the HER has been operating quite close to the stability limit. The effects shown here are relevant to future high-intensity electron and positron rings like SuperB and PEP-X.

43 PARTICLE ACCELERATORS↗

PEP-II Status

PEP-II and BaBar have just finished run 7, the last run of the SLAC B-factory. PEP-II was one of the few high-current e+e- colliding accelerators and holds the present world record for stored electrons and stored positrons. It has stored 2.07 A of electrons, nearly 3 times the design current of 0.75 A and it has stored 3.21 A of positrons, 1.5 times more than the design current of 2.14 A. High-current beams require careful design of several systems. The feedback systems that control instabilities, the RF system stability loops, and especially the vacuum systems have to handle the higher power demands. We present here some of the accomplishments of the PEP-II accelerator and some of the problems we encountered while running high-current beams.

43 PARTICLE ACCELERATORS↗