Search NASA⌕ Search

Engineering topics

Colotelo, Alison H. A.

Publications and source records attributed to Colotelo, Alison H. A..

American eel resilience to simulated fluid shear associated with passage through hydroelectric turbines

American eel (Anguilla rostrata) populations have declined within their native range along the eastern coast of North America due to factors such as commercial fishing, habitat alteration, and dams. American eel are catadromous fish species, and high mortality rates (>40%) have been observed for freshwater life-stage adult eel passing downstream through hydropower turbines. Lacerations and sectioning of fish have been observed downstream of turbines and these injuries are commonly associated with direct contact with the turbine runner, whether through blade strike or pinching and grinding. Exposure to fluid shear may also be a source of injury, however, little is known about American eel susceptibility to this physical stressor. Eels are considerably flexible when compared to other fish species and lack other morphological characteristics that would make them susceptible to fluid shear, such as protruding eyes, large scales, and large operculum. European eel, which have previously been tested for susceptibility to fluid shear, were found to be resilient. To determine if American eel are also resilient to fluid shear, forty American eel were exposed to a water jet, simulating severe fluid shear (strain rate > 800 s –1 ) that fish may experience when passing downstream through turbines. No immediate or delayed (48 h) signs of injury were observed after exposure to severe fluid shear. Based on this study, and a previous study conducted on American eel susceptibility to barotrauma, the source of injury and mortality of American eel passing through turbines is likely attributed to blade strike or pinching and grinding.

54 ENVIRONMENTAL SCIENCES↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗