Implementing EVM Data Analysis Adding Value from a NASA Project Manager's Perspective

Data Analysis is one of the keys to an effective Earned Value Management (EVM) Process. Project Managers (PM) must continually evaluate data in assessing the health of their projects. Good analysis of data can assist PMs in making better decisions in managing projects. To better support our P Ms, National Aeronautics and Space Administration (NASA) - Marshall Space Flight Center (MSFC) recently renewed its emphasis on sound EVM data analysis practices and processes, During this presentation we will discuss the approach that MSFC followed in implementing better data analysis across its Center. We will address our approach to effectively equip and support our projects in applying a sound data analysis process. In addition, the PM for the Space Station Biological Research Project will share her experiences of how effective data analysis can benefit a PM in the decision making process. The PM will discuss how the emphasis on data analysis has helped create a solid method for assessing the project s performance. Using data analysis successfully can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces

Counts, Stacy

NASA EVM Overview and Case Study

The presentation gives an overview of the National Aeronautics and Space Administration (NASA) Earned Value Management (EVM) structure. We briefly talk about the current EVM high-level policies within NASA and the EVM governing structure. It touches on the roles and responsibilities of EVM Focal Points within the Agency. We will also discuss the approach that MSFC followed in implementing EVM and better data analysis within the Habitat Holding Racks (HHR) Project. We will address the approach used at the Marshall Space Flight Center (MSFC) to effectively equip and support MSFC projects in applying a sound EVM and data analysis process. In addition, we will show metrics associated with the HHR project before and after the implementation of EVM on the project. We will discuss the monthly report, using sample data, that the project manager used each month to assess the performance of the project. The data received from EVM helped create a solid method for assessing the project s performance. The use of EVM data analysis can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces. EVM provides project managers with information that can be used in the decision making process.

Kerby, Jerald G.

Putting EVM to the Test

IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.

Kerby, Jerald