Search NASA⌕ Search

Engineering topics

Cory, Karlynn

Publications and source records attributed to Cory, Karlynn.

Industrial Energy Storage Review

As the United States moves to net-zero carbon emission by 2050, a transition to renewable energy generation is required. However, the variable nature of renewable energy generation at high penetrations can cause imbalances in generation and transmission of electricity. These imbalances can be circumvented by the deployment of energy storage. Global industrial energy storage is projected to grow 2.6 times in the coming decades, from just over 60 GWh to 167 GWh in 2030. The challenge is to balance energy storage capabilities with the power and energy needs for particular industrial applications. Energy storage technologies can be classified by the form of the stored energy. The most common forms include thermal, chemical, electrochemical, and mechanical storage technologies. The most appropriate storage technology will depend on the unique energy needs of the industrial application. The purpose of this report is to provide a review of energy storage technologies relevant to the U.S. industrial sector, highlighting the applications in industry that will benefit from increased integration of energy storage, as well as the respective challenges and opportunities unique to integrating different storage technologies.

25 ENERGY STORAGE↗

Frankfort 100 Solar Feasibility Study

In 2021, The city of Frankfort, Kentucky ("Frankfort," or "the City") committed to ambitious climate targets: 1. City Clean Electricity: 100% clean electricity for city government operations by the end of 2023, 2. City Clean Energy: 100% clean energy for city government operations by the end of 2030, and 3. Community Clean Energy: 100% clean energy community-wide by the end of 2040. In 2022, Frankfort partnered with the National Renewable Energy Laboratory for a Phase I study to identify pathways to achieve the City's first two goals of City Clean Electricity by 2023 and City Clean Energy by 2030 (Phase I). As recommended in the final Phase I report described (described below), NREL was asked to perform an initial feasibility study for a PV project to offset the electricity used by city government operations. This report evaluates the feasibility of utility-scale solar and identifies potential barriers.

14 SOLAR ENERGY↗