Results of the Analyses of SMECT Mercury Sample Collected During Mercury Pump (MB1) Functional Check

A pump added to remove mercury from the sump of the Slurry Mix Evaporator Condensate Tank (SMECT) in DWPF was successfully tested in 2020, resulting in a sample of contaminated mercury obtained from the Mercury Purification Process (MPP) cell. The mercury in the sump of the SMECT was present as a result of steam stripping of sludge slurry in the Sludge Receipt and Adjustment Tank (SRAT) at DWPF. A schematic of the MPP system provided by DWPF personnel is shown in Appendix A. DWPF personnel supplied the following detailed description of the Hg sampling: “The sample provided is the result of DWPF extraction of mercury by means of the Mercury Pump-Water Cart. The Mercury Pump extracted the sample from the SMECT mercury sump. The pump uses pressurized water to transfer a small amount of mercury to a leachate bucket located at the Lab Mercury cell. The mercury and water were allowed to be self separated, and mercury was gravity decanted from the leachate bucket.” DWPF personnel indicate that the leachate bucket is equipped with both a top stopcock/drain and a lower/bottom stopcock/drain from which the mercury was decanted or drained out, while the separated water layer remained above the mercury during draining. The DWPF customer requested SRNL to analyze the sample for the following: gross alpha/nonvolatile beta analysis and perform a Toxicity Characteristic Leaching Procedure (TCLP) per the Environmental Protection Agency's Test Methods for Evaluating Solid Waste: Physical/Chemical Methods, SW-846. While the TCLP was preferred, a Total Metals analysis of the eight Resource Conservation and Recovery Act (RCRA) metals was deemed acceptable.2 The analytical data collected on this mercury sample will be used in planning for sample disposition as well to start a profile for future Hg disposition of Hg collected from steam stripping.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2020 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2020 (CY20) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter CY20 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples. However, data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals for this current 4QCY20 Tank 50 sample will be obtained and documented per the special analysis associated with the vault classification sample as described in the associated TTQAP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 50 Simulant Grout and Toxicity Characteristic Leaching Procedure (TCLP) Results for Methyl Mercury Waste Acceptance Criteria (WAC) Limit

Testing of simulated Tank 50 salt solution grout, spiked with methyl mercury (MeHg) and ionic mercury, used the Toxicity Characteristic Leaching Procedure (TCLP) to evaluate leaching performance with respect to Hg and the Waste Acceptance Criteria (WAC) limits for the Saltstone Production Facility (SPF). This report describes the test parameters for simulant preparation and confirmatory analysis, grout preparation, TCLP leach testing and subsequent leachate analyses. These scoping tests were designed to provide an initial evaluation of the effect of increased MeHg and ionic Hg on the TCLP and were requested by Savannah River Remediation LLC (SRR) through a Technical Assistance Request (TAR). It is expected that this preliminary testing will likely lead to future, more detailed, testing involving the mercury (Hg) WAC and Hg limits with respect to the Tank 50 TCLP for mercury. The TCLP concentrations for total Hg have approached 0.06 mg/L in recent years for Tank 50 radioactive solutions containing up to 105 mg/L of Hg in the form of ionic (Hg(I/II), elemental (Hg(0)) and organo-mercury such as MeHg. In discussions with SRR personnel, it was decided for this non-baseline work to target Hg spike concentrations, using predominately MeHg, in the range of 150 to 350 mg/L total Hg to investigate corresponding Hg TCLP leaching behaviors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Sludge Batch 7b (Macrobatch 9) DWPF Pour Stream Glass Sample

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7b (SB7b), also referred to as Macrobatch 9 (MB9), in January 2012. SB7b is a blend of the heel of Tank 40 from Sludge Batch 7a (SB7a) and the SB7b material that was transferred to Tank 40 from Tank 51. SB7b was processed using Frit 418.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analysis Of The Sludge Batch 7b (Macrobatch 9) DWPF Pour Stream Glass Sample (Rev. 1)

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7b (SB7b), also referred to as Macrobatch 9 (MB9), in January 2012. SB7b is a blend of the heel of Tank 40 from Sludge Batch 7a (SB7a) and the SB7b material that was transferred to Tank 40 from Tank 51. SB7b was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP), which is governed by the DWPF Waste Form Compliance Plan, and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Two pour stream glass samples were collected while processing SB7b. The samples were transferred to the Savannah River National Laboratory (SRNL) where one was analyzed and the other was archived. The following conclusions were drawn from the analytical results provided in this report: The sum of oxides for the official SB7b pour stream glass is within the Product Composition Control System (PCCS) limits (95-105 wt%); The average calculated Waste Dilution Factor (WDF) for SB7b is 2.3. In general, the measured radionuclide content of the official SB7b pour stream glass is in good agreement with the calculated values from the Tank 40 dried sludge results from the SB7b Waste Acceptance Program Specification (WAPS) sample; As in previous pour stream samples, ruthenium and rhodium inclusions were detected by Scanning Electron Microscopy-Electron Dispersive Spectroscopy (SEM-EDS) in the SB7b pour stream sample; The Product Consistency Test (PCT) results indicate that the official SB7b pour stream glass meets the waste acceptance criteria for durability with a normalized boron release of 0.8 g/L, which is an order of magnitude less than the Environmental Assessment (EA) glass; The measured density of the SB7b pour stream glass was 2.70 g/cm 3 ; The Fe 2+ /ΣFe ratio of the SB7b pour stream samples was 0.07.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2018 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2018 (CY18) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter CY18 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50 Saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurements of Hydrogen Generation Rates using a Sealed Reactor System - 19428

Sealed reactor tests were performed to measure the hydrogen generation rate (HGR) from stored radioactive waste at the Savannah River Site. HGR may be very low, on the order of 7.5 x 10{sup -13} (m{sup 3}/h)/L [that is, cubic meters of H{sub 2} generated per hour per liter of radioactive liquid waste, or 10{sup -10} (ft{sup 3}/h)/gal]. Because the estimated HGR limit of detection for an open, continuous flow, system is approximately 7.5 x 10{sup -10} (m{sup 3}/h)/L [or 10{sup -7} (ft{sup 3}/h)/gal], a more sensitive method was needed. By accumulating generated gasses in a sealed system without a continuous purge gas, the resulting concentrations can increase the sensitivity of measurement, which is based on time of heating. In 2017, Savannah River Remediation declared a Potential Inadequacy in the Safety Analysis related to the potential thermal decomposition of organics that generate hydrogen in each of three Liquid Waste facilities: Concentration, Storage and Transfer Facility, Saltstone Production Facility, and the Defense Waste Processing Facility. The research for this study concerns low activity waste of Tank 50, which feeds the Saltstone Production Facility. This study evaluated the impact of organics including formate on the generation of H{sub 2}. Samples of SRS Tank 50 waste, which is a nominal 5 molar sodium salt solution, were sealed in stainless steel reactors and held at varying temperatures, e.g., 50 deg. C, 75 deg. C, 100 deg. C, and 120 deg. C, to determine if organic compounds are decomposing into H2. The experiments included trace solids used to stabilize waste in grout, e.g., grout-premix and Blast Furnace Slag, to determine if any solid phase reactions are present, which would accelerate or inhibit the generation of H{sub 2} at these temperatures. This paper describes the sealed reactors designed and constructed at Savannah River National Laboratory and the radioactive tests that were performed to measure HGR in both oxic and anoxic atmospheres. The shakedown tests showed the sealed reactors to be leak tight and hydrogen concentrations from calibrated standards could be accurately measured. Previous simulant tests helped to perfect the test methods and better design the radioactive tests. The radioactive results showed that the rate of hydrogen generated from Tank 50 waste, over a range of temperatures from 30 deg. C up to 120 deg. C, is bounded by an empirical relation (Hu Equation) that can be used to approximate HGRs in Tank 50 radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2018 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2018 (CY18) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter CY18 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50 Saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the current state of knowledge for thermolysis of organics within SRS waste forming Volatile Organic Compounds (VOCs)

The 2017 report Flammable Gas Generation Mechanisms for High Level Liquid Waste Facilities, X-ESRG- 00062 Rev. 1, assessing mechanisms for flammable gas generation acknowledged the presence of flammable organics, concluding that available data indicated their concentrations pose a minor contribution (e.g., <5%) to the composite lower flammable limit. Savannah River Remediation (SRR) chartered the Savannah River National Laboratory (SRNL) to perform a more detailed assessment of available and emerging data to assess the current state of knowledge for formation of Volatile Organic Compounds (VOCs) from thermolysis of organics in Savannah River Site (SRS) caustic tank waste. Based on the assessment as detailed herein, SRNL concludes that sufficient evidence exists to demonstrate formation of methane, in addition to hydrogen, does occur during thermolysis of SRS high level waste containing organics under select conditions. This assessment cannot reliably quantify the amount of methane that forms. Nevertheless, the potential rates are sufficient – methane generation rates of approximately 30% and 100% those of hydrogen generation rates for Tank 38 radioactive waste and a high boiling point (HBP) simulant waste, respectively – to advise that ongoing program efforts be enhanced to include additional analysis for off-gas generation for concentration and screening measurements for other possible flammable species.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Third Quarter Calendar Year 2018 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Third Quarter Calendar Year 2018 (CY18) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility, where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to Saltstone Production Facility (SPF) Waste Acceptance Criteria (WAC) limits and targets. The chemical and radionuclide contaminant results from the characterization of the Third Quarter CY18 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50 Saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Second Quarter Calendar Year 2018 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Second Quarter Calendar Year 2018 (CY18) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility, where the waste will be treated and disposed in the Saltstone Disposal Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the Current State of Knowledge for Thermolysis of Organics within SRS Waste Forming Volatile Organic Compounds (VOCs)

The 2017 report Flammable Gas Generation Mechanisms for High Level Liquid Waste Facilities , X-ESRG- 00062 Rev. 1, assessing mechanisms for flammable gas generation acknowledged the presence of flammable organics, concluding that available data indicated their concentrations pose a minor contribution (e.g., <5%) to the composite lower flammable limit. Savannah River Remediation (SRR) chartered the Savannah River National Laboratory (SRNL) to perform a more detailed assessment of available and emerging data to assess the current state of knowledge for formation of Volatile Organic Compounds (VOCs) from thermolysis of organics in Savannah River Site (SRS) caustic tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the First Quarter Calendar Year 2017 Tank 50H Salt Solution Sample

In this memorandum, the chemical and radionuclide contaminant results from the First Quarter Calendar Year 2017 (CY17) sample of Tank 50 H salt solution are presented in tabulated form. The First Quarter CY17 Tank 50H samples [a 200 mL sample obtained 6” below the surface (HTF-50-17-7) and a 1 L sample obtained 66” from the tank bottom (HTF-50-17-8)] were obtained on January 15, 2017 and received at Savannah River National Laboratory (SRNL) on January 16, 2017. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours and the samples were pulled immediately after pump shut down. All volatile organic analysis (VOA) and semi-volatile organic analysis (SVOA) were performed on the surface sample and all other analyses were performed on the variable depth sample. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Third Quarter Calendar Year 2017 Tank 50 Salt Solution Sample

In this memorandum, the chemical and radionuclide contaminant results from the Third Quarter Calendar Year 2017 (CY17) sample of Tank 50 salt solution are presented in tabulated form. The Third Quarter CY17 Tank 50 samples [a 200 mL sample obtained 6” below the surface (HTF-50-17-62) and a 1 L sample obtained 66” from the tank bottom (HTF-50-17-63)] were obtained on July 17, 2017 and received at Savannah River National Laboratory (SRNL) on July 17, 2017. Prior to obtaining the samples from Tank 50, a single pump was run at least 4.4 hours and the samples were pulled immediately after pump shut down. All volatile organic analysis (VOA) and semi-volatile organic analysis (SVOA) were performed on the surface sample and all other analyses were performed on the variable depth sample. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the First Quarter Calendar Year 2018 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the First Quarter Calendar Year 2018 (CY18) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. The chemical and radionuclide contaminant results from the characterization of the First Quarter CY18 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) 2 and details of the testing are presented in the Savannah River National Laboratory (SRNL)Task Technical and Quality Assurance Plan (TT QAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. 2 Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50 Saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of glycolate and formate radiolysis and thermolysis on hydrogen generation rate calculations for the Savannah River Site tank farm

Savannah River Remediation (SRR) personnel requested that the Savannah River National Laboratory (SRNL) evaluate available data and determine its applicability to defining the impact of planned glycolate anion additions to Savannah River Site (SRS) High Level Waste (HLW) on Tank Farm flammability (primarily with regard to H 2 production). Flammability evaluations of formate anion, which is already present in SRS waste, were also needed. This report describes the impacts of glycolate and formate radiolysis and thermolysis on Hydrogen Generation Rate (HGR) calculations for the SRS Tank Farm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the first quarter calendar year 2017 tank 50H salt solution sample

In this memorandum, the chemical and radionuclide contaminant results from the First Quarter Calendar Year 2017 (CY17) sample of Tank 50H salt solution are presented in tabulated form. The First Quarter CY17 Tank 50H samples [a 200 mL sample obtained 6” below the surface (HTF-50-17-7) and a 1 L sample obtained 66” from the tank bottom (HTF-50-17-8)] were obtained on January 15, 2017 and received at Savannah River National Laboratory (SRNL) on January 16, 2017. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours and the samples were pulled immediately after pump shut down. All volatile organic analysis (VOA) and semi-volatile organic analysis (SVOA) were performed on the surface sample and all other analyses were performed on the variable depth sample. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. The chemical and radionuclide contaminant results from the characterization of the First Quarter CY17 sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan (TTQAP). This memorandum is part of Deliverable 2 from SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50H saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge batch 9 follow-on actual-waste testing for the nitric-glycolic flowsheet

An actual-waste Sludge Batch 9 qualification run with the nitric-glycolic flowsheet (SC-18) was performed in FY16. In order to supplement the knowledge base for the nitric-glycolic flowsheet, additional testing was performed on the product slurries, condensates, and intermediate samples from run SC-18.