Search NASA⌕ Search

Engineering topics

Conner, Alison M.

Publications and source records attributed to Conner, Alison M..

National Reactor Innovation Center (NRIC) Grid Connection Roadmap

In an effort to define the roadmap for establishing the necessary electrical infrastructure at the Idaho National Laboratory to fully support connection of NRIC reactors, this roadmap serves to identify the current forecasted reactors planned for installation at INL and provide a consolidated list of the identified infrastructure improvements that will be necessary to support testing of NRIC reactors. Additionally, the roadmap will leverage this information to establish an integrated timeline to support detailed planning and execution of system improvements. To drive this planning, requirements, as derived from authoritative sources, will be identified. A clear definition of impacted stakeholders will be established, as well as a list of risks that will need to be managed as the program moves forward.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GAIN FY 2021 Walk-in Work (Summary Report)

Walk-in work (WIW) is defined as work that can benefit the nuclear industry and associated stakeholders. Throughout a fiscal year (FY), WIW projects are identified and evaluated by the Gateway for Accelerated Innovation in Nuclear (GAIN) team. Based on funding availability and industry need, the GAIN team determines whether to fund a WIW project and informs the Department of Energy Office of Nuclear Energy (DOE-NE) of these decisions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pre-conceptual Evaluation of DOD Pele Microreactor Sites at Idaho National Laboratory

Members of the INL Land Use Committee met to discuss potential options and make recommendations for siting the Pele microreactor demonstration and testing projects at INL. The Pele microreactor prototype will be a DOE authorized reactor. The evaluation team of subject matter experts (SME) was asked to consider both indoor sites and outdoor sites. A preliminary evaluation was performed by the SME team and based on those discussions the following recommendations were made: (1) Present EBR-II as the most suitable indoor site, and (2) Utilize CITRC Pads A-D as a system of outdoor demonstration and testing sites. Each pad has its own set of attributes that have been established to enable equipment testing and can provide options for various configurations when the group of pads are used as a system of testing sites. Utilizing CITRC Pads A-D as a system of sites offers flexibility in scheduling activities at CITRC to meet existing program schedules and future Pele program demonstration and testing needs with the least programmatic impact.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Science User Facilities FY 2020 Program Performance Summary

The Nuclear Science User Facilities (NSUF) first gathered and reported metric data for Fiscal Year (FY) 2014. The goal of the FY 2014 NSUF Metric Report was to establish metric measures and to provide baseline data to evaluate future performance of the NSUF. Each metric goal and objective was established through NSUF discussions with Department of Energy (DOE) Idaho Operations Office and Office of Nuclear Energy staff. This report provides the data, analysis, and conclusions for the FY 2020 metrics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗