Search NASA⌕ Search

Engineering topics

Cortesi, Marco

Publications and source records attributed to Cortesi, Marco.

Rate-induced aging effects on Parallel-Plate Avalanche Counter (PPAC) caused by heavy ion beams

The Facility for Rare Isotope Beams (FRIB) is one of the premier scientific user facilities for nuclear science with radioactive beams, capable of producing most (approximately 80%) of the isotopes expected to exist, from oxygen to uranium, at energies up to 200 MeV/u. With the increase in beam power from the present 10 kW to the planned 400 kW, FRIB experiments are about to enter a new era. An unprecedented rate capability as well as stable performance of all the planned instrumentation intended for beam diagnostics and beam tuning is required at the expected high beam intensities (> 1 MHz). A summary of aging phenomena at high heavy-ion beam rates observed in the Advanced Rare Isotope Separator (ARIS) detectors for beam diagnostics, including Parallel Plate Avalanche Counters (PPAC) and plastic scintillation for time-of-flight measurements, is discussed. Current research and development project to mitigate rate-induced aging are presented.

Aging effects↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗